EP3195314 - METHODS AND APPARATUS FOR UNSUPERVISED WAKEUP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.10.2022 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 05.11.2021 | ||
Former | Grant of patent is intended Status updated on 30.06.2021 | ||
Former | Examination is in progress Status updated on 02.03.2019 | ||
Former | Request for examination was made Status updated on 23.06.2017 | ||
Former | The international publication has been made Status updated on 18.02.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Cerence Operating Company 15 Wayside Road Burlington, MA 01803 / US | [2021/41] |
Former [2017/30] | For all designated states Nuance Communications, Inc. One Wayside Road Burlington, MA 01803-4613 / US | Inventor(s) | 01 /
BANSAL, Dhananjay 66 Channing Road Belmont, Massachusetts 02478 / US | 02 /
NEWMAN, Michael J. 12 Mountain Avenue Somerville, Massachusetts 02143 / US | 03 /
VAN MULBREGT, Paul 30 Bow Road Wayland, Massachusetts 01778 / US | [2017/30] | Representative(s) | South, Nicholas Geoffrey, et al AA Thornton IP LLP 8th Floor, 125 Old Broad Street London EC2N 1AR / GB | [N/P] |
Former [2021/49] | South, Nicholas Geoffrey, et al A.A. Thornton & Co. Octagon Point 5 Cheapside London EC2V 6AA / GB | ||
Former [2017/30] | South, Nicholas Geoffrey, et al A.A. Thornton & Co. 10 Old Bailey London EC4M 7NG / GB | Application number, filing date | 15839496.5 | 14.07.2015 | [2017/30] | WO2015US40341 | Priority number, date | US201414483282 | 11.09.2014 Original published format: US201414483282 | US201414483285 | 11.09.2014 Original published format: US201414483285 | [2017/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016039847 | Date: | 17.03.2016 | Language: | EN | [2016/11] | Type: | A1 Application with search report | No.: | EP3195314 | Date: | 26.07.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.03.2016 takes the place of the publication of the European patent application. | [2017/30] | Type: | B1 Patent specification | No.: | EP3195314 | Date: | 08.12.2021 | Language: | EN | [2021/49] | Search report(s) | International search report - published on: | KR | 17.03.2016 | (Supplementary) European search report - dispatched on: | EP | 12.04.2018 | Classification | IPC: | G10L25/78 | [2017/30] | CPC: |
G10L15/22 (EP);
G10L15/07 (EP);
G10L2015/088 (EP);
G10L2015/223 (EP);
G10L2025/786 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG FÜR UNÜBERWACHTES AUFWECKEN | [2021/27] | English: | METHODS AND APPARATUS FOR UNSUPERVISED WAKEUP | [2017/30] | French: | PROCÉDÉS ET APPAREIL POUR ACTIVATION NON SUPERVISÉE | [2017/30] |
Former [2017/30] | VERFAHREN UND VORRICHTUNG FÜR UNÜBERWACHTES AUFWACHEN | Entry into regional phase | 17.03.2017 | National basic fee paid | 17.03.2017 | Search fee paid | 17.03.2017 | Designation fee(s) paid | 17.03.2017 | Examination fee paid | Examination procedure | 17.02.2017 | Date on which the examining division has become responsible | 17.03.2017 | Examination requested [2017/30] | 13.11.2018 | Amendment by applicant (claims and/or description) | 06.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 02.07.2019 | Reply to a communication from the examining division | 21.11.2019 | Despatch of a communication from the examining division (Time limit: M06) | 19.03.2020 | Reply to a communication from the examining division | 01.07.2021 | Communication of intention to grant the patent | 27.10.2021 | Fee for grant paid | 27.10.2021 | Fee for publishing/printing paid | 27.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 09.09.2022 | No opposition filed within time limit [2022/46] | Fees paid | Renewal fee | 28.07.2017 | Renewal fee patent year 03 | 30.07.2018 | Renewal fee patent year 04 | 26.07.2019 | Renewal fee patent year 05 | 14.07.2020 | Renewal fee patent year 06 | 15.07.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.07.2015 | AL | 08.12.2021 | AT | 08.12.2021 | CY | 08.12.2021 | CZ | 08.12.2021 | DK | 08.12.2021 | EE | 08.12.2021 | ES | 08.12.2021 | FI | 08.12.2021 | HR | 08.12.2021 | IT | 08.12.2021 | LT | 08.12.2021 | LV | 08.12.2021 | MC | 08.12.2021 | MK | 08.12.2021 | NL | 08.12.2021 | PL | 08.12.2021 | RO | 08.12.2021 | RS | 08.12.2021 | SE | 08.12.2021 | SI | 08.12.2021 | SK | 08.12.2021 | SM | 08.12.2021 | BG | 08.03.2022 | NO | 08.03.2022 | GR | 09.03.2022 | IS | 08.04.2022 | PT | 08.04.2022 | IE | 14.07.2022 | LU | 14.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | [2024/22] |
Former [2024/20] | HU | 14.07.2015 | |
AL | 08.12.2021 | ||
AT | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/18] | HU | 14.07.2015 | |
AL | 08.12.2021 | ||
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/33] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/01] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/49] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/46] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/42] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/36] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/35] | CZ | 08.12.2021 | |
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/34] | EE | 08.12.2021 | |
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/33] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/30] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/25] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/24] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/22] | FI | 08.12.2021 | |
LT | 08.12.2021 | ||
RS | 08.12.2021 | ||
BG | 08.03.2022 | ||
Former [2022/21] | RS | 08.12.2021 | |
BG | 08.03.2022 | ||
Former [2022/19] | BG | 08.03.2022 | Documents cited: | Search | [IA]US2005071161 (SHEN JIA-LIN [TW]) [I] 1,2,5-9,11-15 * figures 2,3 * * paragraph [0016] * [A] 3,4,10; | [A]US5737724 (ATAL BISHNU SAROOP [US], et al) [A] 1-15 * figure 3 *; | [A]US5794194 (TAKEBAYASHI YOICHI [JP], et al) [A] 1-15 * figure 10 * * column 11, line 1 - line 17 * | International search | [A]US2014249817 (HART GREGORY MICHAEL [US], et al) [A] 1-40 * See paragraphs [0063]-[0070]; claims 1 and 13; and figures 2-3. *; | [A]US6697782 (ISO-SIPILAE JUHA [FI], et al) [A] 1-40 * See column 7, line 29 - column 8, line 29; and figure 2. *; | [A]US2003040907 (CHANG SEN-CHIA [TW], et al) [A] 1-40 * See paragraphs [0025]-[0032] and figures 1-2. *; | [A]US5465317 (EPSTEIN EDWARD A [US]) [A] 1-40 * See column 5, lines 3-49; claim 1; and figures 1-2. *; | [A]US2005080627 (HENNEBERT JEAN [BE], et al) [A] 1-40 * See paragraphs [0026]-[0027] and figure 3. * |