EP3235674 - ROUGH TERRAIN CRANE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.11.2021 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 11.12.2020 | ||
Former | Grant of patent is intended Status updated on 01.10.2020 | ||
Former | Examination is in progress Status updated on 04.03.2020 | ||
Former | Request for examination was made Status updated on 22.09.2017 | ||
Former | The international publication has been made Status updated on 01.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Tadano Ltd. Ko-34, Shindencho Takamatsu-shi, Kagawa 761-0185 / JP | [2017/43] | Inventor(s) | 01 /
OMORI, Kazuya c/o TADANO LTD. Ko-34, Shinden-cho Takamatsu-shi, Kagawa 761-0185 / JP | 02 /
KUSAKA, Fumitsugu c/o TADANO LTD. Ko-34, Shinden-cho Takamatsu-shi, Kagawa 761-0185 / JP | 03 /
MITANI, Kenta c/o TADANO LTD. Ko-34, Shinden-cho Takamatsu-shi, Kagawa 761-0185 / JP | [2017/43] | Representative(s) | Geskes, Christoph Geskes Patent- und Rechtsanwälte Gustav-Heinemann-Ufer 74b 50968 Köln / DE | [2017/43] | Application number, filing date | 15869593.2 | 17.08.2015 | [2017/43] | WO2015JP73019 | Priority number, date | JP20140257065 | 19.12.2014 Original published format: JP 2014257065 | [2017/43] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016098384 | Date: | 23.06.2016 | Language: | JA | [2016/25] | Type: | A1 Application with search report | No.: | EP3235674 | Date: | 25.10.2017 | Language: | EN | [2017/43] | Type: | B1 Patent specification | No.: | EP3235674 | Date: | 13.01.2021 | Language: | EN | [2021/02] | Search report(s) | International search report - published on: | JP | 23.06.2016 | (Supplementary) European search report - dispatched on: | EP | 18.06.2018 | Classification | IPC: | B60K13/04, B66C23/40, F01N3/08, F01N3/20, B60K15/063 | [2018/29] | CPC: |
B60K13/04 (EP,KR,US);
B66C23/62 (US);
B60K15/063 (EP,US);
B66C23/40 (EP,KR,US);
B66C23/78 (US);
F01N3/08 (KR);
F01N3/2066 (EP,US);
B60Y2200/416 (EP,KR,US);
B66C23/42 (US);
B66C2700/0357 (US);
F01N2590/08 (EP,US);
F01N2610/02 (US);
|
Former IPC [2017/43] | B60K13/04, B66C23/40, F01N3/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | KRAN FÜR UNEBENES GELÄNDE | [2017/43] | English: | ROUGH TERRAIN CRANE | [2017/43] | French: | GRUE TOUT-TERRAIN | [2017/43] | Entry into regional phase | 04.07.2017 | Translation filed | 04.07.2017 | National basic fee paid | 04.07.2017 | Search fee paid | 04.07.2017 | Designation fee(s) paid | 04.07.2017 | Examination fee paid | Examination procedure | 15.09.2016 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 04.07.2017 | Examination requested [2017/43] | 04.07.2017 | Date on which the examining division has become responsible | 28.11.2018 | Amendment by applicant (claims and/or description) | 09.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 03.07.2020 | Reply to a communication from the examining division | 02.10.2020 | Communication of intention to grant the patent | 02.12.2020 | Fee for grant paid | 02.12.2020 | Fee for publishing/printing paid | 02.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 14.10.2021 | No opposition filed within time limit [2021/51] | Fees paid | Renewal fee | 04.07.2017 | Renewal fee patent year 03 | 27.08.2018 | Renewal fee patent year 04 | 29.08.2019 | Renewal fee patent year 05 | 27.08.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.08.2015 | AL | 13.01.2021 | AT | 13.01.2021 | CY | 13.01.2021 | CZ | 13.01.2021 | DK | 13.01.2021 | EE | 13.01.2021 | ES | 13.01.2021 | FI | 13.01.2021 | HR | 13.01.2021 | IT | 13.01.2021 | LT | 13.01.2021 | LV | 13.01.2021 | MC | 13.01.2021 | MK | 13.01.2021 | NL | 13.01.2021 | PL | 13.01.2021 | RO | 13.01.2021 | RS | 13.01.2021 | SE | 13.01.2021 | SI | 13.01.2021 | SK | 13.01.2021 | SM | 13.01.2021 | BG | 13.04.2021 | NO | 13.04.2021 | GR | 14.04.2021 | IS | 13.05.2021 | PT | 13.05.2021 | GB | 17.08.2021 | IE | 17.08.2021 | LU | 17.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | FR | 31.08.2021 | LI | 31.08.2021 | [2024/22] |
