EP3207737 - METHODS AND APPARATUSES FOR FLEXIBLE MOBILE STEERING IN CELLULAR NETWORKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 19.02.2021 | ||
Former | Grant of patent is intended Status updated on 12.10.2020 | ||
Former | Examination is in progress Status updated on 18.03.2019 | ||
Former | Request for examination was made Status updated on 21.07.2017 | ||
Former | The international publication has been made Status updated on 29.03.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Apple Inc. One Apple Park Way Cupertino, CA 95014 / US | [2021/12] |
Former [2020/52] | For all designated states Apple Inc. One Apple Park Way Cupertino, CA 95014 / US | ||
Former [2017/34] | For all designated states Intel IP Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | Inventor(s) | 01 /
SHAN, Changhong c/o Intel IP Corporation 2200 Mission College Boulevard Santa Clara CA 95054 / US | 02 /
VENKATACHALAM, Muthaiah 16620 NW Paddington Drive Beaverton, Oregon 97006 / US | 03 /
JAIN, Puneet 203 NE 61st. Terrace Hillsboro, Oregon 97124 / US | 04 /
STOJANOVSKI, Alexandre S. 6 Villa Faucheur F-75020 Paris / FR | [2021/12] |
Former [2017/34] | 01 /
SHAN, Changhong 23F No. 2299 West Yan'an Road Shanghai 31 200336 / CN | ||
02 /
VENKATACHALAM, Muthaiah 16620 NW Paddington Drive Beaverton, Oregon 97006 / US | |||
03 /
JAIN, Puneet 203 NE 61st. Terrace Hillsboro, Oregon 97124 / US | |||
04 /
STOJANOVSKI, Alexandre S. 6 Villa Faucheur 75 F-75020 Paris / FR | Representative(s) | Gillard, Matthew Paul Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
Former [2021/12] | Gillard, Matthew Paul Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | ||
Former [2017/34] | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | Application number, filing date | 15788517.9 | 16.10.2015 | [2017/34] | WO2015US55898 | Priority number, date | US201462065214P | 17.10.2014 Original published format: US 201462065214 P | [2017/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2016061436 | Date: | 21.04.2016 | Language: | EN | [2016/16] | Type: | A2 Application without search report | No.: | EP3207737 | Date: | 23.08.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.04.2016 takes the place of the publication of the European patent application. | [2017/34] | Type: | B1 Patent specification | No.: | EP3207737 | Date: | 24.03.2021 | Language: | EN | [2021/12] | Search report(s) | International search report - published on: | EP | 09.06.2016 | Classification | IPC: | H04L12/26, H04W28/02, H04L12/851, H04L12/801, H04L12/721, H04L12/24 | [2020/39] | CPC: |
H04L45/38 (EP,KR,US);
H04W28/02 (RU);
H04L41/0893 (US);
H04L41/0894 (EP,KR,RU);
H04L43/0876 (KR);
H04L45/306 (KR);
H04L45/308 (KR);
H04L47/12 (US);
H04L47/2483 (EP,US);
|
Former IPC [2017/34] | H04W28/02, H04L29/08, H04L12/851, H04L12/801, H04L12/721, H04L12/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR FLEXIBLEN MOBILEN LENKUNG IN MOBILTELEFONNETZWERKEN | [2017/34] | English: | METHODS AND APPARATUSES FOR FLEXIBLE MOBILE STEERING IN CELLULAR NETWORKS | [2017/34] | French: | PROCÉDÉS ET APPAREILS POUR L'ORIENTATION MOBILE FLEXIBLE DANS DES RÉSEAUX CELLULAIRES | [2017/34] | Entry into regional phase | 29.03.2017 | National basic fee paid | 29.03.2017 | Designation fee(s) paid | 29.03.2017 | Examination fee paid | Examination procedure | 01.07.2016 | Request for preliminary examination filed International Preliminary Examining Authority: US | 29.03.2017 | Examination requested [2017/34] | 29.03.2017 | Date on which the examining division has become responsible | 30.11.2017 | Amendment by applicant (claims and/or description) | 21.03.2019 | Despatch of a communication from the examining division (Time limit: M06) | 30.09.2019 | Reply to a communication from the examining division | 03.02.2020 | Despatch of a communication from the examining division (Time limit: M06) | 12.08.2020 | Reply to a communication from the examining division | 13.10.2020 | Communication of intention to grant the patent | 16.02.2021 | Fee for grant paid | 16.02.2021 | Fee for publishing/printing paid | 16.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 11.10.2017 | Renewal fee patent year 03 | 11.10.2018 | Renewal fee patent year 04 | 15.10.2019 | Renewal fee patent year 05 | 14.10.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.10.2015 | AL | 24.03.2021 | AT | 24.03.2021 | CY | 24.03.2021 | CZ | 24.03.2021 | DK | 24.03.2021 | EE | 24.03.2021 | ES | 24.03.2021 | FI | 24.03.2021 | HR | 24.03.2021 | IT | 24.03.2021 | LT | 24.03.2021 | LV | 24.03.2021 | MC | 24.03.2021 | MK | 24.03.2021 | NL | 24.03.2021 | PL | 24.03.2021 | RO | 24.03.2021 | RS | 24.03.2021 | SE | 24.03.2021 | SI | 24.03.2021 | SK | 24.03.2021 | SM | 24.03.2021 | BG | 24.06.2021 | NO | 24.06.2021 | GR | 25.06.2021 | IS | 24.07.2021 | PT | 26.07.2021 | IE | 16.10.2021 | LU | 16.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | FR | 31.10.2021 | LI | 31.10.2021 | [2024/22] |
Former [2023/30] | HU | 16.10.2015 | |
AL | 24.03.2021 | ||
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/29] | HU | 16.10.2015 | |
AL | 24.03.2021 | ||
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/10] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/48] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/41] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/37] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/35] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.10.2021 | ||
Former [2022/23] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/13] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 24.12.2021 | ||
Former [2022/10] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 24.12.2021 | ||
Former [2022/08] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/07] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/52] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/51] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/50] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
Former [2021/48] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/46] | AT | 24.03.2021 | |
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/43] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/38] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/37] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/36] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/35] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
NO | 24.06.2021 | ||
Former [2021/33] | FI | 24.03.2021 | |
NO | 24.06.2021 | Cited in | Examination | WO2013170897 |