blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3120004

EP3120004 - ACTUATION ASSEMBLY AND METHOD OF OPERATING AN ACTUATOR [Right-click to bookmark this link]
Former [2017/04]ACTUATION METHOD AND EFFICIENCY
[2019/12]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  05.07.2019
FormerGrant of patent is intended
Status updated on  06.03.2019
FormerRequest for examination was made
Status updated on  23.12.2016
FormerThe international publication has been made
Status updated on  04.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Eaton Corporation
1000 Eaton Boulevard
Cleveland, OH 44122 / US
[2017/04]
Inventor(s)01 / NYZEN, Robert
18982 Claridon Troy Road
Hiram, OH 44234 / US
02 / CLEMENTS, Martin, A.
6581 Devonshire Drive
North Royalton, OH 44133 / US
 [2017/04]
Representative(s)Schwan Schorer & Partner mbB
Patentanwälte
Bauerstraße 22
80796 München / DE
[N/P]
Former [2017/04]Schwan Schorer & Partner mbB
Patentanwälte
Bauerstrasse 22
80796 München / DE
Application number, filing date15802430.717.03.2015
[2017/04]
WO2015US20897
Priority number, dateUS201461954484P17.03.2014         Original published format: US 201461954484 P
[2017/04]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2015187230
Date:10.12.2015
Language:EN
[2015/49]
Type: A2 Application without search report 
No.:EP3120004
Date:25.01.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 10.12.2015 takes the place of the publication of the European patent application.
[2017/04]
Type: B1 Patent specification 
No.:EP3120004
Date:07.08.2019
Language:EN
[2019/32]
Search report(s)International search report - published on:US07.04.2016
(Supplementary) European search report - dispatched on:EP10.11.2017
ClassificationIPC:F02C7/232, F02C7/236, F04C14/02
[2017/50]
CPC:
F04C14/02 (EP,US); F04D15/0005 (US); B64D37/005 (US);
F02C7/236 (EP,US); F04C2/084 (US); F04D1/06 (US);
F04C2270/185 (EP,US); F05D2260/76 (EP,US) (-)
Former IPC [2017/04]F02C9/52, F02C9/38, F02C7/232
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/04]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:BETÄTIGUNGSANORDNUNG UND VERFAHREN ZUM BETREIBEN EINER BETÄTIGUNGSANORDNUNG[2019/12]
English:ACTUATION ASSEMBLY AND METHOD OF OPERATING AN ACTUATOR[2019/12]
French:ENSEMBLE D'ACTIONNEMENT ET PROCÉDÉ DE FONCTIONNEMENT D'UN ACTIONNEUR[2019/12]
Former [2017/04]BETÄTIGUNGSVERFAHREN UND EFFIZIENZ
Former [2017/04]ACTUATION METHOD AND EFFICIENCY
Former [2017/04]PROCÉDÉ D'ACTIONNEMENT ET RENDEMENT
Entry into regional phase12.10.2016National basic fee paid 
12.10.2016Search fee paid 
12.10.2016Designation fee(s) paid 
12.10.2016Examination fee paid 
Examination procedure12.10.2016Examination requested  [2017/04]
12.10.2016Date on which the examining division has become responsible
04.06.2018Amendment by applicant (claims and/or description)
07.03.2019Communication of intention to grant the patent
27.06.2019Fee for grant paid
27.06.2019Fee for publishing/printing paid
27.06.2019Receipt of the translation of the claim(s)
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Fees paidRenewal fee
07.03.2017Renewal fee patent year 03
23.03.2018Renewal fee patent year 04
22.03.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.03.2015
AL07.08.2019
AT07.08.2019
CY07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
MK07.08.2019
MT07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE17.03.2020
LU17.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/32]
Former [2022/28]HU17.03.2015
AL07.08.2019
AT07.08.2019
CY07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
MT07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE17.03.2020
LU17.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/12]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE17.03.2020
LU17.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/07]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE17.03.2020
LU17.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
LU17.03.2020
Former [2020/50]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/37]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/36]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/27]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SK07.08.2019
SM07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
IS24.02.2020
Former [2020/25]AL07.08.2019
AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
IS24.02.2020
Former [2020/24]AL07.08.2019
AT07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
IS24.02.2020
Former [2020/23]AL07.08.2019
AT07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
IT07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
RS07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/22]AL07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
RS07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/17]AL07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
RS07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/15]AL07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
RS07.08.2019
SE07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/12]ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
RS07.08.2019
SE07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/11]ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
NL07.08.2019
RS07.08.2019
SE07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/10]FI07.08.2019
LT07.08.2019
NL07.08.2019
SE07.08.2019
BG07.11.2019
NO07.11.2019
PT09.12.2019
Former [2020/09]FI07.08.2019
LT07.08.2019
NL07.08.2019
NO07.11.2019
Former [2020/08]LT07.08.2019
NO07.11.2019
Documents cited:Search[XA]US5116362  (ARLINE SAMUEL B [US], et al) [X] 1,4-8,11-14 * figure 4 * [A] 2,3,9,10,15;
 [X]US2010263634  (FUTA JR PAUL W [US], et al) [X] 1,4-6,8,11 * figure 1 * * paragraph [0017] *;
 [XA]WO2013025818  (EATON CORP [US], et al) [X] 1,4-6,8,11,12 * paragraph [0024] * * figures 1,2 * [A] 7,13;
 [X]WO2013166122  (EATON CORP [US]) [X] 1,4,5,7,8,11-14* figures 3a,3b *
International search[YA]US3433016  (BOREL RONALD F) [Y] 3, 5-7, 13, 15-17 * entire document, especially fig. 1; col 3, In 7-32, col 5, In 1-5. * [A] 9-10, 19-20;
 [XYA]US3441200  (HUESGEN EUGENE L) [X] 1-2, 4, 11-12, 14 * entire document, especially fig. 1; col 2, In 47-51, col 3, In 5-40, col 4, In 8-11. * [Y] 3, 5-7, 8, 13, 15-17, 18 [A] 9-10, 19-20;
 [A]US6022197  (CYGNOR JOHN EDWARD [US], et al) [A] 9-10, 19-20* entire document, especially see fig. 1; col 3, In 10-11, 15-17, 44-45, 62-67. *;
 [A]US8166765  (BAKER CARTHEL C [US], et al) [A] 9-10, 19-20 * entire document, especially Title, Abstract; fig. 1 *;
 [A]US8291886  (MAHONEY TIMOTHY D [US], et al) [A] 9-10, 19-20 * entire document, especially fig. 1, col 3, In 25-27, 63-67, col 6, In 38-33, col 4, In 5-7. *
 [Y]  - Applicant's Own Admitted Prior Art [Y] 8, 18
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.