EP3226278 - QUANTITATIVE ANALYSIS DEVICE FOR TRACE CARBON AND QUANTITATIVE ANALYSIS METHOD FOR TRACE CARBON [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 12.07.2019 | ||
Former | Grant of patent is intended Status updated on 08.04.2019 | ||
Former | Request for examination was made Status updated on 01.09.2017 | ||
Former | The international publication has been made Status updated on 19.05.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states JFE Steel Corporation 2-3, Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | [2017/40] | Inventor(s) | 01 /
TANAKA Yuji c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 02 /
YAMASHITA Takako c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 03 /
NAGOSHI Masayasu c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | [2017/40] | Representative(s) | Haseltine Lake Kempner LLP Bürkleinstrasse 10 80538 München / DE | [2019/33] |
Former [2017/40] | Ward, James Norman Haseltine Lake LLP Bürkleinstrasse 10 80538 München / DE | Application number, filing date | 15862942.8 | 23.03.2015 | [2017/40] | WO2015JP58690 | Priority number, date | JP20140242030 | 28.11.2014 Original published format: JP 2014242030 | [2017/40] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016084399 | Date: | 02.06.2016 | Language: | JA | [2016/22] | Type: | A1 Application with search report | No.: | EP3226278 | Date: | 04.10.2017 | Language: | EN | [2017/40] | Type: | B1 Patent specification | No.: | EP3226278 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Search report(s) | International search report - published on: | JP | 02.06.2016 | (Supplementary) European search report - dispatched on: | EP | 27.11.2017 | Classification | IPC: | G01N23/2252, H01J37/256, G01N23/207 | [2019/17] | CPC: |
G01N23/2252 (EP,US);
G01N23/207 (EP,KR,US);
G01N23/225 (KR);
H01J37/18 (KR,US);
H01J37/20 (KR);
H01J37/252 (KR);
H01J37/256 (US);
H01J37/28 (KR,US);
H01J2237/022 (EP,US);
|
Former IPC [2017/40] | H01J37/20, G01N23/207, G01N23/225, H01J37/18, H01J37/252, H01J37/28 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VORRICHTUNG ZUR QUANTITATIVEN ANALYSE FÜR SPURENKOHLENSTOFF UND VERFAHREN ZUR QUANTITATIVEN ANALYSE VON SPURENKOHLENSTOFF | [2017/40] | English: | QUANTITATIVE ANALYSIS DEVICE FOR TRACE CARBON AND QUANTITATIVE ANALYSIS METHOD FOR TRACE CARBON | [2017/40] | French: | DISPOSITIF ET PROCÉDÉ D'ANALYSE QUANTITATIVE POUR CARBONE À L'ÉTAT DE TRACES | [2017/40] | Entry into regional phase | 18.05.2017 | Translation filed | 18.05.2017 | National basic fee paid | 18.05.2017 | Search fee paid | 18.05.2017 | Designation fee(s) paid | 18.05.2017 | Examination fee paid | Examination procedure | 18.05.2017 | Examination requested [2017/40] | 18.05.2017 | Date on which the examining division has become responsible | 22.06.2018 | Amendment by applicant (claims and/or description) | 03.05.2019 | Communication of intention to grant the patent | 02.07.2019 | Fee for grant paid | 02.07.2019 | Fee for publishing/printing paid | 02.07.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 18.05.2017 | Renewal fee patent year 03 | 27.03.2018 | Renewal fee patent year 04 | 26.03.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2015 | AL | 14.08.2019 | AT | 14.08.2019 | CY | 14.08.2019 | CZ | 14.08.2019 | DK | 14.08.2019 | EE | 14.08.2019 | ES | 14.08.2019 | FI | 14.08.2019 | HR | 14.08.2019 | IT | 14.08.2019 | LT | 14.08.2019 | LV | 14.08.2019 | MC | 14.08.2019 | MK | 14.08.2019 | MT | 14.08.2019 | PL | 14.08.2019 | RO | 14.08.2019 | RS | 14.08.2019 | SE | 14.08.2019 | SI | 14.08.2019 | SK | 14.08.2019 | SM | 14.08.2019 | TR | 14.08.2019 | BG | 14.11.2019 | NO | 14.11.2019 | GR | 15.11.2019 | IS | 14.12.2019 | PT | 16.12.2019 | IE | 23.03.2020 | LU | 23.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | [2022/32] |
Former [2022/28] | HU | 23.03.2015 | |
AL | 14.08.2019 | ||
AT | 14.08.2019 | ||
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
MT | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
IE | 23.03.2020 | ||
LU | 23.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/13] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
IE | 23.03.2020 | ||
LU | 23.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/07] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
IE | 23.03.2020 | ||
LU | 23.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/04] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
LU | 23.03.2020 | ||
Former [2020/50] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/37] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/36] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/27] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/22] | AL | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/17] | AL | 14.08.2019 | |
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/15] | AL | 14.08.2019 | |
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/12] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/10] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/09] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NO | 14.11.2019 | ||
Former [2020/08] | LT | 14.08.2019 | |
NO | 14.11.2019 | Documents cited: | Search | [A]JP2001283761 (JEOL LTD) [A] 1-9* paragraphs [0020] , [0032] , [0033]; figures 1,2 *; | [Y]JP2007178445 (JEOL LTD) [Y] 1-9 * paragraphs [0009] , [0027] , [0028]; figure 1 *; | [Y]JP2011034895 (HITACHI HIGH TECH CORP) [Y] 3,4,8 * paragraph [0005]; figure 3 *; | [Y]EP2757572 (JFE STEEL CORP [JP]) [Y] 1-9 * paragraphs [0002] - [0004] - [0012] , [0017] , [0022]; claims 1,3 * | International search | [Y]JPH09237602 (HITACHI LTD) [Y] 1-9 * , paragraph [0002] (Family: none) *; | [Y]JP2006164893 (HORON KK) [Y] 4 * , claims 1, 4 & US 2006/0138363 A1 & DE 102005057069 A1 *; | [A]JP2008091270 (TOPCON CORP, et al) [A] 1-9* , entire text; all drawings (Family: none) *; | [Y]JP4499125B (JEOL Ltd.) [Y] 1-9 * , paragraphs [0001] to [0010]; fig. 1 (Family: none) *; | [Y]JP2010160080 (HITACHI HIGH TECH CORP) [Y] 9 * , paragraph [0014] (Family: none) *; | [Y]JP2013012454 (JFE STEEL CORP) [Y] 1-9 * , paragraphs [0001] to [0022] & WO 2013/038910 A & EP 2757572 A1 & CN 103782363 A & KR 10-2014-0061451 A * |