blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3091102

EP3091102 - CUTTING TOOL AND METHOD FOR MAKING THE SAME [Right-click to bookmark this link]
Former [2016/45]HARD COATING, CUTTING TOOL, AND HARD COATING MANUFACTURING METHOD
[2022/42]
StatusNo opposition filed within time limit
Status updated on  26.01.2024
Database last updated on 30.09.2024
FormerThe patent has been granted
Status updated on  17.02.2023
FormerGrant of patent is intended
Status updated on  03.10.2022
FormerExamination is in progress
Status updated on  26.04.2019
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): BE
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Sumitomo Electric Hardmetal Corp.
1-1, Koyakita 1-chome
Itami-shi, Hyogo 664-0016 / JP
[2016/45]
Inventor(s)01 / PASEUTH, Anongsack
c/o SUMITOMO ELECTRIC HARDMETAL CORP.
776 Aza Naie
Naie-cho
Sorachi-gun Hokkaido 079-0304 / JP
02 / DETANI, Takanori
c/o SUMITOMO ELECTRIC HARDMETAL CORP.
776 Aza Naie
Naie-cho
Sorachi-gun Hokkaido 079-0304 / JP
 [2016/45]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2016/45]
Application number, filing date15877908.230.09.2015
[2016/45]
WO2015JP77696
Priority number, dateJP2015000529514.01.2015         Original published format: JP 2015005295
[2016/45]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016113956
Date:21.07.2016
Language:JA
[2016/29]
Type: A1 Application with search report 
No.:EP3091102
Date:09.11.2016
Language:EN
[2016/45]
Type: B1 Patent specification 
No.:EP3091102
Date:22.03.2023
Language:EN
[2023/12]
Search report(s)International search report - published on:JP21.07.2016
(Supplementary) European search report - dispatched on:EP21.08.2017
ClassificationIPC:C23C16/34, B23B27/14, B23B51/00, B23C5/16, B23D77/00, B23F21/00, B23G5/06, C23C16/52, C23C28/04, C23C16/44, C23C30/00
[2023/07]
CPC:
C23C30/005 (EP,KR); C23C16/34 (EP,KR,US); B23B27/148 (US);
C23C16/44 (EP,US); C23C16/52 (EP,KR,US); C23C16/56 (KR);
B23B2228/04 (US); B23B2228/10 (KR); B23B2228/105 (US);
B23C2228/10 (KR); B23F21/00 (EP,US); B32B2307/536 (US);
B32B2307/58 (US) (-)
Former IPC [2022/40]C23C16/34, B23B27/14, B23B51/00, B23C5/16, B23D77/00, B23F21/00, B23G5/06, C23C16/52, C23C28/04, C23C16/44
Former IPC [2017/38]C23C16/34, B23B27/14, B23B51/00, B23C5/16, B23D77/00, B23F21/00, B23G5/06, C23C16/52, C23C28/04
Former IPC [2016/45]C23C16/34, B23B27/14, B23B51/00, B23C5/16, B23D77/00, B23F21/00, B23G5/06, C23C16/52
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/45]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:SCHNEIDWERKZEUG UND HERSTELLUNGSVERFAHREN[2022/42]
English:CUTTING TOOL AND METHOD FOR MAKING THE SAME[2022/42]
French:OUTIL DE COUPE ET SON PROCÉDÉ DE FABRICATION[2022/42]
Former [2016/45]HARTBESCHICHTUNG, SCHNEIDWERKZEUG UND HARTBESCHICHTUNGSHERSTELLUNGSVERFAHREN
Former [2016/45]HARD COATING, CUTTING TOOL, AND HARD COATING MANUFACTURING METHOD
Former [2016/45]REVÊTEMENT DUR, OUTIL DE COUPE ET PROCÉDÉ DE FABRICATION DE REVÊTEMENT DUR
Entry into regional phase05.08.2016Translation filed 
05.08.2016National basic fee paid 
05.08.2016Search fee paid 
05.08.2016Designation fee(s) paid 
05.08.2016Examination fee paid 
Examination procedure05.08.2016Examination requested  [2016/45]
27.11.2017Amendment by applicant (claims and/or description)
02.05.2019Despatch of a communication from the examining division (Time limit: M04)
11.09.2019Reply to a communication from the examining division
11.08.2021Despatch of a communication from the examining division (Time limit: M04)
27.08.2021Reply to a communication from the examining division
04.10.2022Communication of intention to grant the patent
08.02.2023Fee for grant paid
08.02.2023Fee for publishing/printing paid
08.02.2023Receipt of the translation of the claim(s)
Opposition(s)02.01.2024No opposition filed within time limit [2024/09]
Fees paidRenewal fee
