EP3203806 - INFORMATION NOTIFICATION METHOD, MOBILE COMMUNICATION SYSTEM, AND BASE STATION [Right-click to bookmark this link] | |||
Former [2017/32] | INFORMATION REPORTING METHOD, MOBILE COMMUNICATION SYSTEM, AND BASE STATION | ||
[2019/36] | Status | No opposition filed within time limit Status updated on 23.10.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.11.2019 | ||
Former | Grant of patent is intended Status updated on 06.08.2019 | ||
Former | Examination is in progress Status updated on 05.10.2018 | ||
Former | Request for examination was made Status updated on 07.07.2017 | ||
Former | The international publication has been made Status updated on 16.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states NTT DOCOMO, INC. 11-1, Nagata-cho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2017/32] | Inventor(s) | 01 /
UCHINO, Tooru c/o Intellectual Property Department NTT DOCOMO INC. SANNO PARK TOWER 11-1 Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | 02 /
HAPSARI, Wuri Andarmawanti c/o Intellectual Property Department NTT DOCOMO INC. SANNO PARK TOWER 11-1 Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2017/32] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2017/32] | Application number, filing date | 15846857.9 | 01.10.2015 | [2017/32] | WO2015JP77969 | Priority number, date | JP20140205020 | 03.10.2014 Original published format: JP 2014205020 | [2017/32] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016052708 | Date: | 07.04.2016 | Language: | JA | [2016/14] | Type: | A1 Application with search report | No.: | EP3203806 | Date: | 09.08.2017 | Language: | EN | [2017/32] | Type: | B1 Patent specification | No.: | EP3203806 | Date: | 18.12.2019 | Language: | EN | [2019/51] | Search report(s) | International search report - published on: | JP | 07.04.2016 | (Supplementary) European search report - dispatched on: | EP | 22.09.2017 | Classification | IPC: | H04L12/24, // H04W92/20 | [2017/43] | CPC: |
H04L41/0813 (EP,US);
H04W72/27 (EP,KR,US);
H04W72/04 (US);
H04W92/20 (EP,KR,US)
|
Former IPC [2017/32] | H04W92/20, H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | INFORMATIONSBENACHRICHTIGUNGSVERFAHREN, MOBILKOMMUNIKATIONSSYSTEM UND BASISSTATION | [2019/36] | English: | INFORMATION NOTIFICATION METHOD, MOBILE COMMUNICATION SYSTEM, AND BASE STATION | [2019/36] | French: | PROCÉDÉ DE NOTIFICATION D'INFORMATIONS, SYSTÈME DE COMMUNICATION MOBILE ET STATION DE BASE | [2019/36] |
Former [2017/32] | INFORMATIONSMELDEVERFAHREN, MOBILKOMMUNIKATIONSSYSTEM UND BASISSTATION | ||
Former [2017/32] | INFORMATION REPORTING METHOD, MOBILE COMMUNICATION SYSTEM, AND BASE STATION | ||
Former [2017/32] | PROCÉDÉ DE RAPPORT D'INFORMATIONS, SYSTÈME DE COMMUNICATION MOBILE ET STATION DE BASE | Entry into regional phase | 13.10.2016 | Translation filed | 13.10.2016 | National basic fee paid | 13.10.2016 | Search fee paid | 04.04.2017 | Designation fee(s) paid | 04.04.2017 | Examination fee paid | Examination procedure | 13.10.2016 | Date on which the examining division has become responsible | 04.04.2017 | Examination requested [2017/32] | 12.04.2018 | Amendment by applicant (claims and/or description) | 04.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 01.02.2019 | Reply to a communication from the examining division | 07.08.2019 | Communication of intention to grant the patent | 11.11.2019 | Fee for grant paid | 11.11.2019 | Fee for publishing/printing paid | 11.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 21.09.2020 | No opposition filed within time limit [2020/48] | Fees paid | Renewal fee | 24.10.2017 | Renewal fee patent year 03 | 26.10.2018 | Renewal fee patent year 04 | 16.10.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.10.2015 | AL | 18.12.2019 | AT | 18.12.2019 | CY | 18.12.2019 | CZ | 18.12.2019 | DK | 18.12.2019 | EE | 18.12.2019 | FI | 18.12.2019 | HR | 18.12.2019 | IT | 18.12.2019 | LT | 18.12.2019 | LV | 18.12.2019 | MC | 18.12.2019 | MK | 18.12.2019 | MT | 18.12.2019 | NL | 18.12.2019 | PL | 18.12.2019 | RO | 18.12.2019 | RS | 18.12.2019 | SE | 18.12.2019 | SI | 18.12.2019 | SK | 18.12.2019 | SM | 18.12.2019 | TR | 18.12.2019 | BG | 18.03.2020 | NO | 18.03.2020 | GR | 19.03.2020 | IS | 18.04.2020 | PT | 13.05.2020 | [2022/32] |
