EP3224179 - GUIDING DEVICE FOR AN ELEVATOR SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 29.09.2022 | ||
Former | Examination is in progress Status updated on 16.04.2021 | ||
Former | Request for examination was made Status updated on 01.09.2017 | ||
Former | The international publication has been made Status updated on 05.05.2017 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): FR | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states TK Elevator Innovation and Operations GmbH E-Plus-Straße 1 LCL 40472 Düsseldorf / DE | [2022/46] |
Former [2020/22] | For all designated states thyssenkrupp Elevator Innovation and Operations AG ThyssenKrupp Allee 1 45143 Essen / DE | ||
Former [2018/31] | For all designated states thyssenkrupp Elevator AG ThyssenKrupp Allee 1 45143 Essen / DE | ||
For all designated states thyssenkrupp AG ThyssenKrupp Allee 1 45143 Essen / DE | |||
Former [2017/40] | For all designated states ThyssenKrupp Elevator AG ThyssenKrupp Allee 1 45143 Essen / DE | ||
For all designated states thyssenkrupp AG ThyssenKrupp Allee 1 45143 Essen / DE | Inventor(s) | 01 /
KIRSCH, Michael Weisestraße 3 73230 Kirchheim unter Teck / DE | 02 /
HOFFMANN, Walter Schwalbenweg 16a 65527 Niedernhausen / DE | 03 /
KUCZERA, Thomas Kasparswaldstrasse 37 70771 Leinfelden-Echterdingen / DE | 04 /
OBERT, Mike Jakob-Kast-Strasse 22/2 76593 Gernsbach / DE | [2017/40] | Representative(s) | Jacobi, Nicolas, et al TK Elevator GmbH Abt. Legal, Compliance and Labor Relations (LCL) E-Plus-Straße 1 40472 Düsseldorf / DE | [2023/09] |
Former [2017/40] | thyssenkrupp Intellectual Property GmbH ThyssenKrupp Allee 1 45143 Essen / DE | Application number, filing date | 15784055.4 | 22.10.2015 | [2017/40] | WO2015EP74457 | Priority number, date | DE201410224084 | 26.11.2014 Original published format: DE102014224084 | [2017/40] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2016083031 | Date: | 02.06.2016 | Language: | DE | [2016/22] | Type: | A2 Application without search report | No.: | EP3224179 | Date: | 04.10.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 02.06.2016 takes the place of the publication of the European patent application. | [2017/40] | Type: | B1 Patent specification | No.: | EP3224179 | Date: | 01.03.2023 | Language: | DE | [2023/09] | Search report(s) | International search report - published on: | EP | 21.07.2016 | Classification | IPC: | B66B7/04, B66B9/02, B66B9/08, B66B11/04 | [2017/40] | CPC: |
B66B11/0407 (EP);
B66B7/044 (EP);
B66B9/02 (EP);
B66B9/0807 (EP);
B66B9/0846 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FÜHRUNGSEINRICHTUNG FÜR EIN AUFZUGSYSTEM | [2017/40] | English: | GUIDING DEVICE FOR AN ELEVATOR SYSTEM | [2017/40] | French: | DISPOSITIF DE GUIDAGE POUR SYSTÈME D'ASCENSEUR | [2017/40] | Entry into regional phase | 11.05.2017 | National basic fee paid | 11.05.2017 | Designation fee(s) paid | 11.05.2017 | Examination fee paid | Examination procedure | 11.05.2017 | Examination requested [2017/40] | 11.05.2017 | Date on which the examining division has become responsible | 21.02.2018 | Amendment by applicant (claims and/or description) | 16.04.2021 | Despatch of a communication from the examining division (Time limit: M06) | 11.10.2021 | Reply to a communication from the examining division | 30.09.2022 | Communication of intention to grant the patent | 19.01.2023 | Fee for grant paid | 19.01.2023 | Fee for publishing/printing paid | 19.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 25.10.2017 | Renewal fee patent year 03 | 24.10.2018 | Renewal fee patent year 04 | 25.10.2019 | Renewal fee patent year 05 | 23.10.2020 | Renewal fee patent year 06 | 25.10.2021 | Renewal fee patent year 07 | 25.10.2022 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | GB | 22.10.2023 | LU | 22.10.2023 | FR | 31.10.2023 | [2024/34] |
Former [2024/33] | CZ | 01.03.2023 | |
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
IT | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
GB | 22.10.2023 | ||
LU | 22.10.2023 | ||
Former [2024/30] | CZ | 01.03.2023 | |
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
IT | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
LU | 22.10.2023 | ||
Former [2024/28] | CZ | 01.03.2023 | |
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
IT | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/26] | CZ | 01.03.2023 | |
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
IT | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | CZ | 01.03.2023 | |
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | CZ | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | CZ | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | EE | 01.03.2023 | |
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Cited in | International search | [X]US7019421 (HALL DAVID J [US], et al) [X] 1,4,6-13 * paragraph [0002]; figures 1-4 ** columns 3,4 *; | [X]WO2008136692 (MAGLEVVISION CORP [PH], et al) [X] 1-3,5,6,12,14,15 * page 10, lines 1-24; figures 1-4,7 * * page 12, lines 17-23 * |