EP3245838 - COMMUNICATION APPARATUS, CORE NETWORK NODE, SYSTEM AND METHODS FOR REROUTING NAS-MESSAGES [Right-click to bookmark this link] | |||
Former [2017/47] | COMMUNICATION APPARATUS, CORE NETWORK NODE, SYSTEM, COMPUTER PROGRAM AND METHODS FOR REROUTING NAS-MESSAGES | ||
[2020/43] | Status | No opposition filed within time limit Status updated on 14.01.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 05.02.2021 | ||
Former | Grant of patent is intended Status updated on 04.10.2020 | ||
Former | Examination is in progress Status updated on 01.06.2019 | ||
Former | Request for examination was made Status updated on 20.10.2017 | ||
Former | The international publication has been made Status updated on 11.02.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states NEC CORPORATION 7-1, Shiba 5-chome Minato-ku, Tokyo 108-8001 / JP | [2021/10] |
Former [2017/47] | For all designated states NEC CORPORATION 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | Inventor(s) | 01 /
IANEV, Iskren c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | 02 /
TAMURA, Toshiyuki c/o NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | 03 /
VELEV, Genadi c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | 04 /
KUNZ, Andreas c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | 05 /
MAEDER, Andreas c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | [2020/45] |
Former [2018/06] | 01 /
IANEV, Iskren c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | ||
02 /
TAMURA, Toshiyuki c/o NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | |||
03 /
VELEV, Genadi c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | |||
04 /
KUNZ, Andreas c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | |||
05 /
MAEDER, Andreas c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | |||
Former [2017/47] | 01 /
IANEV, Iskren c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | ||
02 /
TAMURA, Toshiyuki c/o NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-0001 / JP | |||
03 /
VELEV, Genadi c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | |||
04 /
KUNZ, Andreas c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | |||
05 /
MAEDER, Andreas c/o NEC EUROPE LTD Kurfürsten-Anlage 36 69115 Heidelberg / DE | Representative(s) | Smith, Jeremy, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2021/10] |
Former [2017/47] | Smith, Jeremy, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 15823332.0 | 21.12.2015 | [2017/47] | WO2015EP80827 | Priority number, date | EP20150150900 | 13.01.2015 Original published format: EP 15150900 | [2017/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016113083 | Date: | 21.07.2016 | Language: | EN | [2016/29] | Type: | A1 Application with search report | No.: | EP3245838 | Date: | 22.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.07.2016 takes the place of the publication of the European patent application. | [2017/47] | Type: | B1 Patent specification | No.: | EP3245838 | Date: | 10.03.2021 | Language: | EN | [2021/10] | Search report(s) | International search report - published on: | EP | 21.07.2016 | Classification | IPC: | H04W8/06, H04W76/18, // H04W92/04, H04W76/12 | [2020/43] | CPC: |
H04W76/18 (EP,RU,US);
H04W8/065 (EP,CN,RU,US);
H04W36/22 (RU,US);
H04W40/04 (RU,US);
H04W48/20 (RU,US);
H04W76/12 (EP,CN,US);
H04W92/045 (EP,CN,US)
(-)
|
Former IPC [2017/47] | H04W76/02, H04W24/04, H04W88/14, H04W92/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOMMUNIKATIONSGERÄT, KERNNETZWERKKNOTEN, SYSTEM UND VERFAHREN ZUR UMLEITUNG VON NAS-NACHRICHTEN | [2020/43] | English: | COMMUNICATION APPARATUS, CORE NETWORK NODE, SYSTEM AND METHODS FOR REROUTING NAS-MESSAGES | [2020/43] | French: | DISPOSITIF DE COMMUNICATION, NOEUD DE RESEAU CENTRAL, SYSTEME ET PROCEDES POUR LE REROUTAGE DES MESSAGES NAS | [2020/45] |
Former [2017/47] | KOMMUNIKATIONSVORRICHTUNG, KERNNETZWERKKNOTEN, SYSTEM, COMPUTERPROGRAMM UND VERFAHREN ZUR UMLEITUNG VON NAS-NACHRICHTEN | ||
