EP3222591 - METHOD FOR THE CONTINUOUS THERMAL HYDROLYSIS OF ORGANIC MATTER, AND A SYSTEM SUITABLE FOR CARRYING OUT SAID METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 28.06.2019 | ||
Former | Grant of patent is intended Status updated on 20.02.2019 | ||
Former | Examination is in progress Status updated on 10.08.2018 | ||
Former | Request for examination was made Status updated on 25.08.2017 | ||
Former | The international publication has been made Status updated on 24.05.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states AQUATEC, PROYECTOS PARA EL SECTOR DEL AGUA, S.A.U. Calle Santa Leonor, 39 28037 Madrid / ES | [N/P] |
Former [2017/39] | For all designated states AQUATEC, PROYECTOS PARA EL SECTOR DEL AGUA, S.A.U. calle Santa Leonor, 39 28037 Madrid / ES | Inventor(s) | 01 /
ARAUZO PEREZ, Ivan c. Dr. Vicente Altava 28 4t E-12004 CastellóN / ES | 02 /
PERMUY VILA, Juan c. Antonio Prades Safont 98 E-12004 Castelló / ES | [2017/39] | Representative(s) | Sugrañes, S.L.P. Calle Provenza 304 08008 Barcelona / ES | [N/P] |
Former [2017/39] | Sugrañes Patentes y Marcas Calle Provenza 304 08008 Barcelona / ES | Application number, filing date | 15820194.7 | 19.11.2015 | [2017/39] | WO2015ES70825 | Priority number, date | ES20140031703 | 19.11.2014 Original published format: ES 201431703 | [2017/39] | Filing language | ES | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016079361 | Date: | 26.05.2016 | Language: | ES | [2016/21] | Type: | A1 Application with search report | No.: | EP3222591 | Date: | 27.09.2017 | Language: | EN | [2017/39] | Type: | B1 Patent specification | No.: | EP3222591 | Date: | 31.07.2019 | Language: | EN | [2019/31] | Search report(s) | International search report - published on: | EP | 26.05.2016 | Classification | IPC: | C02F11/18, C02F1/02, C12M1/33 | [2019/09] | CPC: |
C02F1/025 (EP,ES,US);
C02F11/13 (EP,CN,ES,US);
C02F11/18 (EP,CN,ES,US);
C12M45/02 (EP,CN,US);
C12M45/20 (EP,CN,US)
|
Former IPC [2017/39] | C02F11/18, C12M1/33 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | METHODE FÜR DIE KONTINUIERLICHE THERMISCHE HYDROLYSE ORGANISCHER SUBSTANZ UND SYSTEM ZUR AUSFÜHRUNG DER METHODE | [2019/09] | English: | METHOD FOR THE CONTINUOUS THERMAL HYDROLYSIS OF ORGANIC MATTER, AND A SYSTEM SUITABLE FOR CARRYING OUT SAID METHOD | [2017/39] | French: | PROCÉDÉ POUR L'HYDROLYSE THERMIQUE EN CONTINU DE MATIÈRE ORGANIQUE ET INSTALLATION PERMETTANT LA MISE EN OEUVRE DE CE PROCÉDÉ | [2017/39] |
Former [2017/39] | VERFAHREN ZUR KONTINUIERLICHEN THERMISCHEN HYDROLYSE VON ORGANISCHEN STOFFEN UND GEEIGNETES SYSTEM ZUR DURCHFÜHRUNG DIESES VERFAHRENS | Entry into regional phase | 24.05.2017 | Translation filed | 24.05.2017 | National basic fee paid | 24.05.2017 | Designation fee(s) paid | 24.05.2017 | Examination fee paid | Examination procedure | 11.07.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 24.05.2017 | Examination requested [2017/39] | 24.05.2017 | Date on which the examining division has become responsible | 21.12.2017 | Amendment by applicant (claims and/or description) | 10.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 19.12.2018 | Reply to a communication from the examining division | 21.02.2019 | Communication of intention to grant the patent | 19.06.2019 | Fee for grant paid | 19.06.2019 | Fee for publishing/printing paid | 19.06.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 28.11.2017 | Renewal fee patent year 03 | 28.11.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.11.2015 | AL | 31.07.2019 | AT | 31.07.2019 | CY | 31.07.2019 | CZ | 31.07.2019 | DK | 31.07.2019 | EE | 31.07.2019 | ES | 31.07.2019 | FI | 31.07.2019 | HR | 31.07.2019 | LT | 31.07.2019 | LV | 31.07.2019 | MC | 31.07.2019 | MK | 31.07.2019 | MT | 31.07.2019 | NL | 31.07.2019 | PL | 31.07.2019 | RO | 31.07.2019 | RS | 31.07.2019 | SE | 31.07.2019 | SI | 31.07.2019 | SK | 31.07.2019 | SM | 31.07.2019 | TR | 31.07.2019 | IS | 30.10.2019 | BG | 31.10.2019 | NO | 31.10.2019 | GR | 01.11.2019 | IE | 19.11.2019 | LU | 19.11.2019 | BE | 30.11.2019 | CH | 30.11.2019 | LI | 30.11.2019 | PT | 02.12.2019 | [2022/31] |
Former [2021/34] | HU | 19.11.2015 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
MT | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2021/32] | HU | 19.11.2015 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2021/26] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/51] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/46] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/37] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/36] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/35] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/34] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/27] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/22] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/17] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/15] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/12] | AT | 31.07.2019 | |
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/11] | AT | 31.07.2019 | |
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/10] | AT | 31.07.2019 | |
FI | 31.07.2019 | ||
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
PT | 02.12.2019 | ||
Former [2020/09] | FI | 31.07.2019 | |
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
NO | 31.10.2019 | ||
Former [2020/08] | LT | 31.07.2019 | |
NO | 31.10.2019 | Cited in | International search | [A]WO9609882 (CAMBI AS [NO], et al) [A] 1-14* the whole document *; | [X]US2004192980 (APPEL BRIAN S [US], et al) [X] 1,14 * paragraph [0073]; figure 2 *; | [XI]WO2011006854 (CAMBI AS [NO], et al) [X] 1,2,4-6,9-14 * figure 1; claim - * * page 9, lines 23-24, 28-34 * * page 4, line 24 * * page 10, line 23 - line 28 * [I] 3,7,8 |