EP3157297 - PAGING REPETITON LEVEL IN ENHANCED COVERAGE [Right-click to bookmark this link] | |||
Former [2017/16] | PAGING MESSAGE RECEPTION/TRANSMISSION METHOD, RELATED USER EQUIPMENT, BASE STATION, AND NETWORK DEVICE | ||
[2020/25] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 27.05.2020 | ||
Former | Examination is in progress Status updated on 13.04.2018 | ||
Former | Request for examination was made Status updated on 20.03.2017 | ||
Former | The international publication has been made Status updated on 22.11.2016 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Sharp Kabushiki Kaisha 1, Takumi-cho Sakai-ku Sakai City, Osaka 590-8522 / JP | [2017/16] | Inventor(s) | 01 /
SHEN, Xingya c/o Sharp Laboratories of China CO., LTD. Bldg. 2 No.1387 Zhangdong Road Semiconductor Harbor, Zhangjiang High-tech Park, Pudong New District Shanghai 201203 / CN | 02 /
LIU, Renmao c/o Sharp laboratories of China CO., LTD. Bldg. 2-02 No.1387 Zhangdong Road Pudong Shanghai 201203 / CN | 03 /
JIANG, Qi c/o Sharp Laboratories of China CO., LTD. Bldg. 2 No.1387 Zhangdong Road Semiconductor Harbor, Zhangjiang High-tech Park, Pudong New District Shanghai 201203 / CN | [2017/16] | Representative(s) | Müller Hoffmann & Partner Patentanwälte mbB St.-Martin-Straße 58 81541 München / DE | [N/P] |
Former [2017/16] | Müller Hoffmann & Partner Patentanwälte mbB St.-Martin-Strasse 58 81541 München / DE | Application number, filing date | 15789392.6 | 06.05.2015 | [2017/16] | WO2015CN78360 | Priority number, date | CN201410194023 | 08.05.2014 Original published format: CN201410194023 | [2017/16] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015169218 | Date: | 12.11.2015 | Language: | ZH | [2015/45] | Type: | A1 Application with search report | No.: | EP3157297 | Date: | 19.04.2017 | Language: | EN | [2017/16] | Type: | B1 Patent specification | No.: | EP3157297 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | CN | 12.11.2015 | (Supplementary) European search report - dispatched on: | EP | 26.07.2017 | Classification | IPC: | H04W68/02, H04W4/70, // H04W92/04, H04W88/14, H04W68/00 | [2020/25] | CPC: |
H04W4/70 (EP,US);
H04W68/005 (EP,US);
H04W68/02 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2017/34] | H04W68/02, H04W4/00, H04W68/00 | ||
Former IPC [2017/16] | H04W68/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FUNKRUFWIEDERHOLUNGSNIVEAUS IN EINER VERBESSERTEN ABDECKUNG | [2020/25] | English: | PAGING REPETITON LEVEL IN ENHANCED COVERAGE | [2020/25] | French: | NIVEAU DE RÉPÉTITION DE RADIOMESSAGERIE DANS UNE COUVERTURE AMÉLIORÉE | [2020/25] |
Former [2017/16] | FUNKRUFNACHRICHTENEMPFANGS-/-ÜBERTRAGUNGSVERFAHREN, ZUGEHÖRIGES BENUTZERGERÄT, BASISSTATION UND NETZWERKVORRICHTUNG | ||
Former [2017/16] | PAGING MESSAGE RECEPTION/TRANSMISSION METHOD, RELATED USER EQUIPMENT, BASE STATION, AND NETWORK DEVICE | ||
Former [2017/16] | PROCÉDÉ DE RÉCEPTION/D'ÉMISSION DE MESSAGES DE RADIORECHERCHE, ÉQUIPEMENT D'UTILISATEUR, STATION DE BASE ET DISPOSITIF DE RÉSEAU APPARENTÉS | Entry into regional phase | 22.11.2016 | Translation filed | 22.11.2016 | National basic fee paid | 22.11.2016 | Search fee paid | 22.11.2016 | Designation fee(s) paid | 22.11.2016 | Examination fee paid | Examination procedure | 22.11.2016 | Examination requested [2017/16] | 22.11.2016 | Date on which the examining division has become responsible | 20.02.2018 | Amendment by applicant (claims and/or description) | 11.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.08.2018 | Reply to a communication from the examining division | 29.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.01.2019 | Reply to a communication from the examining division | 13.03.2019 | Invitation to indicate the basis for amendments (Time limit: M01) | 23.04.2019 | Reply to an invitation to indicate the basis for amendments | 16.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 26.09.2019 | Reply to a communication from the examining division | 11.05.2020 | Cancellation of oral proceeding that was planned for 12.05.2020 | 12.05.2020 | Date of oral proceedings (cancelled) | 28.05.2020 | Communication of intention to grant the patent | 19.08.2020 | Fee for grant paid | 19.08.2020 | Fee for publishing/printing paid | 19.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 23.05.2017 | Renewal fee patent year 03 | 25.05.2018 | Renewal fee patent year 04 | 23.05.2019 | Renewal fee patent year 05 | 30.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.05.2015 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | TR | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | IE | 06.05.2021 | LU | 06.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/29] |
Former [2024/22] | HU | 06.05.2015 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 06.05.2021 | ||
LU | 06.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | HU | 06.05.2015 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 06.05.2021 | ||
LU | 06.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/29] | HU | 06.05.2015 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 06.05.2021 | ||
LU | 06.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 06.05.2021 | ||
LU | 06.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 06.05.2021 | ||
LU | 06.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
IE | 06.05.2021 | ||
LU | 06.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
LU | 06.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
LU | 06.05.2021 | ||
Former [2022/07] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/23] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Documents cited: | Search | [I]WO2011084024 (SAMSUNG ELECTRONICS CO LTD [KR], et al) [I] 1-6 * paragraph [0075] * * figure 5c *; | [I]EP2373110 (VODAFONE IP LICENSING LTD [GB]) [I] 1-6 * paragraph [0091] - paragraph [0093] * * paragraph [0099] *; | [I]WO2014055878 (INTERDIGITAL PATENT HOLDINGS [US]) [I] 1-6 * paragraph [0284] *; | [I] - RATASUK RAPEEPAT ET AL, "Coverage enhancement for M2M communications using LTE", 2014 21ST INTERNATIONAL CONFERENCE ON TELECOMMUNICATIONS (ICT), IEEE, doi:10.1109/ICT.2014.7575093, ISBN 978-1-4799-5139-0, (20140504), pages 482 - 486, (20160922), XP032969700 [I] 1-6 * page 483, column r, paragraph 2 * * page 485, column l, paragraph 1 - paragraph 3 * DOI: http://dx.doi.org/10.1109/ICT.2014.7575093 | [A] - Sassan Ahmadi, LTE-Advanced: A Practical Systems Approach to Understanding 3GPP LTE Releases 10 and 11 Radio Access Technologies, Oxford, UK, Academic Press, (20131114), pages 604 - 608, ISBN 0124051626, XP002772176 [A] 1-6 * page 607 * | International search | [X]CN1478362 (ARRAYCOMM INC [US]) [X] 9, 28, 30, 34, 35 * , description, page 18, paragraph 2 to page 20, paragraph 6 *; | [X]US7062294 (ROGARD ROGER [FR], et al) [X] 9, 28, 30, 34, 35 * , description, column 15, line 24 to column 17, line 52 *; | [A]CN101267596 (HUAWEI TECH CO LTD [CN]) [A] 1-39* , the whole document * |