blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3206436

EP3206436 - METHOD FOR TRANSMITTING/RECEIVING SIGNAL RELATED TO NBIFOM IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.10.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  01.11.2019
FormerGrant of patent is intended
Status updated on  14.04.2019
FormerRequest for examination was made
Status updated on  14.07.2017
FormerThe international publication has been made
Status updated on  05.05.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
[2019/49]
Former [2017/33]For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
Inventor(s)01 / KIM, Laeyoung
IP Center
LG Electronics Inc.
19 Yangjae-daero 11gil
Seocho-gu
Seoul 06772 / KR
02 / KIM, Hyunsook
IP Center
LG Electronics Inc.
19 Yangjae-daero 11gil
Seocho-gu
Seoul 06772 / KR
03 / RYU, Jinsook
IP Center
LG Electronics Inc.
19 Yangjae-daero 11gil
Seocho-gu
Seoul 06772 / KR
04 / KIM, Jaehyun
IP Center
LG Electronics Inc.
19 Yangjae-daero 11gil
Seocho-gu
Seoul 06772 / KR
05 / KIM, Taehun
IP Center
LG Electronics Inc.
19 Yangjae-daero 11gil
Seocho-gu
Seoul 06772 / KR
 [2017/33]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2019/49]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Former [2017/33]Cabinet Plasseraud
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date15849303.106.10.2015
[2017/33]
WO2015KR10545
Priority number, dateUS201462060539P06.10.2014         Original published format: US 201462060539 P
[2017/33]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016056815
Date:14.04.2016
Language:KO
[2016/15]
Type: A1 Application with search report 
No.:EP3206436
Date:16.08.2017
Language:EN
[2017/33]
Type: B1 Patent specification 
No.:EP3206436
Date:04.12.2019
Language:EN
[2019/49]
Search report(s)International search report - published on:KR14.04.2016
(Supplementary) European search report - dispatched on:EP14.05.2018
ClassificationIPC:H04W40/02
[2017/33]
CPC:
H04L45/22 (EP); H04L45/38 (EP,US); H04L47/20 (EP,US);
H04W28/0215 (EP,US); H04W28/18 (US); H04W40/02 (US);
H04W40/12 (EP); H04W48/16 (US); H04W76/18 (EP);
H04W76/25 (US); H04L45/28 (EP); H04W76/12 (EP);
H04W76/16 (EP); H04W88/06 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/33]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN ZUM SENDEN/EMPFANGEN EINES SIGNALS IN VERBINDUNG MIT EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM UND VORRICHTUNG DAFÜR[2017/33]
English:METHOD FOR TRANSMITTING/RECEIVING SIGNAL RELATED TO NBIFOM IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR[2017/33]
French:PROCÉDÉ D'ÉMISSION/RÉCEPTION D'UN SIGNAL RELATIF À UNE MOBILITÉ NBIFOM DANS UN SYSTÈME DE COMMUNICATION SANS FIL, ET APPAREIL ASSOCIÉ[2017/33]
Entry into regional phase04.05.2017Translation filed 
04.05.2017National basic fee paid 
04.05.2017Search fee paid 
04.05.2017Designation fee(s) paid 
04.05.2017Examination fee paid 
Examination procedure04.05.2017Examination requested  [2017/33]
04.05.2017Date on which the examining division has become responsible
15.04.2019Communication of intention to grant the patent
23.08.2019Fee for grant paid
23.08.2019Fee for publishing/printing paid
23.08.2019Receipt of the translation of the claim(s)
Opposition(s)07.09.2020No opposition filed within time limit [2020/46]
Fees paidRenewal fee
25.10.2017Renewal fee patent year 03
24.10.2018Renewal fee patent year 04
25.10.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.10.2015
AL04.12.2019
AT04.12.2019
CY04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
MK04.12.2019
MT04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
TR04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
[2022/32]
Former [2022/27]HU06.10.2015
AL04.12.2019
AT04.12.2019
CY04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
MT04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
TR04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2021/31]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2021/10]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/51]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/47]AL04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/40]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/37]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
PT29.04.2020
Former [2020/36]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
PT29.04.2020
Former [2020/35]AL04.12.2019
CZ04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/34]AL04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/32]AL04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/26]FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/23]FI04.12.2019
LT04.12.2019
LV04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/22]FI04.12.2019
LT04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
Former [2020/21]NO04.03.2020
Documents cited:Search[A]US2005091333  (KOBAYASHI IKUKO [JP], et al) [A] 1,12* the whole document *;
 [A]WO2010108426  (HUAWEI TECH CO LTD [CN], et al) [A] 1,12 * the whole document *;
 [A]US2014068200  (SCHNAPP MICHAEL GORDON [TW], et al) [A] 1,12 * the whole document *;
 [A]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Network based IP flow mobility (Release 13)", (20140725), 3GPP DRAFT; 23861-191 RM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/Latest_SA2_Specs/Latest_draft_S2_Specs/, (20140725), XP050835286 [A] 1,12 * the whole document *
 [A]  - ZTE ET AL, "IP flow mobility solutions for S2b (GTP) - UE-initiated and Network-initiated IP flow mobi", vol. SA WG2, no. Dublin, Ireland; 20140707 - 20140711, (20140702), 3GPP DRAFT; S2-142449_NBIFOM S2B UE-INITIATED AND NETWORK-INITIATED, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FR, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_104_Dublin/Docs/, (20140702), XP050836884 [A] 1,12 * the whole document *
International search[A]WO2013082245  (INTERDIGITAL PATENT HOLDINGS [US]) [A] 1-12 * See paragraphs [0483]-[0493]; and figure 63. *;
 [A]  - ERICSSON, "Network-initiated IFOM using S2a and GTP", 3GPP TSG-SA WG2 #104, Dublin, Ireland, (20140711), pages 2 - 142679, XP050837072 [A] 1-12 * See section 7.3.X.4.3.1; and figure 7.3.X.4.3.1-1. *
 [A]  - "3GPP; TSG-SA; Network based IP flow mobility (Release 13", 3GPP TR 23.861 V1.9.1, (20140728), XP050774676 [A] 1-12 * See section 6.1.2, 7.2.2.4.1, 7.2.2.6, 7.6.1: and figure 7.1.1.5.1-1 *
 [A]  - QUALCOMM INCORPORATED, "Basic Principles for NB_IFOM solutions", 3GPP TSG-SA WG2 #104, Dublin, Ireland, (20140702), pages 2 - 142566, XP050836997 [A] 1-12 * See section 1. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.