EP3267522 - STATUS DETECTION DEVICE AND STATUS DETECTION METHOD FOR FUEL CELL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.07.2019 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 03.08.2018 | ||
Former | Grant of patent is intended Status updated on 24.04.2018 | ||
Former | Request for examination was made Status updated on 08.12.2017 | ||
Former | The international publication has been made Status updated on 08.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Nissan Motor Co., Ltd. 2, Takara-cho Kanagawa-ku Yokohama-shi, Kanagawa 221-0023 / JP | [2018/02] | Inventor(s) | 01 /
KOTAKA, Toshikazu c/o Nissan Motor Co., Ltd. Intellectual Property Department 1-1 Morinosatoaoyama Atsugi-shi Kanagawa 243-0123 / JP | 02 /
AOKI, Tetsuya c/o Nissan Motor Co., Ltd. Intellectual Property Department 1-1 Morinosatoaoyama Atsugi-shi Kanagawa 243-0123 / JP | [2018/36] |
Former [2018/02] | 01 /
KOTAKA, Toshikazu c/o Intellectual Property Department of NISSAN MOTOR CO. LTD. 1-1 Morinosatoaoyama Atsugi-shi Kanagawa 243-0123 / JP | ||
02 /
AOKI, Tetsuya c/o Intellectual Property Department of NISSAN MOTOR CO. LTD. 1-1 Morinosatoaoyama Atsugi-shi Kanagawa 243-0123 / JP | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/02] | Application number, filing date | 15883927.4 | 03.03.2015 | [2018/02] | WO2015JP56261 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016139759 | Date: | 09.09.2016 | Language: | JA | [2016/36] | Type: | A1 Application with search report | No.: | EP3267522 | Date: | 10.01.2018 | Language: | EN | [2018/02] | Type: | B1 Patent specification | No.: | EP3267522 | Date: | 05.09.2018 | Language: | EN | [2018/36] | Search report(s) | International search report - published on: | JP | 09.09.2016 | (Supplementary) European search report - dispatched on: | EP | 17.01.2018 | Classification | IPC: | H01M8/04828, H01M8/04492, H01M8/04537, H01M8/04858, // H01M8/1018 | [2018/07] | CPC: |
H01M8/04529 (EP,US);
H01M8/04634 (EP,KR,US);
H01M8/04492 (US);
G01R27/04 (KR);
H01M8/04641 (US);
H01M8/04664 (US);
H01M8/0485 (EP,US);
H01M8/04949 (EP,US);
H01M8/1039 (US);
H01M2008/1095 (EP,US);
H01M2250/20 (US);
Y02E60/50 (EP);
Y02T90/40 (US)
(-)
|
Former IPC [2018/02] | H01M8/04, H01M8/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | STATUSDETEKTIONSVORRICHTUNG UND STATUSDETEKTIONSVERFAHREN FÜR BRENNSTOFFZELLE | [2018/02] | English: | STATUS DETECTION DEVICE AND STATUS DETECTION METHOD FOR FUEL CELL | [2018/02] | French: | DISPOSITIF ET PROCÉDÉ DE DÉTECTION D'ÉTAT POUR PILE À COMBUSTIBLE | [2018/02] | Entry into regional phase | 07.09.2017 | Translation filed | 07.09.2017 | National basic fee paid | 07.09.2017 | Search fee paid | 07.09.2017 | Designation fee(s) paid | 07.09.2017 | Examination fee paid | Examination procedure | 07.08.2015 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 07.09.2017 | Amendment by applicant (claims and/or description) | 07.09.2017 | Examination requested [2018/02] | 07.09.2017 | Date on which the examining division has become responsible | 25.04.2018 | Communication of intention to grant the patent | 16.07.2018 | Fee for grant paid | 16.07.2018 | Fee for publishing/printing paid | 16.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 06.06.2019 | No opposition filed within time limit [2019/33] | Fees paid | Renewal fee | 07.09.2017 | Renewal fee patent year 03 | 28.03.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.03.2015 | AL | 05.09.2018 | AT | 05.09.2018 | CY | 05.09.2018 | CZ | 05.09.2018 | DK | 05.09.2018 | EE | 05.09.2018 | ES | 05.09.2018 | FI | 05.09.2018 | HR | 05.09.2018 | IT | 05.09.2018 | LT | 05.09.2018 | LV | 05.09.2018 | MC | 05.09.2018 | MK | 05.09.2018 | NL | 05.09.2018 | PL | 05.09.2018 | RO | 05.09.2018 | RS | 05.09.2018 | SE | 05.09.2018 | SI | 05.09.2018 | SK | 05.09.2018 | SM | 05.09.2018 | TR | 05.09.2018 | BG | 05.12.2018 | NO | 05.12.2018 | GR | 06.12.2018 | IS | 05.01.2019 | PT | 05.01.2019 | IE | 03.03.2019 | LU | 03.03.2019 | MT | 03.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | [2022/32] |
Former [2021/32] | HU | 03.03.2015 | |
AL | 05.09.2018 | ||
AT | 05.09.2018 | ||
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 03.03.2019 | ||
LU | 03.03.2019 | ||
MT | 03.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2021/26] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 03.03.2019 | ||
LU | 03.03.2019 | ||
MT | 03.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/29] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 03.03.2019 | ||
LU | 03.03.2019 | ||
MT | 03.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/17] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 03.03.2019 | ||
LU | 03.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/11] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 03.03.2019 | ||
LU | 03.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/09] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
IE | 03.03.2019 | ||
LU | 03.03.2019 | ||
Former [2020/01] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
LU | 03.03.2019 | ||
Former [2019/46] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/37] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/34] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/26] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/23] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/22] | AL | 05.09.2018 | |
CZ | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/21] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/20] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/12] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/11] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/10] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/08] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
NO | 05.12.2018 | ||
Former [2019/07] | LT | 05.09.2018 | Documents cited: | Search | [A]JP2011003344 (NISSAN MOTOR) [A] 1-18 * abstract *; | [A]JP2013145692 (HONDA MOTOR CO LTD) [A] 1-18* abstract * | International search | [A]US2006062982 (HAMMOND CUNNINGHAM PAULA T [US], et al) [A] 1-18* , paragraphs [0070] to [0072]; fig. 4 & WO 2006/034224 A2 *; | [A]JP2013258042 (NIPPON SOKEN, et al) [A] 1-18 * , paragraphs [0027], [0031] to [0034], [0051] to [0052], [0076] to [0082]; fig. 5, 7, 12 to 13 (Family: none) *; | [A]JP2014229528 (TOYOTA MOTOR CORP) [A] 1-18 * , paragraphs [0020], [0035], [0039]; fig. 2 to 3, 8 (Family: none) * |