EP3177673 - ALLYL ETHER SULFATE POLYMERIZABLE SURFACTANTS AND METHODS FOR USE [Right-click to bookmark this link] | |||
Former [2017/24] | ALLYL ETHER SULFATE POLYMERIZABLE SURFANCTANTS AND METHODS FOR USE | ||
[2021/26] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 19.01.2021 | ||
Former | Examination is in progress Status updated on 16.10.2019 | ||
Former | Request for examination was made Status updated on 12.05.2017 | ||
Former | The international publication has been made Status updated on 27.01.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Rhodia Operations 52, Rue de la Haie Coq 93300 Aubervilliers / FR | [N/P] |
Former [2020/28] | For all designated states Rhodia Operations 52, rue de la Haie Coq 93300 Aubervilliers / FR | ||
Former [2017/24] | For all designated states Rhodia Operations 25 rue de Clichy 75009 Paris / FR | Inventor(s) | 01 /
ANDERSON, Eugene J. 138 Champlain Road Marlton, NJ 08053 / US | 02 /
MARTINEZ-CASTRO, Nemesio 152 rue Damremont Paris 75018 / FR | 03 /
ZHANG, Zhihua Blk 611 Clementi West Street 1 09-242 Singapore 120611 / SG | 04 /
PAKENHAM, Derek 3029 E. State Street Hamilton, NJ 08619 / US | [2017/24] | Representative(s) | Lederer & Keller Patentanwälte Partnerschaft mbB Unsöldstraße 2 80538 München / DE | [2021/26] |
Former [2017/24] | Teipel, Stephan, et al Lederer & Keller Patentanwälte Partnerschaft mbB Unsöldstrasse 2 80538 München / DE | Application number, filing date | 15830502.9 | 07.08.2015 | [2017/24] | WO2015US44189 | Priority number, date | US201462034903P | 08.08.2014 Original published format: US 201462034903 P | [2017/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016022909 | Date: | 11.02.2016 | Language: | EN | [2016/06] | Type: | A1 Application with search report | No.: | EP3177673 | Date: | 14.06.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.02.2016 takes the place of the publication of the European patent application. | [2017/24] | Type: | B1 Patent specification | No.: | EP3177673 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | International search report - published on: | KR | 11.02.2016 | (Supplementary) European search report - dispatched on: | EP | 02.03.2018 | Classification | IPC: | C08J3/02, C08F2/24, C08L71/02 | [2018/13] | CPC: |
C08F2/26 (EP,US);
C08G65/3344 (EP);
C08L71/02 (EP);
C08F216/1475 (EP,US);
C08K5/42 (US)
|
Former IPC [2017/24] | C08J3/02, C08F2/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | POLYMERISIERBARE ALLYLETHERSULFATTENSIDE UND VERFAHREN ZUR VERWENDUNG | [2017/24] | English: | ALLYL ETHER SULFATE POLYMERIZABLE SURFACTANTS AND METHODS FOR USE | [2021/26] | French: | SULFATES D'ÉTHER D'ALLYLE UTILISÉS COMME TENSIOACTIFS POLYMÉRISABLES, ET PROCÉDÉS D'UTILISATION | [2017/24] |
Former [2017/24] | ALLYL ETHER SULFATE POLYMERIZABLE SURFANCTANTS AND METHODS FOR USE | Entry into regional phase | 08.03.2017 | National basic fee paid | 08.03.2017 | Search fee paid | 08.03.2017 | Designation fee(s) paid | 08.03.2017 | Examination fee paid | Examination procedure | 27.01.2017 | Date on which the examining division has become responsible | 08.03.2017 | Examination requested [2017/24] | 27.09.2018 | Amendment by applicant (claims and/or description) | 21.10.2019 | Despatch of a communication from the examining division (Time limit: M06) | 04.05.2020 | Reply to a communication from the examining division | 18.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 22.09.2020 | Reply to a communication from the examining division | 13.11.2020 | Despatch of a communication from the examining division (Time limit: M01) | 15.12.2020 | Reply to a communication from the examining division | 20.01.2021 | Communication of intention to grant the patent | 21.05.2021 | Fee for grant paid | 21.05.2021 | Fee for publishing/printing paid | 21.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 14.08.2017 | Renewal fee patent year 03 | 10.08.2018 | Renewal fee patent year 04 | 15.08.2019 | Renewal fee patent year 05 | 13.08.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.08.2015 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | IE | 07.08.2021 | LU | 07.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | [2024/29] |
Former [2024/22] | HU | 07.08.2015 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
IE | 07.08.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/30] | HU | 07.08.2015 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
IE | 07.08.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/29] | HU | 07.08.2015 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
IE | 07.08.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/19] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
IE | 07.08.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
IE | 07.08.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/35] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
IE | 07.08.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/34] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
LU | 07.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
LU | 07.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
LU | 07.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/24] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
LU | 07.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/18] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | AT | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [XI]CN101235119 ; | [A]CN101654891 ; | [A]EP0825167 (ASAHI DENKA KOGYO KK [JP]) [A] 1-10 * comparative compound 2; page 12 * * page 11; examples 4,5 ** page 12; example 14 *; | [X]WO2011068942 (PPG IND OHIO INC [US], et al) [X] 1,2 * claims 1,4 *; | [XI] - DATABASE WPI, 0, Derwent World Patents Index, vol. 2009, no. 04, Database accession no. 2009-A80980, XP002778194 & CN101235119 A 20080806 (JIANGSU SUNRISING GROUP CORP) [X] 1,2,4,10 * abstract * [I] 3,5,9 | [A] - DATABASE WPI, 0, Derwent World Patents Index, vol. 2010, no. 21, Database accession no. 2010-C61477, XP002778195 & CN101654891 A 20100224 (SHANDONG POLYMER BIO-CHEM CO LTD) [A] 1-10 * abstract * | International search | [A]JPH09324005 (KAO CORP) [A] 1-10 * See abstract; and claims 1-5. *; | [A]US5969032 (PHAN LIEN [CA], et al) [A] 1-10* See abstract; and claim 1. *; | [X]WO03006517 (SOLUTIA INC [US], et al) [X] 1-10 * See claims 1, 32, 33; and page 18, line 19-page 19, line 17. *; | [A]US2004157958 (VINCENT KENT [US], et al) [A] 1-10 * See abstract; and claims 1, 2, 18. *; | [A]US2007123637 (PERNECKER TIBOR [US], et al) [A] 1-10 * See abstract; and claims 1, 2, 5, 6. *; | [A]JP2013159741 (DENKI KAGAKU KOGYO KK) [A] 1-10 * See abstract; and claims 1, 9. * | by applicant | WO03006517 | WO2011068942 |