Former [2017/47] | COMMUNICATION APPARATUS, CORE NETWORK NODE, SYSTEM, COMPUTER PROGRAM AND METHODS FOR REROUTING NAS-MESSAGES | ||
Former [2017/47] | APPAREIL DE COMMUNICATION, NOEUD DE RÉSEAU CENTRAL, SYSTÈME, PROGRAMME INFORMATIQUE ET PROCÉDÉS POUR LE RÉACHEMINEMENT DE MESSAGES NAS | Entry into regional phase | 10.08.2017 | National basic fee paid | 10.08.2017 | Designation fee(s) paid | 10.08.2017 | Examination fee paid | Examination procedure | 10.08.2017 | Amendment by applicant (claims and/or description) | 10.08.2017 | Examination requested [2017/47] | 10.08.2017 | Date on which the examining division has become responsible | 05.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.10.2019 | Reply to a communication from the examining division | 15.09.2020 | Cancellation of oral proceeding that was planned for 16.09.2020 | 16.09.2020 | Date of oral proceedings (cancelled) | 05.10.2020 | Communication of intention to grant the patent | 02.02.2021 | Fee for grant paid | 02.02.2021 | Fee for publishing/printing paid | 02.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 13.12.2021 | No opposition filed within time limit [2022/07] | Fees paid | Renewal fee | 29.12.2017 | Renewal fee patent year 03 | 12.12.2018 | Renewal fee patent year 04 | 13.12.2019 | Renewal fee patent year 05 | 14.12.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2015 | AL | 10.03.2021 | AT | 10.03.2021 | CY | 10.03.2021 | CZ | 10.03.2021 | DK | 10.03.2021 | EE | 10.03.2021 | ES | 10.03.2021 | FI | 10.03.2021 | HR | 10.03.2021 | IT | 10.03.2021 | LT | 10.03.2021 | LV | 10.03.2021 | MC | 10.03.2021 | MK | 10.03.2021 | NL | 10.03.2021 | PL | 10.03.2021 | RO | 10.03.2021 | RS | 10.03.2021 | SE | 10.03.2021 | SI | 10.03.2021 | SK | 10.03.2021 | SM | 10.03.2021 | BG | 10.06.2021 | NO | 10.06.2021 | GR | 11.06.2021 | IS | 10.07.2021 | PT | 12.07.2021 | [2024/22] |
Former [2023/30] | HU | 21.12.2015 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2023/29] | HU | 21.12.2015 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/33] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/23] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/13] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/10] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/08] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/07] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/52] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/51] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/50] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2021/48] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/46] | AT | 10.03.2021 | |
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/43] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/38] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/37] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/36] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/35] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
NO | 10.06.2021 | ||
Former [2021/33] | FI | 10.03.2021 | |
LT | 10.03.2021 | ||
NO | 10.06.2021 | Cited in | International search | [A]WO2012108717 (LG ELECTRONICS INC [KR], et al) [A] 1-20 * paragraphs [0041] , [0 84] - [0087] *; | [A]US2013044709 (ADJAKPLE PASCAL M [US], et al) [A] 1-20 * paragraphs [0263] - [0266] * | [AD] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture Enhancements for Dedicated Core Networks; Stage 2 (Release 13)", (20141219), 3GPP DRAFT; 23707-D00, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/Latest_SA2_Specs/Rel-13/, (20141219), XP050923742 [AD] 1-20 * the whole document * | [L] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Enhancements of Dedicated Core Networks selection mechanism; (Release 14)", 3GPP STANDARD; 3GPP TR 23.711, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20151215), vol. SA WG2, no. V0.2.0, pages 1 - 20, XP051046490 [L] 1-20 * the whole document * | Examination | US2010080186 | US2004162077 | WO2016146219 |