blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3163074

EP3163074 - CONDITION MONITORING SYSTEM AND WIND POWER GENERATION SYSTEM USING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.02.2021
Database last updated on 09.07.2024
FormerThe patent has been granted
Status updated on  20.03.2020
FormerGrant of patent is intended
Status updated on  05.11.2019
FormerRequest for examination was made
Status updated on  31.03.2017
FormerThe international publication has been made
Status updated on  28.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NTN Corporation
3-17, Kyomachibori 1-chome Nishi-ku
Osaka-shi, Osaka 550-0003 / JP
[2017/18]
Inventor(s)01 / SAKAGUCHI, Tomoya
c/o NTN CORPORATION
105 Hidamarinooka 5-chome
Kuwana-shi Mie 511-0867 / JP
02 / KATOU, Kouma
c/o NTN CORPORATION
105 Hidamarinooka 5-chome
Kuwana-shi Mie 511-0867 / JP
 [2017/18]
Representative(s)Bockhorni & Brüntjen Partnerschaft Patentanwälte mbB
Agnes-Bernauer-Straße 88
80687 München / DE
[N/P]
Former [2020/17]Bockhorni & Brüntjen Partnerschaft Patentanwälte mbB
Elsenheimerstraße 49
80687 München / DE
Former [2017/18]Bockhorni & Kollegen
Elsenheimerstraße 49
80687 München / DE
Application number, filing date15812286.129.05.2015
[2017/18]
WO2015JP65592
Priority number, dateJP2014012905224.06.2014         Original published format: JP 2014129052
JP2014012905724.06.2014         Original published format: JP 2014129057
[2017/18]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015198793
Date:30.12.2015
Language:JA
[2015/52]
Type: A1 Application with search report 
No.:EP3163074
Date:03.05.2017
Language:EN
[2017/18]
Type: B1 Patent specification 
No.:EP3163074
Date:22.04.2020
Language:EN
[2020/17]
Search report(s)International search report - published on:JP30.12.2015
(Supplementary) European search report - dispatched on:EP23.02.2018
ClassificationIPC:F03D7/04
[2017/18]
CPC:
F03D17/00 (EP,US); F03D7/04 (EP,US); F03D80/00 (EP,US);
F03D9/25 (EP,US); F05B2220/706 (EP,US); F05B2240/912 (EP,US);
F05B2260/80 (EP,US); Y02E10/72 (EP,US); Y02E10/728 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/18]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:ZUSTANDSÜBERWACHUNGSSYSTEM UND WINDENERGIEERZEUGUNGSSYSTEM DAMIT[2017/18]
English:CONDITION MONITORING SYSTEM AND WIND POWER GENERATION SYSTEM USING SAME[2017/18]
French:SYSTÈME DE SURVEILLANCE DE CONDITIONS ET SYSTÈME DE GÉNÉRATION D'ÉNERGIE ÉOLIENNE L'UTILISANT[2017/18]
Entry into regional phase28.12.2016Translation filed 
28.12.2016National basic fee paid 
28.12.2016Search fee paid 
28.12.2016Designation fee(s) paid 
28.12.2016Examination fee paid 
Examination procedure28.12.2016Examination requested  [2017/18]
28.12.2016Date on which the examining division has become responsible
20.08.2018Amendment by applicant (claims and/or description)
06.11.2019Communication of intention to grant the patent
16.03.2020Fee for grant paid
16.03.2020Fee for publishing/printing paid
16.03.2020Receipt of the translation of the claim(s)
Opposition(s)25.01.2021No opposition filed within time limit [2021/13]
Fees paidRenewal fee
23.05.2017Renewal fee patent year 03
29.05.2018Renewal fee patent year 04
27.05.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.05.2015
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MK22.04.2020
MT22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
GB22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
[2022/32]
Former [2022/27]HU29.05.2015
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MT22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
GB22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/48]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
GB22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/23]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
FR22.06.2020
BG22.07.2020
GB22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/22]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
IE29.05.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
GB22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/20]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
IE29.05.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/15]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/10]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/09]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/08]AL22.04.2020
DK22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/07]AL22.04.2020
DK22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
CH31.05.2020
LI31.05.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/04]AL22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/01]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/51]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/50]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/48]FI22.04.2020
LT22.04.2020
NL22.04.2020
SE22.04.2020
NO22.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/47]LT22.04.2020
NO22.07.2020
IS22.08.2020
Former [2020/46]IS22.08.2020
Documents cited:Search[X]EP2522977  (NTN TOYO BEARING CO LTD [JP]) [X] 1-17 * abstract *;
 [X]US2013261988  (LIM KHOON PENG [SG], et al) [X] 1-17 * paragraph [0022]; figures 1-3 *;
 [X]EP2687857  (GEN ELECTRIC [US]) [X] 1-17 * paragraphs [0005] , [0006] , [0008] , [0028] , [0029]; figure 3 *;
 [X]WO2011058099  (SCHAEFFLER TECHNOLOGIES GMBH [DE], et al) [X] 1-17 * page 2, paragraph 3 - page 3, paragraph 3; figure 2 *;
 [X]US2014054894  (OLESEN IB SVEND [DK]) [X] 1-17 * paragraph [0062] - paragraph [0064] *
International search[YA]US2014054894  (OLESEN IB SVEND [DK]) [Y] 1-2, 4-17 * , paragraphs [0002], [0062] to [0064]; fig. 1 to 3 & EP 2697613 A2 * [A] 3;
 [Y]JPH07218333  (NIPPON STEEL CORP) [Y] 1-2, 4-17 * , paragraphs [0001] to [0027]; fig. 1 to 6 (Family: none) *;
 [Y]JP2000146771  (NIPPON STEEL CORP) [Y] 1-2, 4-17 * , paragraphs [0007] to [0013]; fig. 1 to 3 (Family: none) *;
 [Y]WO2011121781  (MITSUBISHI HEAVY IND LTD [JP], et al) [Y] 6-8, 10-17 * , paragraph [0018] & US 2011/0162865 A1 *;
 [Y]WO2013065323  (NAT MARITIME RES INST [JP]) [Y] 7-8, 10-17 * , paragraph [0091] (Family: none) *;
 [Y]JPH10288546  (NIPPON KOKAN KK) [Y] 10-17 * , paragraphs [0001] to [0032]; fig. 1 to 6 (Family: none) *;
 [A]JP2012092757  (SUMITOMO HEAVY INDUSTRIES) [A] 1-17 * , paragraphs [0001] to [0069]; fig. 1 to 7 & CN 102454547 A *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.