blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3369213

EP3369213 - PERFORMANCE MEASUREMENT IN A PACKET-SWITCHED COMMUNICATION NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.06.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  03.07.2020
FormerGrant of patent is intended
Status updated on  27.02.2020
FormerExamination is in progress
Status updated on  16.04.2019
FormerRequest for examination was made
Status updated on  03.08.2018
FormerThe international publication has been made
Status updated on  05.05.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Telecom Italia S.p.A.
Via Gaetano Negri, 1
20123 Milano / IT
[2018/36]
Inventor(s)01 / COCIGLIO, Mauro
Telecom Italia S.p.A.
Via G. Reiss Romoli 274
I-10148 Torino / IT
02 / FANTOLINO, Luca
Telecom Italia S.p.A.
Via G. Reiss Romoli 274
I-10148 Torino / IT
 [2018/36]
Representative(s)Pietra, Giulia, et al
Marchi & Partners S.r.l.
Via Vittor Pisani, 13
20124 Milano / IT
[2018/36]
Application number, filing date15790891.430.10.2015
[2018/36]
WO2015EP75344
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017071779
Date:04.05.2017
Language:EN
[2017/18]
Type: A1 Application with search report 
No.:EP3369213
Date:05.09.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 04.05.2017 takes the place of the publication of the European patent application.
[2018/36]
Type: B1 Patent specification 
No.:EP3369213
Date:05.08.2020
Language:EN
[2020/32]
Search report(s)International search report - published on:EP04.05.2017
ClassificationIPC:H04L12/26
[2018/36]
CPC:
H04L43/028 (EP,KR,US); H04L43/0829 (EP,KR,US); H04L43/024 (EP,KR);
H04L43/026 (US); H04L43/0817 (US); H04L43/0852 (EP,KR,US);
H04L43/106 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/36]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:LEISTUNGSMESSUNG IN EINEM PAKETVERMITTELTEN KOMMUNIKATIONSNETZWERK[2018/36]
English:PERFORMANCE MEASUREMENT IN A PACKET-SWITCHED COMMUNICATION NETWORK[2018/36]
French:MESURAGE DE PERFORMANCE DANS UN RÉSEAU DE COMMUNICATION À COMMUTATION DE PAQUETS[2018/36]
Entry into regional phase16.05.2018National basic fee paid 
16.05.2018Designation fee(s) paid 
16.05.2018Examination fee paid 
Examination procedure16.05.2018Examination requested  [2018/36]
16.05.2018Date on which the examining division has become responsible
06.12.2018Amendment by applicant (claims and/or description)
23.04.2019Despatch of a communication from the examining division (Time limit: M06)
25.10.2019Reply to a communication from the examining division
28.02.2020Communication of intention to grant the patent
24.06.2020Fee for grant paid
24.06.2020Fee for publishing/printing paid
24.06.2020Receipt of the translation of the claim(s)
Opposition(s)07.05.2021No opposition filed within time limit [2021/28]
Fees paidRenewal fee
16.05.2018Renewal fee patent year 03
29.10.2018Renewal fee patent year 04
28.10.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.10.2015
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
MT05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
IE30.10.2020
LU30.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
[2022/32]
Former [2022/27]HU30.10.2015
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MT05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
IE30.10.2020
LU30.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/46]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
IE30.10.2020
LU30.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/37]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
LU30.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/36]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
LU30.10.2020
BE31.10.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/31]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SK05.08.2020
SM05.08.2020
LU30.10.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/28]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/25]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/22]AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/21]AT05.08.2020
DK05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RS05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/10]AT05.08.2020
ES05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RS05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/09]AT05.08.2020
ES05.08.2020
LT05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
PT07.12.2020
Former [2021/07]LT05.08.2020
NO05.11.2020
Cited inInternational search[I]EP1130850  (TEKTRONIX INC [US]) [I] 1,2,10,13-15 * paragraph [0012] - paragraph [0028]; figure 1 *;
 [XYI]US6873600  (DUFFIELD NICHOLAS G [US], et al) [X] 1,2,10,13-15 * column 6, line 36 - column 24, line 3; figures 1, 5b,11 * [Y] 6-9,11,12 [I] 3-5;
 [I]EP1936867  (CORVIL LTD [IE]) [I] 1-3,10,11,13-15 * paragraph [0049] - paragraph [0062]; figure 6 *;
 [Y]WO2012059138  (TELECOM ITALIA SPA [IT], et al) [Y] 6-9,11,12* page 10, line 15 - page 30, line 16; figures 1-8 *;
 [YD]WO2013174417  (TELECOM ITALIA SPA [IT], et al) [YD] 6-9,11,12 * page 11, line 11 - page 40, line 24; figures 1-5 *;
 [I]  - DUFFIELD ED AT(OEB_ENTITY_AMPERSAND)AMP N ET AL, "A Framework for Packet Selection and Reporting; rfc5474.txt", A FRAMEWORK FOR PACKET SELECTION AND REPORTING; RFC5474.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20090301), XP015065543 [I] 1,2,10,13-15 * page 4, line 1 - page 30, line 16 *
by applicantWO2010072251
 WO2013174417
 WO2015042171
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.