blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3217221

EP3217221 - PELLICLE SUPPORT FRAME AND PRODUCTION METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.03.2023
Database last updated on 31.05.2024
FormerThe patent has been granted
Status updated on  25.03.2022
FormerGrant of patent is intended
Status updated on  01.12.2021
FormerRequest for examination was made
Status updated on  11.08.2017
FormerThe international publication has been made
Status updated on  28.04.2017
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 03.07.2024 [2024/27]
Applicant(s)For all designated states
Nippon Light Metal Co., Ltd.
2-20, Higashi-Shinagawa 2-chome Shinagawa-ku
Tokyo 140-8628 / JP
[2017/37]
Inventor(s)01 / ISHITO Nobuyuki
161 Kambara
Shimizu-ku
Shizuoka-shi Shizuoka 421-3297 / JP
 [2017/37]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2022/17]
Former [2017/37]Piésold, Alexander James
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date15856945.909.09.2015
[2017/37]
WO2015JP75550
Priority number, dateJP2014022452104.11.2014         Original published format: JP 2014224521
[2017/37]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016072149
Date:12.05.2016
Language:JA
[2016/19]
Type: A1 Application with search report 
No.:EP3217221
Date:13.09.2017
Language:EN
[2017/37]
Type: B1 Patent specification 
No.:EP3217221
Date:27.04.2022
Language:EN
[2022/17]
Search report(s)International search report - published on:JP12.05.2016
(Supplementary) European search report - dispatched on:EP20.06.2018
ClassificationIPC:G03F1/64, B23K20/00, G03F1/62, C25D11/04
[2018/29]
CPC:
G03F1/64 (EP,KR,US); B23K20/00 (EP,KR,US); C25D11/04 (US);
G03F1/62 (EP,KR,US)
Former IPC [2017/37]G03F1/64, B23K20/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/37]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:PELLIKELSTÜTZRAHMEN UND HERSTELLUNGSVERFAHREN[2017/37]
English:PELLICLE SUPPORT FRAME AND PRODUCTION METHOD[2017/37]
French:CADRE DE SUPPORT DE PELLICULE ET PROCÉDÉ DE PRODUCTION[2017/37]
Entry into regional phase27.04.2017Translation filed 
27.04.2017National basic fee paid 
27.04.2017Search fee paid 
27.04.2017Designation fee(s) paid 
27.04.2017Examination fee paid 
Examination procedure27.04.2017Examination requested  [2017/37]
27.04.2017Date on which the examining division has become responsible
16.01.2019Amendment by applicant (claims and/or description)
02.12.2021Communication of intention to grant the patent
17.03.2022Fee for grant paid
17.03.2022Fee for publishing/printing paid
17.03.2022Receipt of the translation of the claim(s)
Opposition(s)30.01.2023No opposition filed within time limit [2023/14]
Fees paidRenewal fee
19.09.2017Renewal fee patent year 03
18.09.2018Renewal fee patent year 04
18.09.2019Renewal fee patent year 05
22.09.2020Renewal fee patent year 06
24.09.2021Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.09.2015
AL27.04.2022
AT27.04.2022
CY27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
IT27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
MK27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
GB09.09.2022
IE09.09.2022
LU09.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
[2024/27]
Former [2024/21]HU09.09.2015
AL27.04.2022
AT27.04.2022
CY27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
IT27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
GB09.09.2022
IE09.09.2022
LU09.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2024/18]HU09.09.2015
AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
IT27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
GB09.09.2022
IE09.09.2022
LU09.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2024/11]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
IT27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
GB09.09.2022
IE09.09.2022
LU09.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/47]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
GB09.09.2022
IE09.09.2022
LU09.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/42]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
IE09.09.2022
LU09.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/35]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
IE09.09.2022
LU09.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/33]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
IE09.09.2022
LU09.09.2022
Former [2023/30]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
LU09.09.2022
Former [2023/25]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/22]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/17]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/09]AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/07]AT27.04.2022
DK27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
PL27.04.2022
RS27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2022/51]AT27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
PL27.04.2022
RS27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2022/50]AT27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
PL27.04.2022
RS27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
PT29.08.2022
Former [2022/49]AT27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
PT29.08.2022
Former [2022/47]AT27.04.2022
ES27.04.2022
FI27.04.2022
LT27.04.2022
SE27.04.2022
NO27.07.2022
PT29.08.2022
Documents cited:Search[A]JPH05107747  (SEIKO EPSON CORP) [A] 1-4 * abstract *;
 [A]US2001009334  (KAWASAKI TAKESHI [JP], et al) [A] 1 * paragraph [0021]; figure 1 ** paragraph [0065] *;
 [XY]JP2003107678  (MITSUI CHEMICALS INC) [X] 1 * abstract * * paragraph [0011] * * paragraph [0018] * [Y] 2-4;
 [Y]EP1898261  (SHINETSU CHEMICAL CO [JP]) [Y] 4 * paragraph [0022] *;
 [Y]US2010323302  (HANAZAKI NORITSUGU [JP], et al) [Y] 2-4 * paragraph [0043]; figures 3A-3E * * paragraph [0090]; figures 5A-5E *;
 [I]JP2013222143  (RENESAS ELECTRONICS CORP) [I] 1 * figure 1 *
International search[A]JPH0343652U  (Fujitsu Ltd.) [A] 1-4* , specification, page 5, line 6 to page 6, line 19; fig. 1 (Family: none) *;
 [A]JP2002202589  (MITSUI CHEMICALS INC) [A] 1-4 * , paragraph [0014]; fig. 1, 2 (Family: none) *;
 [A]JP2004240221  (SEMICONDUCTOR LEADING EDGE TEC) [A] 1-4 * , claim 1; paragraphs [0017] to [0020]; fig. 1, 2 (Family: none) *;
 [A]JP2006184817  (FUJITSU LTD) [A] 1-4 * , paragraphs [0027] to [0033]; fig. 4 to 6 (Family: none) *;
 [A]JP2014081454  (SHINETSU CHEMICAL CO) [A] 1-4 * , claim 1; paragraphs [0020] to [0046]; fig. 1 to 5 & US 2014/0106265 A1 claim 1; paragraphs [0026] to [0052]; fig. 1 to 5 & CN 103728829 A & EP 02722712 A2 & TW 01416799 A & KR 10-2014-0048794 A *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.