blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3191744

EP3191744 - ROTARY HYDRAULIC ACTUATOR SEAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  09.06.2020
FormerExamination is in progress
Status updated on  21.06.2019
FormerRequest for examination was made
Status updated on  16.06.2017
FormerThe international publication has been made
Status updated on  24.05.2017
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Trelleborg Sealing Solutions U.S., Inc.
2531 Bremer Drive
Fort Wayne, IN 46803 / US
[2017/29]
Inventor(s)01 / ALDAY, Jennifer, E.
714 Croftwood Drive
Gibsonville, NC 27249 / US
02 / CASTLEMAN, Larry, J.
24611 South County Line Rd.
Monroeville, IN 46773 / US
 [2017/29]
Representative(s)Dr. Weitzel & Partner
Patent- und Rechtsanwälte mbB
Friedenstrasse 10
89522 Heidenheim / DE
[2017/29]
Application number, filing date15840876.511.09.2015
[2017/29]
WO2015US49715
Priority number, dateUS201462049439P12.09.2014         Original published format: US 201462049439 P
[2017/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016040818
Date:17.03.2016
Language:EN
[2016/11]
Type: A1 Application with search report 
No.:EP3191744
Date:19.07.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 17.03.2016 takes the place of the publication of the European patent application.
[2017/29]
Type: B1 Patent specification 
No.:EP3191744
Date:09.09.2020
Language:EN
[2020/37]
Search report(s)International search report - published on:KR17.03.2016
(Supplementary) European search report - dispatched on:EP26.04.2018
ClassificationIPC:F16J15/16, F16J15/3208, F16J15/3232, F16J15/3284
[2018/22]
CPC:
F16J15/3232 (EP,US); F15B21/006 (US); F16J15/3208 (EP,US);
F16J15/3284 (EP,US)
Former IPC [2017/29]F16J15/16
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/29]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:DICHTUNG FÜR EINEN ROTIERENDEN HYDRAULISCHEN AKTUATOR[2017/29]
English:ROTARY HYDRAULIC ACTUATOR SEAL[2017/29]
French:JOINT D'ACTIONNEUR HYDRAULIQUE ROTATIF[2017/29]
Entry into regional phase21.06.2016National basic fee paid 
21.06.2016Search fee paid 
21.06.2016Designation fee(s) paid 
21.06.2016Examination fee paid 
Examination procedure21.06.2016Examination requested  [2017/29]
21.06.2016Date on which the examining division has become responsible
20.07.2018Amendment by applicant (claims and/or description)
26.06.2019Invitation to indicate the basis for amendments (Time limit: M01)
23.07.2019Reply to an invitation to indicate the basis for amendments
25.11.2019Despatch of a communication from the examining division (Time limit: M04)
24.01.2020Reply to a communication from the examining division
10.06.2020Communication of intention to grant the patent
28.07.2020Fee for grant paid
28.07.2020Fee for publishing/printing paid
28.07.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20157818.4  / EP3730820
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Fees paidRenewal fee
12.09.2017Renewal fee patent year 03
25.09.2018Renewal fee patent year 04
13.09.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.09.2015
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE11.09.2020
LU11.09.2020
NL23.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
[2023/29]
Former [2022/32]HU11.09.2015
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE11.09.2020
LU11.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2022/27]HU11.09.2015
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE11.09.2020
LU11.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/48]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
IE11.09.2020
LU11.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
IE11.09.2020
LU11.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
LU11.09.2020
BE30.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/31]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
LU11.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
LU11.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/27]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
LU11.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/24]AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/23]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[XI]US4289321  (CATHER JR DOUGLAS A) [X] 1,4,6,7,9,14,15 * column 2, line 26 - line 34; figure 1 * [I] 8,10;
 [XI]US4650196  (BUCHER HANS [DE], et al) [X] 1,4,9-11 * column 4, line 8 - line 46; figures 1-4 * [I] 2,3;
 [XI]US5380016  (REINSMA HAROLD L [US], et al) [X] 1,9,11,14,15 * column 3, line 16 - column 4, line 68; figures 1, 2 * [I] 2,3,12,13;
 [XAI]US6536542  (FANG ZHIGANG [US], et al) [X] 1,11-15 * column 8, line 16 - column 16, line 55; figures 1-9 * [A] 16-20[I] 2,3,9,10;
 [XI]JP2012092976  (MITSUBISHI CABLE IND LTD) [X] 1,11-15 * abstract * [I] 2,3,5,8
International search[Y]US3869963  (SCHINDEL ARNOLD) [Y] 16-20 * See abstract, column 1, line 58 - column 2, line 10, and figure 1. *;
 [A]US4501431  (PEISKER GLENN [US], et al) [A] 1-20* See abstract, column 4, Line 56 - column 5, line 9, and figure 1. *;
 [A]US6305483  (PORTWOOD GARY R [US]) [A] 1-20 * see abstract , column 11, line 57 - column 12, line 26, and figures 12-14. *;
 [XY]US6536542  (FANG ZHIGANG [US], et al) [X] 1-3, 11-15 * See abstract,. column 6, line 5 - column 9, line 25, column 14. line 54 - column 15, line 26, and figures 2-3, 6. * [Y] 4-10, 16-20;
 [Y]CN202125616U  (UNIV NORTHEAST PETROLEUM) [Y] 4-10, 18-20 * See abstract, paragraph [0013], and figures 1-2. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.