EP3160451 - BUCCAL AND SUBLINGUAL CANNABINOID FORMULATIONS AND METHOD OF MAKING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 20.10.2020 | ||
Former | Examination is in progress Status updated on 30.07.2020 | ||
Former | Grant of patent is intended Status updated on 22.03.2020 | ||
Former | Examination is in progress Status updated on 18.01.2019 | ||
Former | Request for examination was made Status updated on 31.03.2017 | ||
Former | The international publication has been made Status updated on 23.01.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states FARM TO FARMA, INC. 1005 Terminal Way STE 140 Reno, NV 89502 / US | [2021/35] |
Former [2017/37] | For all designated states FARM TO FARMA, INC. 930 Tahoe Blvd., Ste. 802-433 Incline Village, NV 89451 / US | ||
Former [2017/18] | For all designated states Crowley, Kenton L. 40970 Alton Court Temecula, California 92591-6948 / US | Inventor(s) | 01 /
Crowley, Kenton L. 40970 Alton Court Temecula, CA 92591-6948 / US | [2017/37] |
Former [2017/18] | 01 /
see applicant ... | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2017/18] | Application number, filing date | 15812123.6 | 26.06.2015 | [2017/18] | WO2015US38132 | Priority number, date | US201462018484P | 27.06.2014 Original published format: US 201462018484 P | [2017/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015200864 | Date: | 30.12.2015 | Language: | EN | [2015/52] | Type: | A1 Application with search report | No.: | EP3160451 | Date: | 03.05.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.12.2015 takes the place of the publication of the European patent application. | [2017/18] | Type: | B1 Patent specification | No.: | EP3160451 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | International search report - published on: | KR | 30.12.2015 | (Supplementary) European search report - dispatched on: | EP | 01.06.2018 | Classification | IPC: | A61K9/20, A61K47/30, A61K47/36, A61K47/42, A61K47/44, A61K36/752, A61K36/906 | [2017/18] | CPC: |
A61K36/185 (EP,US);
A61K31/05 (EP,US);
A61K31/352 (EP,US);
A61K36/534 (EP,US);
A61K45/06 (EP,US);
A61K9/006 (EP,US)
| C-Set: |
A61K31/05, A61K2300/00 (EP,US);
A61K31/352, A61K2300/00 (US,EP);
A61K36/185, A61K2300/00 (US,EP);
A61K36/534, A61K2300/00 (US,EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | INTRAORALE UND SUBLINGUALE CANNABINOID-FORMULIERUNGEN UND VERFAHREN ZUR HERSTELLUNG DAVON | [2017/18] | English: | BUCCAL AND SUBLINGUAL CANNABINOID FORMULATIONS AND METHOD OF MAKING THE SAME | [2017/18] | French: | FORMULATIONS DE CANNABINOÏDE BUCCALE ET SUBLINGUALE, ET LEUR PROCÉDÉ DE FABRICATION | [2017/18] | Entry into regional phase | 23.01.2017 | National basic fee paid | 23.01.2017 | Search fee paid | 23.01.2017 | Designation fee(s) paid | 23.01.2017 | Examination fee paid | Examination procedure | 23.01.2017 | Examination requested [2017/18] | 23.01.2017 | Date on which the examining division has become responsible | 20.12.2018 | Amendment by applicant (claims and/or description) | 21.01.2019 | Despatch of a communication from the examining division (Time limit: M02) | 29.03.2019 | Reply to a communication from the examining division | 23.03.2020 | Communication of intention to grant the patent | 29.07.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.10.2020 | Communication of intention to grant the patent | 01.03.2021 | Fee for grant paid | 01.03.2021 | Fee for publishing/printing paid | 01.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 16.06.2017 | Renewal fee patent year 03 | 12.06.2018 | Renewal fee patent year 04 | 13.06.2019 | Renewal fee patent year 05 | 31.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.06.2015 | AL | 07.04.2021 | AT | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | MT | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | IE | 26.06.2021 | LU | 26.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | [2024/41] |
Former [2024/22] | HU | 26.06.2015 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2023/30] | HU | 26.06.2015 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2023/28] | HU | 26.06.2015 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/34] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/21] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
LU | 26.06.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/08] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | Documents cited: | Search | [X]US2006039959 (WESSLING WERNER [DE]) [X] 1-15 * paragraphs [0012] , [0030]; claim 1 *; | [A]US2012095088 (HOSPODOR ANDREW DAVID [US]) [A] 1-15* paragraphs [0020] , [0090] - [0091] *; | [A]WO2014100231 (KOTZKER CONSULTING LLC [US]) [A] 1-15 * page 14, lines 5-6 * * page 31, lines 17,20-21 * | International search | [X]US2004138293 (WERNER MICHAEL [DE], et al) [X] 1-21 * See paragraph [0011]; and claims 1-14. *; | [A]US2005153931 (JARHO PEKKA [FI], et al) [A] 1-21 * See abstract; and claims 1-4. *; | [X]US2008181942 (ZAJICEK JOHN [GB]) [X] 1-21 * See abstract; and paragraphs [0032]-[0034], [0038], [0042], [0044], [0049], [0060]. *; | [A]US2010008985 (PELLIKAAN HUBERT CLEMENS [NL], et al) [A] 1-21* See abstract; and claims 18-34. *; | [A]US2014166027 (FUISZ RICHARD C [US], et al) [A] 1-21 * See abstract; paragraphs [0060], [0080]-[0085]; and claim 1. * |