EP3245092 - POWER TRANSMISSION SYSTEM AND VEHICLE COMPRISING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 21.11.2021 | ||
Former | Examination is in progress Status updated on 26.02.2021 | ||
Former | Request for examination was made Status updated on 20.10.2017 | ||
Former | The international publication has been made Status updated on 04.08.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states BYD Company Limited No. 3009, BYD Road Pingshan Shenzhen, Guangdong 518118 / CN | [2017/47] | Inventor(s) | 01 /
YANG, Dongsheng No. 3009 BYD Road Pingshan Shenzhen Guangdong 518118 / CN | 02 /
LIAN, Yubo No. 3009 BYD Road Pingshan Shenzhen Guangdong 518118 / CN | 03 /
ZHANG, Jintao No. 3009 BYD Road Pingshan Shenzhen Guangdong 518118 / CN | 04 /
LUO, Hongbin No. 3009 BYD Road Pingshan Shenzhen Guangdong 518118 / CN | [2017/47] | Representative(s) | Dehns Germany Partnerschaft mbB Postfach 33 04 29 80064 München / DE | [N/P] |
Former [2022/18] | DehnsGermany Partnerschaft von Patentanwälten Postfach 33 04 29 80064 München / DE | ||
Former [2017/47] | m patent group Postfach 33 04 29 80064 München / DE | Application number, filing date | 15877570.0 | 30.06.2015 | [2017/47] | WO2015CN82998 | Priority number, date | CN20151024172 | 16.01.2015 Original published format: CN201510024172 | CN20152033060U | 16.01.2015 Original published format: CN 201520033060 U | [2017/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016112655 | Date: | 21.07.2016 | Language: | EN | [2016/29] | Type: | A1 Application with search report | No.: | EP3245092 | Date: | 22.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.07.2016 takes the place of the publication of the European patent application. | [2017/47] | Type: | B1 Patent specification | No.: | EP3245092 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | International search report - published on: | CN | 21.07.2016 | (Supplementary) European search report - dispatched on: | EP | 08.03.2018 | Classification | IPC: | B60K6/36 | [2018/15] | CPC: |
B60K6/36 (EP,US);
B60K6/40 (US);
B60K6/38 (US);
B60K6/448 (EP,US);
B60K6/48 (EP,US);
B60K6/52 (EP,US);
B60K6/547 (EP,US);
F16H3/006 (EP,US);
F16H3/085 (US);
B60K1/02 (EP,US);
B60K17/356 (EP,US);
B60K2006/4808 (EP,US);
B60Y2304/00 (US);
B60Y2400/428 (US);
B60Y2400/70 (US);
F16H2003/0822 (EP,US);
F16H2003/0931 (EP,US);
Y02T10/62 (EP,US);
|
Former IPC [2017/47] | B60K6/36, B60K6/54 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | KRAFTÜBERTRAGUNGSSYSTEM UND FAHRZEUG DAMIT | [2017/47] | English: | POWER TRANSMISSION SYSTEM AND VEHICLE COMPRISING THE SAME | [2017/47] | French: | SYSTÈME DE TRANSMISSION DE PUISSANCE ET VÉHICULE LE COMPRENANT | [2017/47] | Entry into regional phase | 04.08.2017 | National basic fee paid | 04.08.2017 | Search fee paid | 04.08.2017 | Designation fee(s) paid | 04.08.2017 | Examination fee paid | Examination procedure | 04.08.2017 | Examination requested [2017/47] | 04.08.2017 | Date on which the examining division has become responsible | 19.09.2018 | Amendment by applicant (claims and/or description) | 25.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 25.06.2021 | Reply to a communication from the examining division | 22.11.2021 | Communication of intention to grant the patent | 22.03.2022 | Fee for grant paid | 22.03.2022 | Fee for publishing/printing paid | 22.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 04.08.2017 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 | 25.06.2019 | Renewal fee patent year 05 | 31.03.2020 | Renewal fee patent year 06 | 22.06.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2015 | AL | 04.05.2022 | AT | 04.05.2022 | CY | 04.05.2022 | CZ | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | IT | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | NL | 04.05.2022 | PL | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | BE | 30.06.2022 | IE | 30.06.2022 | LU | 30.06.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/22] |
Former [2024/20] | HU | 30.06.2015 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BE | 30.06.2022 | ||
IE | 30.06.2022 | ||
LU | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/18] | HU | 30.06.2015 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BE | 30.06.2022 | ||
IE | 30.06.2022 | ||
LU | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/11] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BE | 30.06.2022 | ||
IE | 30.06.2022 | ||
LU | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BE | 30.06.2022 | ||
IE | 30.06.2022 | ||
LU | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/21] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 30.06.2022 | ||
LU | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/20] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/11] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/48] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NL | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Documents cited: | Search | [Y]JPH0993714 (MITSUBISHI MOTORS CORP) [Y] 11,12 * abstract *; | [XYI]JP2009156305 (TOYOTA MOTOR CORP) [X] 1-5,7,8,15 * abstract; paragraph [0139]; figures 11,12 * [Y] 11,12 [I] 6,9,10; | [Y]EP2340954 (YANG TAI-HER [TW]) [Y] 11* figures 5-7 *; | [A]EP2390127 (BYD CO LTD [CN]) [A] 1,3,4,6 * paragraphs [0023] - [0027]; figure 3 *; | [A]WO2013000830 (AVL LIST GMBH [AT], et al) [A] 1,3,4,6 * the whole document *; | [Y]DE102011086743 (SCHAEFFLER TECHNOLOGIES AG [DE]) [Y] 11,12 * paragraphs [0032] - [0040] - [0 57] - [0062]; figures 1,4 * | International search | [X]JP2009154610 (TOYOTA MOTOR CORP) [X] 1-17, 20-30 * description, paragraphs [0049]-[0079] and figure 1 *; | [A]CN102648103 (AISIN AI CO LTD) [A] 1-30 * the whole document *; | [A]CN103807368 (HYUNDAI MOTOR CO LTD) [A] 1-30 * the whole document *; | [A]CN203805685U (GREAT WALL MOTOR CO LTD) [A] 1-30 * the whole document *; | [A]CN204055300U (BYD CO LTD) [A] 1-30 * the whole document *; | [E]CN204674363U (BYD CO LTD) [E] 1-30* the whole document * |