EP3243025 - LIGHT EMITTING ARRANGEMENT FOR ILLUMINATED SURFACES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.07.2019 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 10.08.2018 | ||
Former | Grant of patent is intended Status updated on 15.03.2018 | ||
Former | Request for examination was made Status updated on 13.10.2017 | ||
Former | The international publication has been made Status updated on 02.06.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Signify Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | [2019/11] |
Former [2018/50] | For all designated states Philips Lighting Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | ||
Former [2017/46] | For all designated states Philips Lighting Holding B.V. High Tech Campus 45 5656 AE Eindhoven / NL | Inventor(s) | 01 /
VAN BOMMEL, Ties c/o High Tech Campus 5 5656 AE Eindhoven / NL | 02 /
HIKMET, Rifat Ata Mustafa c/o High Tech Campus 5 5656 AE Eindhoven / NL | [2017/46] | Representative(s) | Verweij, Petronella Daniëlle Signify Netherlands B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [N/P] |
Former [2017/46] | Verweij, Petronella Daniëlle Philips Lighting B.V. Philips Lighting Intellectual Property High Tech Campus 45 5656 AE Eindhoven / NL | Application number, filing date | 15817276.7 | 18.12.2015 | [2017/46] | WO2015EP80572 | Priority number, date | EP20150150193 | 06.01.2015 Original published format: EP 15150193 | [2017/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016110400 | Date: | 14.07.2016 | Language: | EN | [2016/28] | Type: | A1 Application with search report | No.: | EP3243025 | Date: | 15.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.07.2016 takes the place of the publication of the European patent application. | [2017/46] | Type: | B1 Patent specification | No.: | EP3243025 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Search report(s) | International search report - published on: | EP | 14.07.2016 | Classification | IPC: | F21V8/00 | [2017/46] | CPC: |
G02B6/001 (EP,CN,US);
G02B6/0006 (EP,CN,US);
F21S8/03 (US);
F21V13/08 (EP,US);
F21V33/0012 (US);
F21V33/0028 (US);
F21V33/006 (EP,CN,US);
F21V9/45 (EP,US);
F21V2200/15 (CN);
F21W2121/00 (US);
F21W2131/00 (EP,CN,US);
F21W2131/301 (EP,CN,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LICHTEMITTIERENDE ANORDNUNG FÜR BELEUCHTETE FLÄCHEN | [2018/11] | English: | LIGHT EMITTING ARRANGEMENT FOR ILLUMINATED SURFACES | [2017/46] | French: | DISPOSITIF D'ÉMISSION DE LUMIÈRE POUR SURFACES ÉCLAIRÉES | [2018/11] |
Former [2017/46] | LICHTEMITTIERENDE ANORDNUNG FÜR BELEUCHTETE OBERFLÄCHEN | ||
Former [2017/46] | SYSTÈME D'ÉMISSION DE LUMIÈRE POUR SURFACES ÉCLAIRÉES | Entry into regional phase | 07.08.2017 | National basic fee paid | 07.08.2017 | Designation fee(s) paid | 07.08.2017 | Examination fee paid | Examination procedure | 02.06.2017 | Amendment by applicant (claims and/or description) | 02.06.2017 | Date on which the examining division has become responsible | 07.08.2017 | Examination requested [2017/46] | 16.03.2018 | Communication of intention to grant the patent | 13.07.2018 | Fee for grant paid | 13.07.2018 | Fee for publishing/printing paid | 13.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 13.06.2019 | No opposition filed within time limit [2019/34] | Fees paid | Renewal fee | 02.01.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.12.2015 | AL | 12.09.2018 | AT | 12.09.2018 | CY | 12.09.2018 | CZ | 12.09.2018 | DK | 12.09.2018 | EE | 12.09.2018 | ES | 12.09.2018 | FI | 12.09.2018 | HR | 12.09.2018 | IT | 12.09.2018 | LT | 12.09.2018 | LV | 12.09.2018 | MC | 12.09.2018 | MK | 12.09.2018 | NL | 12.09.2018 | PL | 12.09.2018 | RO | 12.09.2018 | RS | 12.09.2018 | SE | 12.09.2018 | SI | 12.09.2018 | SK | 12.09.2018 | SM | 12.09.2018 | TR | 12.09.2018 | BG | 12.12.2018 | NO | 12.12.2018 | GR | 13.12.2018 | IE | 18.12.2018 | LU | 18.12.2018 | MT | 18.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | IS | 12.01.2019 | PT | 12.01.2019 | [2020/31] |
Former [2020/17] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IE | 18.12.2018 | ||
LU | 18.12.2018 | ||
MT | 18.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/08] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IE | 18.12.2018 | ||
LU | 18.12.2018 | ||
MT | 18.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/04] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IE | 18.12.2018 | ||
LU | 18.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/51] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IE | 18.12.2018 | ||
LU | 18.12.2018 | ||
BE | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/48] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IE | 18.12.2018 | ||
LU | 18.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/40] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
LU | 18.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/39] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
LU | 18.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/37] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/34] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/26] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/23] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/22] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/21] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/20] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/12] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/11] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/10] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/08] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
NO | 12.12.2018 | ||
Former [2019/07] | LT | 12.09.2018 | Cited in | International search | [A]US2004188639 (MASUDA MASATSUGU [JP], et al) [A] 1-14 * paragraphs [0019] , [0020] * * paragraphs [0061] , [0062] , [0067] , [0068] * * figures 1,2,6 *; | [A]US6851844 (GUY JAMES K [US]) [A] 1-14 * column 1, line 12 - line 19 * * column 3, line 51 - column 4, line 22 * * column 6, lines 16-28,41-47 * * figure 1 *; | [A]GB2461689 (SHARP KK [JP]) [A] 6-9 * figures 1-5 *; | [A]US2010053990 (BROCHIER CEDRIC [FR], et al) [A] 4 * figures 2,3 *; | [A]EP2447746 (KONINKL PHILIPS ELECTRONICS NV [NL]) [A] 6-9 * figures 2c,3a-3l *; | [A]US2014185316 (KIM HYOUNG-JOO [KR], et al) [A] 6-9* figures 8-10 * |