EP3168321 - PRODUCTION METHOD FOR ALLOYED HOT-DIP-GALVANIZED STEEL SHEET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.10.2019 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 16.11.2018 | ||
Former | Grant of patent is intended Status updated on 25.07.2018 | ||
Former | Request for examination was made Status updated on 18.04.2017 | ||
Former | The international publication has been made Status updated on 13.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states JFE Steel Corporation 2-3, Uchisaiwaicho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | [2017/20] | Inventor(s) | 01 /
TAKEDA, Gentaro c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 02 /
MIYAKE, Masaru c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 03 /
MAKIMIZU, Yoichi c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 04 /
SUZUKI, Yoshitsugu c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 05 /
SUZUKI, Yoshikazu c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | [2017/20] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2017/20] | Application number, filing date | 15818936.5 | 05.06.2015 | [2017/20] | WO2015JP02851 | Priority number, date | JP20140140012 | 07.07.2014 Original published format: JP 2014140012 | [2017/20] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016006159 | Date: | 14.01.2016 | Language: | JA | [2016/02] | Type: | A1 Application with search report | No.: | EP3168321 | Date: | 17.05.2017 | Language: | EN | [2017/20] | Type: | B1 Patent specification | No.: | EP3168321 | Date: | 19.12.2018 | Language: | EN | [2018/51] | Search report(s) | International search report - published on: | JP | 14.01.2016 | (Supplementary) European search report - dispatched on: | EP | 02.05.2017 | Classification | IPC: | C23C2/02, C21D9/56, C23C2/06, C23C2/28, C23C2/40, C22C38/00, C22C38/04 | [2017/20] | CPC: |
C21D9/561 (EP,KR,US);
C23C2/29 (KR);
C21D9/56 (EP,US);
C21D9/573 (KR);
C22C38/04 (EP,KR,US);
C23C2/0035 (EP,US);
C23C2/0038 (EP,US);
C23C2/004 (EP,US);
C23C2/022 (KR);
C23C2/0222 (EP,US);
C23C2/0224 (EP,US);
C23C2/06 (EP,KR,US);
C23C2/28 (EP,US);
C23C2/40 (EP,KR,US);
C23C2/52 (EP,US);
C22C38/00 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | HERSTELLUNGSVERFAHREN FÜR LEGIERTES FEUERVERZINKTES STAHLBLECH | [2017/20] | English: | PRODUCTION METHOD FOR ALLOYED HOT-DIP-GALVANIZED STEEL SHEET | [2017/20] | French: | PROCÉDÉ DE FABRICATION DE TÔLE D'ACIER ALLIÉ GALVANISÉ | [2017/20] | Entry into regional phase | 13.12.2016 | Translation filed | 13.12.2016 | National basic fee paid | 13.12.2016 | Search fee paid | 13.12.2016 | Designation fee(s) paid | 13.12.2016 | Examination fee paid | Examination procedure | 13.12.2016 | Examination requested [2017/20] | 13.12.2016 | Date on which the examining division has become responsible | 27.11.2017 | Amendment by applicant (claims and/or description) | 26.07.2018 | Communication of intention to grant the patent | 02.11.2018 | Fee for grant paid | 02.11.2018 | Fee for publishing/printing paid | 02.11.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 20.09.2019 | No opposition filed within time limit [2019/48] | Fees paid | Renewal fee | 27.06.2017 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.06.2015 | AL | 19.12.2018 | AT | 19.12.2018 | CY | 19.12.2018 | CZ | 19.12.2018 | DK | 19.12.2018 | EE | 19.12.2018 | ES | 19.12.2018 | FI | 19.12.2018 | HR | 19.12.2018 | IT | 19.12.2018 | LT | 19.12.2018 | LV | 19.12.2018 | MC | 19.12.2018 | MK | 19.12.2018 | MT | 19.12.2018 | NL | 19.12.2018 | PL | 19.12.2018 | RO | 19.12.2018 | RS | 19.12.2018 | SE | 19.12.2018 | SI | 19.12.2018 | SK | 19.12.2018 | SM | 19.12.2018 | TR | 19.12.2018 | BG | 19.03.2019 | NO | 19.03.2019 | GR | 20.03.2019 | IS | 19.04.2019 | PT | 19.04.2019 | IE | 05.06.2019 | LU | 05.06.2019 | BE | 30.06.2019 | CH | 30.06.2019 | LI | 30.06.2019 | [2022/31] |
Former [2021/34] | HU | 05.06.2015 | |
AL | 19.12.2018 | ||
AT | 19.12.2018 | ||
CY | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
MT | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
TR | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
IE | 05.06.2019 | ||
LU | 05.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2021/32] | HU | 05.06.2015 | |
AL | 19.12.2018 | ||
AT | 19.12.2018 | ||
CY | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
TR | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
IE | 05.06.2019 | ||
LU | 05.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2021/26] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CY | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
TR | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
IE | 05.06.2019 | ||
LU | 05.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/25] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