26.09.2017Renewal fee patent year 03
11.09.2018Renewal fee patent year 04
13.09.2019Renewal fee patent year 05
14.09.2020Renewal fee patent year 06
15.09.2021Renewal fee patent year 07
11.08.2022Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
BE30.09.2023
CH30.09.2023
FR30.09.2023
GB30.09.2023
IE30.09.2023
LU30.09.2023
[2024/36]
Former [2024/34]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
CH30.09.2023
FR30.09.2023
GB30.09.2023
IE30.09.2023
LU30.09.2023
Former [2024/33]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
GB30.09.2023
IE30.09.2023
LU30.09.2023
Former [2024/28]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
MC22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
LU30.09.2023
Former [2024/26]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
IT22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
LU30.09.2023
Former [2024/25]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
LU30.09.2023
Former [2024/10]AT22.03.2023
CZ22.03.2023
DK22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SI22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2023/50]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
PL22.03.2023
RO22.03.2023
RS22.03.2023
SK22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
IS22.07.2023
PT24.07.2023
Former [2023/49]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RO22.03.2023
RS22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/48]AT22.03.2023
EE22.03.2023
ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/46]ES22.03.2023
FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
SM22.03.2023
NO22.06.2023
GR23.06.2023
PT24.07.2023
Former [2023/38]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
NL22.03.2023
RS22.03.2023
NO22.06.2023
GR23.06.2023
Former [2023/37]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
RS22.03.2023
NO22.06.2023
GR23.06.2023
Former [2023/36]FI22.03.2023
HR22.03.2023
LT22.03.2023
LV22.03.2023
RS22.03.2023
NO22.06.2023
Former [2023/35]HR22.03.2023
LT22.03.2023
RS22.03.2023
NO22.06.2023
Former [2023/34]LT22.03.2023
RS22.03.2023
Former [2023/33]LT22.03.2023
Documents cited:Search[X]US2004110039  (HORLING ANDERS [SE], et al) [X] 1-6 * paragraphs [0015] , [0016] , [0018] , [0044]; table 2 *;
 [X]  - TODT J ET AL, "Superior oxidation resistance, mechanical properties and residual stresses of an Al-rich nanolamellar Ti0.05Al0.95N coating prepared by CVD", SURFACE AND COATINGS TECHNOLOGY, ELSEVIER BV, AMSTERDAM, NL, (20140711), vol. 258, doi:10.1016/J.SURFCOAT.2014.07.022, ISSN 0257-8972, pages 1119 - 1127, XP029020164 [X] 7-10 * Experiments *

DOI:   http://dx.doi.org/10.1016/j.surfcoat.2014.07.022
International search[A]JP2011516722  (Kennametal Inc.) [A] 1-10* , claims & US 2010/0323176 A1 all claims & WO 2009/112115 A1 & EP 2252721 A & DE 102008013965 A & CA 2717187 A & MX 2010009890 A & KR 10-2010-0122918 A & CN 101970717 A & RU 2010141746 A & BR PI0908924 A *;
 [A]JP2013510946  (Fraunhofer-Gesellschaft zur Forderung der angewandten Forschung e.V.) [A] 1-10 * , claims & US 2012/0219789 A1 all claims & WO 2011/058132 A1 & EP 2499275 A & DE 102009046667 A & CN 102686772 A & KR 10-2012-0102076 A & RU 2012123952 A *;
 [A]JP2014129562  (SUMITOMO ELEC HARDMETAL CORP) [A] 1-10 * , claims & WO 2014/103533 A1 & EP 2940181 A & CN 104870685 A *;
 [A]JP2014133267  (MITSUBISHI MATERIALS CORP) [A] 1-10 * , claims (Family: none) *
by applicantJP2008545063
 JP2014129562
    - I. ENDLER ET AL., "Novel aluminum-rich Ti Al N coatings by LPCVD", SURFACE & COATINGS TECHNOLOGY, (2008), vol. 203, pages 530 - 533
    - J. KECKES ET AL., "Self-organized periodic soft-hard nanolamellae in polycrystalline TiAIN thin films", THIN SOLID FILMS, (2013), vol. 545, pages 29 - 32
    - X-sen Ouryoku Sokutei Hou, YOKENDO CO., LTD., (1981), pages 54 - 67
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.