blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3200556

EP3200556 - USER TERMINAL, SERVICE CONTROL DEVICE, AND BASE STATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.07.2021
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  31.07.2020
FormerGrant of patent is intended
Status updated on  26.03.2020
FormerRequest for examination was made
Status updated on  04.07.2017
FormerThe international publication has been made
Status updated on  21.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Kyocera Corporation
6 Takeda Tobadono-cho Fushimi-ku Kyoto-shi
Kyoto 612-8501 / JP
[2017/31]
Inventor(s)01 / FUJISHIRO, Masato
c/o KYOCERA Corporation
6 Takeda Tobadono-cho
Fushimi-Ku
Kyoto-shi Kyoto 612-8501 / JP
02 / CHANG, Henry
c/o KYOCERA International Inc.
8611 Balboa Avenue
San Diego, California 92123 / US
 [2017/31]
Representative(s)SSM Sandmair
Patentanwälte Rechtsanwalt
Partnerschaft mbB
Joseph-Wild-Straße 20
81829 München / DE
[2020/36]
Former [2017/31]Schwabe - Sandmair - Marx
Patentanwälte Rechtsanwalt
Partnerschaft mbB
Joseph-Wild-Straße 20
81829 München / DE
Application number, filing date15844155.015.09.2015
[2017/31]
WO2015JP76179
Priority number, dateUS201462055410P25.09.2014         Original published format: US 201462055410 P
[2017/31]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016047507
Date:31.03.2016
Language:JA
[2016/13]
Type: A1 Application with search report 
No.:EP3200556
Date:02.08.2017
Language:EN
[2017/31]
Type: B1 Patent specification 
No.:EP3200556
Date:02.09.2020
Language:EN
[2020/36]
Search report(s)International search report - published on:JP31.03.2016
(Supplementary) European search report - dispatched on:EP25.04.2018
ClassificationIPC:H04W92/18, H04W72/02, H04W72/04, H04W8/00
[2018/21]
CPC:
H04W76/14 (EP,US); H04W72/0453 (US); H04W4/023 (EP,US);
H04W72/02 (EP,US); H04W72/04 (EP,US); H04W92/18 (US);
H04W48/08 (EP,US); H04W76/27 (EP) (-)
Former IPC [2017/31]H04W92/18, H04W72/02, H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/31]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:BENUTZERENDGERÄT, DIENSTSTEUERUNGSVERFAHREN UND BASISSTATION[2017/31]
English:USER TERMINAL, SERVICE CONTROL DEVICE, AND BASE STATION[2017/31]
French:TERMINAL UTILISATEUR, DISPOSITIF DE COMMANDE DE SERVICE ET STATION DE BASE[2017/31]
Entry into regional phase21.03.2017Translation filed 
21.03.2017National basic fee paid 
21.03.2017Search fee paid 
21.03.2017Designation fee(s) paid 
21.03.2017Examination fee paid 
Examination procedure21.03.2017Examination requested  [2017/31]
21.03.2017Date on which the examining division has become responsible
22.10.2018Amendment by applicant (claims and/or description)
27.03.2020Communication of intention to grant the patent
24.07.2020Fee for grant paid
24.07.2020Fee for publishing/printing paid
24.07.2020Receipt of the translation of the claim(s)
Opposition(s)03.06.2021No opposition filed within time limit [2021/32]
Fees paidRenewal fee
26.09.2017Renewal fee patent year 03
25.09.2018Renewal fee patent year 04
24.09.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.09.2015
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
IE15.09.2020
LU15.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
[2022/32]
Former [2022/27]HU15.09.2015
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
IE15.09.2020
LU15.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/48]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
IE15.09.2020
LU15.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/37]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
IE15.09.2020
LU15.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/36]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
LU15.09.2020
BE30.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/31]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
LU15.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/28]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
LU15.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/27]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
LU15.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/25]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/23]AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/22]CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/21]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/10]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/09]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/08]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
Former [2021/07]FI02.09.2020
LT02.09.2020
NO02.12.2020
Documents cited:Search[XY]WO2013183730  (KYOCERA CORP [JP]) [X] 1-4,6-10 * abstract * [Y] 5;
 [Y]WO2014084028  (KYOCERA CORP [JP]) [Y] 5 * abstract *;
 [XP]EP2861009  (KYOCERA CORP [JP]) [XP] 1-4,6-11 * paragraph [0080] - paragraph [0082] * * paragraph [0100] - paragraph [0107] *;
 EP2928263  [ ] (KYOCERA CORP [JP]) [ ] * paragraph [0012] - paragraph [0019] ** paragraph [0082] - paragraph [0087] *;
 [I]  - ZTE CORPORATION, "Resource pools for D2D communication", vol. RAN WG2, no. Valencia; 20140331 - 20140404, (20140322), 3GPP DRAFT; R2-141483 - RESOURCE POOLS FOR D2D COMMUNICATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20140322), XP050792653 [I] 1-4,6-10 * paragraph [02.2] - paragraph [02.3] *
International search[XP]WO2015046155  (KYOCERA CORP [JP]) [XP] 1-2, 9* , paragraphs [0072] to [0077], [0092]; fig. 10 (Family: none) *;
 [A]  - QUALCOMM INCORPORATED, "Signaling Details for ProSe Direct Discovery", 3GPP TSG-RAN WG2#86 R2-142540, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_86/Docs/R2-142540.zip, (20151116), XP050790383 [A] 1-10
 [A]  - SA WG1, "Reply LS on availability of ProSe Direct Communication in limited service state", 3GPP TSG-SA WG2#105, (20140923), pages 2 - 142965, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_105_Sapporo/Docs/S2-142965.zip, (20151116), XP050872471 [A] 1-10
 [A]  - ZTE CORPORATION, "Resource pools for D2D communication", 3GPP TSG-RAN WG2#85bis R2- 141483, (20140322), URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_85bis/Docs/R2-141483.zip, (20151116), XP050792653 [A] 1-10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.