blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3220691

EP3220691 - NETWORK NODE SELECTION AND ACTIVATION METHOD AND APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.03.2022
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  09.04.2021
FormerGrant of patent is intended
Status updated on  21.01.2021
FormerExamination is in progress
Status updated on  15.06.2020
FormerRequest for examination was made
Status updated on  18.08.2017
FormerThe international publication has been made
Status updated on  19.05.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza, Keji Road South
Hi-Tech Industrial Park, Nanshan District
Shenzhen City, Guangdong 518057 / CN
[2017/38]
Inventor(s)01 / MIAO, Ting
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
02 / YU, Guanghui
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
03 / LIU, Xing
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
04 / LI, Ruimei
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
 [2017/38]
Representative(s)Novagraaf Technologies
Bâtiment O2
2, rue Sarah Bernhardt
CS90017
92665 Asnières-sur-Seine Cedex / FR
[2017/38]
Application number, filing date15859554.617.08.2015
[2017/38]
WO2015CN87273
Priority number, dateCN20141063810013.11.2014         Original published format: CN201410638100
[2017/38]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016074515
Date:19.05.2016
Language:ZH
[2016/20]
Type: A1 Application with search report 
No.:EP3220691
Date:20.09.2017
Language:EN
[2017/38]
Type: B1 Patent specification 
No.:EP3220691
Date:12.05.2021
Language:EN
[2021/19]
Search report(s)International search report - published on:CN19.05.2016
(Supplementary) European search report - dispatched on:EP03.11.2017
ClassificationIPC:H04W24/02, // H04W84/00, H04W84/04, H04W24/08
[2017/48]
CPC:
H04W24/02 (EP,US); H04W48/16 (KR,US); H04W48/20 (KR,US);
H04W24/08 (EP,US); H04W84/005 (EP,US); H04W84/047 (EP,US)
Former IPC [2017/38]H04W48/16
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/38]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:NETZWERKKNOTENAUSWAHL UND AKTIVIERUNGSVERFAHREN UND -VORRICHTUNG[2017/38]
English:NETWORK NODE SELECTION AND ACTIVATION METHOD AND APPARATUS[2017/38]
French:PROCÉDÉ ET APPAREIL DE SÉLECTION ET D'ACTIVATION DE NOEUD DE RÉSEAU[2017/38]
Entry into regional phase19.05.2017Translation filed 
19.05.2017National basic fee paid 
19.05.2017Search fee paid 
19.05.2017Designation fee(s) paid 
19.05.2017Examination fee paid 
Examination procedure19.05.2017Examination requested  [2017/38]
19.05.2017Date on which the examining division has become responsible
31.05.2018Amendment by applicant (claims and/or description)
18.06.2020Despatch of a communication from the examining division (Time limit: M06)
05.11.2020Reply to a communication from the examining division
22.01.2021Communication of intention to grant the patent
02.04.2021Fee for grant paid
02.04.2021Fee for publishing/printing paid
02.04.2021Receipt of the translation of the claim(s)
Opposition(s)15.02.2022No opposition filed within time limit [2022/16]
Fees paidRenewal fee
19.05.2017Renewal fee patent year 03
29.08.2018Renewal fee patent year 04
27.08.2019Renewal fee patent year 05
13.08.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.08.2015
AL12.05.2021
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
MK12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
TR12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IE17.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
[2024/29]
Former [2024/22]HU17.08.2015
AL12.05.2021
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
MK12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IE17.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2023/30]HU17.08.2015
AL12.05.2021
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IE17.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2023/29]HU17.08.2015
AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IE17.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/36]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IE17.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/35]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IE17.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/34]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
LU17.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/29]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
LU17.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/26]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
LU17.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/23]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
LU17.08.2021
CH31.08.2021
LI31.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/21]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
CH31.08.2021
LI31.08.2021
PT13.09.2021
IS22.12.2021
Former [2022/18]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
PT13.09.2021
IS22.12.2021
Former [2022/10]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
PT13.09.2021
IS22.12.2021
Former [2022/09]AT12.05.2021
CZ12.05.2021
DK12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/08]AT12.05.2021
CZ12.05.2021
DK12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/07]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/04]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/52]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/51]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
RS12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/50]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
PT13.09.2021
Former [2021/49]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
Former [2021/47]AT12.05.2021
FI12.05.2021
LT12.05.2021
BG12.08.2021
Former [2021/46]AT12.05.2021
FI12.05.2021
LT12.05.2021
Documents cited:Search[YA]WO2010080013  (SAMSUNG ELECTRONICS CO LTD [KR], et al) [Y] 3,8,12,15 * paragraphs [0016] - [0017] - [0 44] - [0049] - [0 55] , [0 75] , [ 107] - [0108]; figures 2,12; claim 1 * [A] 1,2,4-7,9-11,13,14;
 [YA]US2012142328  (AWONIYI OLUFUNMILOLA O [US], et al) [Y] 8,15 * abstract * * paragraphs [0011] , [0 72]; figure 8; claims 1-3 *[A] 1-7,9-14;
 [XYI]US2013308520  (DAMNJANOVIC ALEKSANDAR [US], et al) [X] 1,6,10,13 * abstract * * paragraphs [0008] , [0 28] , [0 51] - [0070]; figures 7,8; claims 1-3 * [Y] 3,4,8,12,15 [I] 2,3,5,7,9,11,14;
 [YA]US2014269417  (YU LING [FI], et al) [Y] 4,8,12,15 * abstract * * paragraphs [0010] , [0 74] - [0075] - [0 87] - [0090]; figure 5 * [A] 1-3,5-7,9-11,13,14
International search[A]CN1596023  (UNIV BEIHANG [CN]) [A] 1-20 * , the whole document *;
 [A]US2006092879  (JEONG SEONG-HO [KR], et al) [A] 1-20* , the whole document *;
 [X]CN103686946  (CHINESE ACAD INST ACOUSTICS) [X] 1-20 * , claims 1-10 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.