Former [2022/27] | HU | 01.10.2015 | |
AL | 18.12.2019 | ||
AT | 18.12.2019 | ||
CY | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
IT | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
MT | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
TR | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2021/31] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
IT | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2021/10] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
IT | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/51] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/47] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/40] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/37] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/36] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/35] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/32] | AL | 18.12.2019 | |
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/25] | FI | 18.12.2019 | |
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/23] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/22] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
Former [2020/21] | NO | 18.03.2020 | Documents cited: | Search | [X] - ERICSSON, "Inter-node RRC messages for dual connectivity", vol. RAN WG2, no. Seoul, South Korea; 20140519 - 20140523, (20140509), 3GPP DRAFT; R2-142405 - INTER NODE RRC MESSAGES FOR DUAL CONNECTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_86/Docs/, (20140509), XP050818481 [X] 1-4 * Section 2.1;; figure 1 * | [X] - NTT DOCOMO ET AL, "CG configuration in SCG-ConfigInfo", vol. RAN WG2, no. Shanghai, China; 20141006 - 20141010, (20140927), 3GPP DRAFT; R2-144583_CG CONFIGURATION IN SCG-CONFIGINFO, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_87bis/Docs/, (20140927), XP050870574 [X] 1-4 * Sections 1, 2 * | [X] - NTT DOCOMO ET AL, "Introduction of Dual Connectivity", vol. RAN WG2, no. Dresden, Germany; 20140818 - 20140822, (20140817), 3GPP DRAFT; 36.300_CRXXXX_(REL-12)_R2-143417_INTRODUCTION OF DUAL CONNECTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20140817), XP050794043 [X] 1-4 * Sections 7, 10.1.2.X, Annex L.5 * | [A] - SAMSUNG, "UE capability coordination in Dual-connectivity", vol. RAN WG2, no. Seoul; 20140519 - 20140523, (20140518), 3GPP DRAFT; R2-141968 UE CAPABILITY COORDINATION IN DUAL-CONNECTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20140518), XP050793233 [A] 1-4 * the whole document * | [A] - ERICSSON, "Handling of RRC containers and UE capabilities", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, (20140201), 3GPP DRAFT; R2-140641 - HANDLING OF RRC CONTAINERS AND UE CAPABILITIES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_85/Docs/, (20140201), XP050754441 [A] 1-4 * the whole document * | International search | [A]JP2006287754 (NTT DOCOMO INC [JP]) [A] 1-9* , paragraphs [0017] to [0018] & US 2009/0280749 A1 paragraphs [0061] to [0062] & WO 2006/109435 A1 & EP 1865736 A1 & KR 10-2007-0114809 A & CN 101167399 A *; | [A] - SAMSUNG, "Dual Connectivity RRC PDU specification, miscellaneous issues", 3GPP TSG- RAN WG2 Meeting #86 R2-142534, pages 1 - 7, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_86/Docs/R2-142534.zip, XP050790380 [A] 1-9 | [A] - ALCATEL -LUCENT et al., "SCG reconfiguration handling during SCG change/release", 3GPP TSG-RAN WG2 Meeting #87 R2-143629, pages 1 - 4, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_87/Docs/R2-143629.zip, XP050794600 [A] 1-9 | [A] - SAMSUNG, "Dual Connectivity layer 2 reconfiguration (a.o. on SCG change", 3GPP TSG-RAN WG2 Meeting #87bis R2-144464, (20140926), pages 1 - 12, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_87bis/Docs/R2-144464.zip, (20151208), XP050870350 [A] 1-9 |