EP3356144 - CARD SUBSTRATE LAMINATING DEVICE AND METHOD [Right-click to bookmark this link] | |||
Former [2018/32] | CARD SUBSTRATE LAMINATING DEVICE | ||
[2020/45] | Status | No opposition filed within time limit Status updated on 29.10.2021 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 20.11.2020 | ||
Former | Grant of patent is intended Status updated on 11.10.2020 | ||
Former | Examination is in progress Status updated on 16.11.2019 | ||
Former | Request for examination was made Status updated on 06.07.2018 | ||
Former | The international publication has been made Status updated on 08.04.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states ASSA ABLOY AB P.O. Box 70340 107 23 Stockholm / SE | [2020/37] |
Former [2018/32] | For all designated states Assa Abloy AB Klarabergviadukten 90 111 64 Stockholm / SE | Inventor(s) | 01 /
SKOGLUND, John 5505 42nd Avenue W. Minneapolis, Minnesota 55417 / US | 02 /
WOIZESCHKE, Michael 1208 Sapphire Lane Shakopee, Minnesota 55438 / US | 03 /
HOFFMAN, Ted 8720 Darnel Road Eden Prairie, Minnesota 55344 / US | 04 /
SNYDER, Tanya 5705 Lois Lane Edina, Minnesota 55439 / US | [2018/32] | Representative(s) | DTS Patent- und Rechtsanwälte PartmbB Brienner Straße 1 80333 München / DE | [N/P] |
Former [2018/32] | DTS Patent- und Rechtsanwälte Schnekenbühl und Partner mbB Marstallstrasse 8 80539 München / DE | Application number, filing date | 15779026.2 | 02.10.2015 | [2018/32] | WO2015IB57561 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017055897 | Date: | 06.04.2017 | Language: | EN | [2017/14] | Type: | A1 Application with search report | No.: | EP3356144 | Date: | 08.08.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.04.2017 takes the place of the publication of the European patent application. | [2018/32] | Type: | B1 Patent specification | No.: | EP3356144 | Date: | 23.12.2020 | Language: | EN | [2020/52] | Search report(s) | International search report - published on: | EP | 06.04.2017 | Classification | IPC: | B32B37/00 | [2018/32] | CPC: |
B32B37/0053 (EP,KR,US);
B29C65/7802 (US);
B29C66/83411 (US);
B32B37/025 (EP,KR,US);
B32B37/06 (KR);
B32B37/065 (US);
B32B37/226 (US);
B32B37/26 (KR);
B29C66/834 (US);
B32B2037/268 (KR);
B32B2309/02 (US);
B32B2425/00 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | LAMINIERVORRICHTUNG FÜR KARTENGRUNDKÖRPER UND VERFAHREN | [2020/45] | English: | CARD SUBSTRATE LAMINATING DEVICE AND METHOD | [2020/45] | French: | DISPOSITIF DE STRATIFICATION DE SUBSTRAT DE CARTE ET PROCÉDÉ | [2020/45] |
Former [2018/32] | LAMINIERVORRICHTUNG FÜR KARTENGRUNDKÖRPER | ||
Former [2018/32] | CARD SUBSTRATE LAMINATING DEVICE | ||
Former [2018/32] | DISPOSITIF DE STRATIFICATION DE SUBSTRAT DE CARTE | Entry into regional phase | 30.04.2018 | National basic fee paid | 30.04.2018 | Designation fee(s) paid | 30.04.2018 | Examination fee paid | Examination procedure | 30.04.2018 | Amendment by applicant (claims and/or description) | 30.04.2018 | Examination requested [2018/32] | 30.04.2018 | Date on which the examining division has become responsible | 20.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 09.03.2020 | Reply to a communication from the examining division | 11.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.06.2020 | Reply to a communication from the examining division | 12.10.2020 | Communication of intention to grant the patent | 12.11.2020 | Fee for grant paid | 12.11.2020 | Fee for publishing/printing paid | 12.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 24.09.2021 | No opposition filed within time limit [2021/48] | Fees paid | Renewal fee | 30.04.2018 | Renewal fee patent year 03 | 11.10.2018 | Renewal fee patent year 04 | 15.10.2019 | Renewal fee patent year 05 | 14.10.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.10.2015 | AL | 23.12.2020 | AT | 23.12.2020 | CY | 23.12.2020 | CZ | 23.12.2020 | DK | 23.12.2020 | EE | 23.12.2020 | ES | 23.12.2020 | FI | 23.12.2020 | HR | 23.12.2020 | IT | 23.12.2020 | LT | 23.12.2020 | LV | 23.12.2020 | MC | 23.12.2020 | MK | 23.12.2020 | NL | 23.12.2020 | PL | 23.12.2020 | RO | 23.12.2020 | RS | 23.12.2020 | SE | 23.12.2020 | SI | 23.12.2020 | SK | 23.12.2020 | SM | 23.12.2020 | BG | 23.03.2021 | NO | 23.03.2021 | GR | 24.03.2021 | IS | 23.04.2021 | PT | 23.04.2021 | [2024/22] |
Former [2023/30] | HU | 02.10.2015 | |
AL | 23.12.2020 | ||
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2023/29] | HU | 02.10.2015 | |
AL | 23.12.2020 | ||
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/33] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/23] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/13] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2022/10] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2022/08] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/49] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/48] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/45] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/42] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/39] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/37] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/36] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/35] | CZ | 23.12.2020 | |
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/33] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/32] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/30] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/28] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/24] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/23] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/22] | FI | 23.12.2020 | |
RS | 23.12.2020 | ||
NO | 23.03.2021 | ||
Former [2021/20] | FI | 23.12.2020 | Cited in | International search | [A]US3027285 (EISNER BURTON D, et al) [A] 1-14 * column 1; figures 1,2; claim 4 *; | [A]DE102011080929 (INFINEON TECHNOLOGIES AG [DE]) [A] 1-14* paragraphs [0050] , [0051]; figure 1A *; | [IA]WO2014022088 (HID GLOBAL CORP [US]) [I] 1,2,5-9,12-14 * paragraphs [0047] - [0052]; figure 2 * [A] 3,4,10,11; | [XA]US8956490 (KARST KARL A [US]) [X] 1,2,5-9,12-14 * column 6, lines 38-67; figure 9 * [A] 3,4,10,11 |