EP3249844 - DATA PROCESSING METHOD AND APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 22.05.2020 | ||
Former | Grant of patent is intended Status updated on 06.01.2020 | ||
Former | Examination is in progress Status updated on 09.11.2018 | ||
Former | Request for examination was made Status updated on 27.10.2017 | ||
Former | The international publication has been made Status updated on 25.08.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/48] | Inventor(s) | 01 /
ZENG, Qinghai Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
GUO, Yi Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2017/48] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2017/48] | Application number, filing date | 15882333.6 | 17.02.2015 | [2017/48] | WO2015CN73228 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016131194 | Date: | 25.08.2016 | Language: | ZH | [2016/34] | Type: | A1 Application with search report | No.: | EP3249844 | Date: | 29.11.2017 | Language: | EN | [2017/48] | Type: | B1 Patent specification | No.: | EP3249844 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Search report(s) | International search report - published on: | CN | 25.08.2016 | (Supplementary) European search report - dispatched on: | EP | 02.02.2018 | Classification | IPC: | H04L1/18 | [2017/48] | CPC: |
H04L1/1812 (EP,US);
H04L1/1822 (EP,US);
H04L1/1861 (EP,US);
H04L1/1893 (EP,US);
H04W72/0453 (US);
H04W72/23 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DATENVERARBEITUNGSVERFAHREN UND -VORRICHTUNG | [2017/48] | English: | DATA PROCESSING METHOD AND APPARATUS | [2017/48] | French: | PROCÉDÉ ET APPAREIL DE TRAITEMENT DE DONNÉES | [2017/48] | Entry into regional phase | 24.08.2017 | Translation filed | 24.08.2017 | National basic fee paid | 24.08.2017 | Search fee paid | 24.08.2017 | Designation fee(s) paid | 24.08.2017 | Examination fee paid | Examination procedure | 24.08.2017 | Examination requested [2017/48] | 24.08.2017 | Date on which the examining division has become responsible | 06.08.2018 | Amendment by applicant (claims and/or description) | 07.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.03.2019 | Reply to a communication from the examining division | 07.01.2020 | Communication of intention to grant the patent | 16.03.2020 | Fee for grant paid | 16.03.2020 | Fee for publishing/printing paid | 14.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20177801.6 / EP3771125 | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] | Fees paid | Renewal fee | 24.08.2017 | Renewal fee patent year 03 | 21.02.2018 | Renewal fee patent year 04 | 20.02.2019 | Renewal fee patent year 05 | 20.02.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.02.2015 | AL | 24.06.2020 | AT | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | ES | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | IT | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | NL | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SE | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | TR | 24.06.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | IE | 17.02.2021 | LU | 17.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | [2024/29] |
Former [2024/22] | HU | 17.02.2015 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
MK | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 17.02.2021 | ||
LU | 17.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/33] | HU | 17.02.2015 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 17.02.2021 | ||
LU | 17.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/30] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 17.02.2021 | ||
LU | 17.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/33] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 17.02.2021 | ||
LU | 17.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 17.02.2021 | ||
LU | 17.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
LU | 17.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/36] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/21] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/10] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
PT | 26.10.2020 | ||
Former [2021/04] | AL | 24.06.2020 | |
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2021/01] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/51] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/50] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/48] | FI | 24.06.2020 | |
LT | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
Former [2020/47] | LT | 24.06.2020 | |
NO | 24.09.2020 | Documents cited: | Search | [XAI]US2012236815 (HU LIJIE [CN], et al) [X] 1,2,4,6,8,9,11 * page 6; table 1 * * page 2, paragraph 8 - paragraph 9 * [A] 7,13,14[I] 3,5,10,12; | [XAI]US2014211722 (PIETRASKI PHILIP J [US], et al) [X] 1,2,4,6,8,9,11 * page 1, paragraph 12 - paragraph 14 * * page 6, paragraph 71 * * page 7, paragraph 96 - page 8, paragraph 112 * [A] 7,13,14 [I] 3,5,10,12 | International search | [A]US2007113138 (KWON HWAN-JOON [KR], et al) [A] 1-20* , the whole document *; | [Y]CN101627570 (LG ELECTRONICS INC) [Y] 1-20 * , description, paragraphs [0018]-[0035], and figures 1 and 6-9 *; | [Y]CN101741525 (ZTE CORP) [Y] 1-20 * , description, paragraphs [0006]-[0025], [0036]-[0063] and [0079]-[0082], and figures 1-5 *; | [A]CN103684677 (ZTE CORP) [A] 1-20 * , the whole document *; | [A]CN103812621 (ALCATEL LUCENT SHANGHAI BELL) [A] 1-20 * , the whole document * |