Former [2023/30] | HU | 17.08.2015 | |
AL | 13.01.2021 | ||
AT | 13.01.2021 | ||
CY | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
IT | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
NL | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
GB | 17.08.2021 | ||
IE | 17.08.2021 | ||
LU | 17.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/29] | HU | 17.08.2015 | |
AL | 13.01.2021 | ||
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
IT | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
NL | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
GB | 17.08.2021 | ||
IE | 17.08.2021 | ||
LU | 17.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/27] | HU | 17.08.2015 | |
AL | 13.01.2021 | ||
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
IT | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
GB | 17.08.2021 | ||
IE | 17.08.2021 | ||
LU | 17.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/35] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
IT | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
GB | 17.08.2021 | ||
IE | 17.08.2021 | ||
LU | 17.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/34] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
IT | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
LU | 17.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/23] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
IT | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
LU | 17.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/21] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/18] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2022/13] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2022/10] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2022/08] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2022/07] | AL | 13.01.2021 | |
AT | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/50] | AT | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/49] | AT | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/48] | AT | 13.01.2021 | |
CZ | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/46] | AT | 13.01.2021 | |
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/42] | AT | 13.01.2021 | |
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/39] | AT | 13.01.2021 | |
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/38] | AT | 13.01.2021 | |
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/37] | AT | 13.01.2021 | |
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
RS | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/36] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/35] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
NO | 13.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/33] | FI | 13.01.2021 | |
LT | 13.01.2021 | ||
NO | 13.04.2021 | ||
PT | 13.05.2021 | Documents cited: | Search | [A]JP2003020936 (KOMATSU MFG CO LTD) [A] 1-4* figures 1,2 *; | [XI]US2010038162 (KAMIYA SHOHEI [JP], et al) [X] 1-3 * figures 1,2,4,10 * [I] 4; | [XI]EP2233714 (HITACHI CONSTRUCTION MACHINERY [JP]) [X] 1-3 * figures 1-3 * [I] 4; | [XI]WO2014192197 (KOMATSU MFG CO LTD [JP]) [X] 1-3 * figures 1-3,5 * [I] 4 | International search | [Y]JP2009040602 (TADANO LTD) [Y] 1-5 * , paragraphs [0019], [0020], [0029]; fig. 1, 6, 7 (Family: none) *; | [Y]JP2009079422 (KOBELCO CONSTR MACHINERY LTD) [Y] 1-5 * , paragraphs [0045] to [0049], [0064]; fig. 3, 4, 9 & US 2010/0192551 A1 paragraphs [0045] to [0049], [0064]; fig. 3, 4, 9 & WO 2009/041163 A1 & EP 2194194 A1 & CN 101809232 A *; | [Y]JP2013002082 (HITACHI CONSTRUCTION MACHINERY) [Y] 3-5* , paragraphs [0083], [0091]; fig. 11 & US 9027697 B2 column 13, line 59 to column 14, line 3; column 15, lines 7 to 10; fig. 11 & WO 2012/172903 A1 & EP 2722446 A1 & CN 103608524 A & KR 10-2014-0036180 A * |