blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3212455

EP3212455 - METHOD AND SYSTEM FOR SWITCHING FROM A FIRST POWER SUPPLY PATH TO A SECOND POWER SUPPLY PATH [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.12.2021
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  22.01.2021
FormerGrant of patent is intended
Status updated on  21.09.2020
FormerExamination is in progress
Status updated on  19.11.2019
FormerRequest for examination was made
Status updated on  04.08.2017
FormerThe international publication has been made
Status updated on  10.03.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Scania CV AB
151 87 Södertälje / SE
[2021/17]
Former [2017/36]For all designated states
Scania CV AB
151 87 Södertälje / SE
Inventor(s)01 / BJÖRKMAN, Mathias
Stockrosvägen 11
S-146 50 Tullinge / SE
02 / PETTERSSON, Niklas
Lundagatan 44 B
S-117 27 Stockholm / SE
 [2017/36]
Representative(s)Scania CV AB
Patents, GP 117kv
151 87 Södertälje / SE
[2017/36]
Application number, filing date15854168.026.10.2015
[2017/36]
WO2015SE51130
Priority number, dateSE2014005129930.10.2014         Original published format: SE 1451299
[2017/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016068780
Date:06.05.2016
Language:EN
[2016/18]
Type: A1 Application with search report 
No.:EP3212455
Date:06.09.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 06.05.2016 takes the place of the publication of the European patent application.
[2017/36]
Type: B1 Patent specification 
No.:EP3212455
Date:24.02.2021
Language:EN
[2021/08]
Search report(s)International search report - published on:SE06.05.2016
(Supplementary) European search report - dispatched on:EP12.06.2018
ClassificationIPC:B60L3/00, B60L5/18, B60K28/10, B60K6/22, B60K6/48, B60L5/00, B60L15/20, B60K6/28, B60W10/26, B60W10/08, B60L50/16, B60L50/53
[2020/42]
CPC:
B60K6/28 (EP,US); B60K6/22 (SE,US); B60L3/0061 (KR);
B60W10/08 (US); B60K28/10 (SE,US); B60K6/48 (EP,US);
B60L1/003 (US); B60L15/2045 (EP,KR,US); B60L3/00 (US);
B60L3/0069 (EP,KR,US); B60L3/0092 (KR); B60L5/18 (EP,SE,US);
B60L50/16 (EP,US); B60L50/53 (EP,KR,US); B60W10/26 (US);
B60K2006/4825 (EP,US); B60L2200/18 (EP,US); B60L2200/26 (EP,US);
B60L2200/36 (EP,US); B60L2210/10 (EP,US); B60L2210/14 (US);
B60L2210/40 (EP,US); B60L2240/12 (EP,KR,US); B60L2240/421 (EP,KR,US);
B60L2240/423 (EP,KR,US); B60L2240/427 (EP,KR,US); B60L2260/26 (EP,US);
B60L5/00 (EP,US); B60Y2200/91 (KR); B60Y2200/92 (KR);
Y02T10/62 (EP,US); Y02T10/64 (EP,US); Y02T10/70 (EP,US);
Y02T10/7072 (EP,US); Y02T10/72 (EP,US) (-)
Former IPC [2018/28]B60L3/00, B60K6/22, B60K28/10, B60L5/18, B60L11/18, B60K6/48, B60L5/00, B60L11/14, B60L15/20, B60W10/08, B60W10/26, B60K6/28
Former IPC [2017/36]B60L3/00, B60K6/22, B60K28/10, B60L5/18
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/36]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN UND SYSTEM ZUR UMSCHALTUNG EINES ERSTEN STROMVERSORGUNGSWEGS ZU EINEM ZWEITEN STROMVERSORGUNGSWEG[2017/36]
English:METHOD AND SYSTEM FOR SWITCHING FROM A FIRST POWER SUPPLY PATH TO A SECOND POWER SUPPLY PATH[2017/36]
French:PROCÉDÉ ET SYSTÈME DE COMMUTATION D'UN PREMIER TRAJET D'ALIMENTATION ÉLECTRIQUE À UN SECOND TRAJET D'ALIMENTATION ÉLECTRIQUE[2017/36]
Entry into regional phase30.05.2017National basic fee paid 
30.05.2017Search fee paid 
30.05.2017Designation fee(s) paid 
30.05.2017Examination fee paid 
Examination procedure09.03.2017Date on which the examining division has become responsible
30.05.2017Examination requested  [2017/36]
12.12.2018Amendment by applicant (claims and/or description)
22.11.2019Despatch of a communication from the examining division (Time limit: M04)
15.04.2020Reply to a communication from the examining division
22.09.2020Communication of intention to grant the patent
15.01.2021Fee for grant paid
15.01.2021Fee for publishing/printing paid
15.01.2021Receipt of the translation of the claim(s)
Opposition(s)25.11.2021No opposition filed within time limit [2022/05]
Fees paidRenewal fee
11.10.2017Renewal fee patent year 03
11.10.2018Renewal fee patent year 04
15.10.2019Renewal fee patent year 05
14.10.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.10.2015
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
MT24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.10.2021
LU26.10.2021
CH31.10.2021
LI31.10.2021
[2024/41]
Former [2024/22]HU26.10.2015
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.10.2021
LU26.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/30]HU26.10.2015
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.10.2021
LU26.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/27]HU26.10.2015
AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.10.2021
LU26.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/48]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.10.2021
LU26.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/37]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU26.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/35]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU26.10.2021
Former [2022/33]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/23]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/13]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/10]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/08]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/07]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/50]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/49]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/48]AT24.02.2021
CZ24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/46]AT24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/42]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/39]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/38]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/37]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
RS24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/36]FI24.02.2021
HR24.02.2021
LT24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/35]FI24.02.2021
HR24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Former [2021/33]FI24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Documents cited:Search[A]US1466011  (YOUMANS WILLIAM R) [A] 1-17 * the whole document *;
 [XI]US4301899  (MCSPARRAN LLOYD W, et al) [X] 1,4,11-17 * column 1, line 1 - column 14, line 60 * * abstract * * figures 1-6 * * claims 1-16 * [I] 2,3,5-10;
 [I]EP2051358  (MITSUBISHI ELECTRIC CORP [JP]) [I] 1-17 * abstract * * figures 1, 2 * * paragraphs [0014] - [0024] *;
 [A]US2014012446  (KUMAR AJITH KUTTANNAIR [US], et al) [A] 1-17* the whole document *
International search[A]JPS62216843  (MEIDENSHA ELECTRIC MFG CO LTD) [A] 1-17 * ; abstract *;
 [A]EP0718143  (TOSHIBA KK [JP]) [A] 1-17* ; whole document *;
 [A]JP2012090380  (TOSHIBA CORP) [A] 1-17 * ; abstract *;
 [A]JP2014131486  (TOSHIBA CORP) [A] 1-17 * ; abstract *
by applicantEP2051358
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.