TR | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
IE | 05.06.2019 | ||
LU | 05.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
Former [2020/21] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
TR | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
IE | 05.06.2019 | ||
Former [2020/17] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
TR | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
Former [2020/13] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SI | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
Former [2020/09] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
MC | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
Former [2019/48] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
DK | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
Former [2019/46] | AL | 19.12.2018 | |
AT | 19.12.2018 | ||
CZ | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
Former [2019/39] | AL | 19.12.2018 | |
CZ | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SK | 19.12.2018 | ||
SM | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
IS | 19.04.2019 | ||
PT | 19.04.2019 | ||
Former [2019/37] | AL | 19.12.2018 | |
CZ | 19.12.2018 | ||
EE | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RO | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
SM | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
PT | 19.04.2019 | ||
Former [2019/35] | AL | 19.12.2018 | |
CZ | 19.12.2018 | ||
ES | 19.12.2018 | ||
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
PL | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
PT | 19.04.2019 | ||
Former [2019/34] | AL | 19.12.2018 | |
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
IT | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
PT | 19.04.2019 | ||
Former [2019/33] | AL | 19.12.2018 | |
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
PT | 19.04.2019 | ||
Former [2019/30] | AL | 19.12.2018 | |
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
NL | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
Former [2019/26] | AL | 19.12.2018 | |
FI | 19.12.2018 | ||
HR | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
Former [2019/25] | FI | 19.12.2018 | |
HR | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
RS | 19.12.2018 | ||
SE | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
GR | 20.03.2019 | ||
Former [2019/23] | FI | 19.12.2018 | |
HR | 19.12.2018 | ||
LT | 19.12.2018 | ||
LV | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
Former [2019/22] | FI | 19.12.2018 | |
LT | 19.12.2018 | ||
BG | 19.03.2019 | ||
NO | 19.03.2019 | ||
Former [2019/21] | FI | 19.12.2018 | |
LT | 19.12.2018 | ||
NO | 19.03.2019 | ||
Former [2019/20] | LT | 19.12.2018 | |
NO | 19.03.2019 | Documents cited: | Search | [I]EP1936000 (NIPPON STEEL CORP [JP]) [I] 1-6 * claim 1; table 2 *; | [I]EP2415896 (JFE STEEL CORP [JP]) [I] 1-6 * paragraphs [0045] - [0047] - [0 77]; table 2 *; | [I]DE102012101018 (THYSSENKRUPP NIROSTA GMBH [DE], et al) [I] 1-6 * paragraph [0033] *; | [A]EP2653572 (JFE STEEL CORP [JP]) [A] 1-6* paragraphs [0015] - [0018] - [0 34] , [0 45] , [0 76] , [0 83]; figure 1 *; | [A]WO2013187039 (JFE STEEL CORP [JP]) [A] 1-6 * figure - *; | [A]WO2014087452 (JFE STEEL CORP [JP]) [A] 1-6 * figure - *; | [AP]EP2862946 (JFE STEEL CORP [JP]) [AP] 1-6 * figures 1, 2; example - *; | [E]EP2927342 (JFE STEEL CORP [JP]) [E] 1-6 * paragraphs [0015] , [0 18]; figure - * | International search | [YA]JPS59200719 (SUMITOMO METAL IND, et al) [Y] 1-4, 6 * , claim 1; page 1, lower right column to page 2, lower left column; page 3, upper left column to lower right column; fig. 1 (Family: none) * [A] 5; | [YA]WO2007043273 (NIPPON STEEL CORP [JP], et al) [Y] 1-4, 6 * , pages 1, 3, 6; examples; table 2; claims 1, 5 to 6 & JP 4791482 B2 & US 2009/0123651 A1 & EP 1936000 A1 & CA 2625790 A1 & CN 101287854 A & KR 10-2008-0046241 A & RU 2387734 C & KR 10-1011897 B1 * [A] 5; | [YA]JP2008275185 (TAIYO NIPPON SANSO CORP) [Y] 1-4, 6 * , claim 1; paragraphs [0001] to [0005], [0009] to [0010]; fig. 1 (Family: none) * [A] 5; | [Y]JP2010202959 (JFE STEEL CORP) [Y] 6* , claim 2; paragraphs [0001], [0010] (Family: none) *; | [Y]JP2013245361 (JFE STEEL CORP) [Y] 3, 6 * , paragraph [0015] & US 2015/0140217 A1 & WO 2013/175758 A1 & TW 201408783 A & CN 104321447 A & KR 10-2015-0003835 A *; | [YA]WO2013187039 (JFE STEEL CORP [JP]) [Y] 1-4, 6 * , paragraphs [0001], [0010] to [0011], [0031] to [0032], [0039]; examples; tables 2 to 3; fig. 1 to 2 & JP 5655955 B2 & US 2015/0167113 A1 & EP 2862946 A & CN 104379776 A & KR 10-2015-0013807 A * [A] 5; | [YA]JP2014001898 (KITZ MICROFILTER CORP) [Y] 1-4, 6 * , claims 1 to 2; paragraphs [0001] to [0034], [0047]; fig. 1 to 2, 6 (Family: none) * [A] 5 |