blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3239524

EP3239524 - MOUNTING STRUCTURE OF WATER PUMP [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.04.2024
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  19.05.2023
FormerGrant of patent is intended
Status updated on  25.01.2023
FormerExamination is in progress
Status updated on  03.09.2021
FormerRequest for examination was made
Status updated on  29.09.2017
FormerThe international publication has been made
Status updated on  06.09.2017
Most recent event   Tooltip30.08.2024Lapse of the patent in a contracting state
New state(s): LU, MC
published on 02.10.2024 [2024/40]
Applicant(s)For all designated states
Yu, Bingyan
No. 25 Bushang Road
Huanggang Town
Raoping
Chaozhou, Guangdong 515700 / CN
[2017/44]
Inventor(s)01 / QIU, Yuanrui
No. 25 Bushang Road
Huanggang Town
Raoping
Chaozhou Guangdong 515700 / CN
 [2017/44]
Representative(s)Cabinet Nony
11 rue Saint-Georges
75009 Paris / FR
[2023/25]
Former [2017/44]Nony
11 rue Saint-Georges
75009 Paris / FR
Application number, filing date15848155.615.12.2015
[2017/44]
WO2015CN97407
Priority number, dateCN201420841359U27.12.2014         Original published format: CN 201420841359 U
[2017/44]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016101805
Date:30.06.2016
Language:ZH
[2016/26]
Type: A1 Application with search report 
No.:EP3239524
Date:01.11.2017
Language:EN
[2017/44]
Type: B1 Patent specification 
No.:EP3239524
Date:21.06.2023
Language:EN
[2023/25]
Search report(s)International search report - published on:CN30.06.2016
(Supplementary) European search report - dispatched on:EP13.07.2018
ClassificationIPC:F04B53/00, F04D29/60, F04D29/62
[2018/33]
CPC:
F04B53/00 (EP); F04D29/606 (EP); F04D29/628 (EP)
Former IPC [2017/44]F04B53/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/44]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:MONTAGESTRUKTUR EINER WASSERPUMPE[2023/03]
English:MOUNTING STRUCTURE OF WATER PUMP[2017/44]
French:STRUCTURE DE MONTAGE DE POMPE À EAU[2017/44]
Former [2017/44]MONTAGESTRUKTUR FÜR WASSERPUMPE
Entry into regional phase13.04.2016Translation filed 
13.04.2016National basic fee paid 
13.04.2016Search fee paid 
13.04.2016Designation fee(s) paid 
13.04.2016Examination fee paid 
Examination procedure13.04.2016Examination requested  [2017/44]
13.04.2016Date on which the examining division has become responsible
28.01.2019Amendment by applicant (claims and/or description)
02.09.2021Despatch of a communication from the examining division (Time limit: M04)
30.12.2021Reply to a communication from the examining division
26.01.2023Communication of intention to grant the patent
10.05.2023Fee for grant paid
10.05.2023Fee for publishing/printing paid
10.05.2023Receipt of the translation of the claim(s)
Opposition(s)22.03.2024No opposition filed within time limit [2024/22]
Fees paidRenewal fee
02.01.2018Renewal fee patent year 03
02.01.2019Renewal fee patent year 04
02.01.2020Renewal fee patent year 05
11.01.2021Renewal fee patent year 06
03.01.2022Renewal fee patent year 07
02.01.2023Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT21.06.2023
CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
IT21.06.2023
LT21.06.2023
LV21.06.2023
MC21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SI21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
LU15.12.2023
[2024/40]
Former [2024/26]AT21.06.2023
CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
IT21.06.2023
LT21.06.2023
LV21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SI21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/24]AT21.06.2023
CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SI21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/22]AT21.06.2023
CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/10]AT21.06.2023
CZ21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/09]AT21.06.2023
CZ21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
Former [2024/08]FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
Former [2024/03]FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2024/01]HR21.06.2023
LT21.06.2023
LV21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/51]HR21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/50]SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/48]SE21.06.2023
NO21.09.2023
Documents cited:Search[XI]FR597729  (ESCHER WYSS & CIE CONST MEC) [X] 1 * page 1, lines 42-51; figure 1 * [I] 2-10;
 [XI]JPS58144068  (HITACHI LTD) [X] 1 * abstract * [I] 2-10;
 [I]JPS58204995  (HITACHI LTD) [I] 1-10 * abstract *;
 [XI]JPH06288382  (NIKKISO CO LTD) [X] 1 * abstract * [I] 2-10;
 [Y]CN2761890Y  (XINRU ENTPR CO LTD [CN]) [Y] 1-10* abstract *;
 [Y]US7191998  (CHALBERG PHILIP E [US], et al) [Y] 1-10 * abstract *
International search[A]JPH09126198  (KUBOTA KK) [A] 1-10* , the whole document *;
 [Y]CN2761890Y  (XINRU ENTPR CO LTD [CN]) [Y] 1, 3-4, 6-8, 10 * , description, page 5, last paragraph, and figure 3 *;
 [Y]US7191998  (CHALBERG PHILIP E [US], et al) [Y] 1, 3-4, 6-8, 10 * , description, column 4, lines 4-60, and figure 1 *;
 [A]CN101240786  (WENSAN ZHOU [CN]) [A] 1-10 * , the whole document *;
 [Y]CN201277201Y  (CHUAN FAN ELECTRIC CO LTD [CN]) [Y] 1, 3-4, 6-8, 10 * , description, page 2, last paragraph to page 3, last paragraph, and figure 7 *;
 [A]US2011123370  (KIM HARK KOO [KR], et al) [A] 1-10 * , the whole document *;
 [A]CN202468269U  (RIYI MOTOR CO LTD) [A] 1-10 * , the whole document *;
 [PX]CN204458309U  (GUANGDONG BOYU GROUP CO LTD, et al) [PX] 1-10 * , claims 1-10 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.