EP3279669 - MODULAR-TYPE ANALYSIS SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.11.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 17.12.2021 | ||
Former | Grant of patent is intended Status updated on 10.08.2021 | ||
Former | Request for examination was made Status updated on 05.01.2018 | ||
Former | The international publication has been made Status updated on 31.10.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Shimadzu Corporation 1 Nishinokyo-Kuwabara-cho Nakagyo-ku Kyoto-shi, Kyoto 604-8511 / JP | [2018/06] | Inventor(s) | 01 /
YOKOI, Yusuke c/o Shimadzu Corporation 1 Nishinokyo-Kuwabara-cho Nakagyo-ku Kyoto-shi Kyoto 604-8511 / JP | [2018/06] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2018/06] | Application number, filing date | 15887662.3 | 03.04.2015 | [2018/06] | WO2015JP60584 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016157516 | Date: | 06.10.2016 | Language: | JA | [2016/40] | Type: | A1 Application with search report | No.: | EP3279669 | Date: | 07.02.2018 | Language: | EN | [2018/06] | Type: | B1 Patent specification | No.: | EP3279669 | Date: | 19.01.2022 | Language: | EN | [2022/03] | Search report(s) | International search report - published on: | JP | 06.10.2016 | (Supplementary) European search report - dispatched on: | EP | 09.02.2018 | Classification | IPC: | G01N30/86, G01N35/00, // G01N30/88 | [2018/11] | CPC: |
G01N30/86 (EP,US);
G01N30/24 (US);
G01N30/02 (EP,US);
G01N35/00 (EP,US);
G01N35/00871 (US);
G01N2030/027 (US);
G01N2035/00326 (US);
G01N2035/00891 (US);
G01N30/16 (EP,US);
|
Former IPC [2018/06] | G01N35/00, G01N30/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | MODULARES ANALYSESYSTEM | [2018/06] | English: | MODULAR-TYPE ANALYSIS SYSTEM | [2018/06] | French: | SYSTÈME D'ANALYSE DE TYPE MODULAIRE | [2018/06] | Entry into regional phase | 25.10.2017 | Translation filed | 28.10.2017 | National basic fee paid | 28.10.2017 | Search fee paid | 28.10.2017 | Designation fee(s) paid | 28.10.2017 | Examination fee paid | Examination procedure | 25.10.2017 | Date on which the examining division has become responsible | 28.10.2017 | Examination requested [2018/06] | 24.08.2018 | Amendment by applicant (claims and/or description) | 11.08.2021 | Communication of intention to grant the patent | 03.12.2021 | Receipt of the translation of the claim(s) | 09.12.2021 | Fee for grant paid | 09.12.2021 | Fee for publishing/printing paid | Opposition(s) | 20.10.2022 | No opposition filed within time limit [2022/52] | Fees paid | Renewal fee | 28.10.2017 | Renewal fee patent year 03 | 24.04.2018 | Renewal fee patent year 04 | 24.04.2019 | Renewal fee patent year 05 | 06.03.2020 | Renewal fee patent year 06 | 15.04.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.04.2015 | AL | 19.01.2022 | AT | 19.01.2022 | CY | 19.01.2022 | CZ | 19.01.2022 | DK | 19.01.2022 | EE | 19.01.2022 | ES | 19.01.2022 | FI | 19.01.2022 | HR | 19.01.2022 | IT | 19.01.2022 | LT | 19.01.2022 | LV | 19.01.2022 | MC | 19.01.2022 | MK | 19.01.2022 | NL | 19.01.2022 | PL | 19.01.2022 | RO | 19.01.2022 | RS | 19.01.2022 | SE | 19.01.2022 | SI | 19.01.2022 | SK | 19.01.2022 | SM | 19.01.2022 | TR | 19.01.2022 | IE | 03.04.2022 | LU | 03.04.2022 | BG | 19.04.2022 | NO | 19.04.2022 | GR | 20.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | IS | 19.05.2022 | PT | 19.05.2022 | [2024/29] |
Former [2024/22] | HU | 03.04.2015 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/20] | HU | 03.04.2015 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/18] | HU | 03.04.2015 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/35] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/20] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/10] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/09] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/08] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 03.04.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/06] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/01] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/49] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/48] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/47] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/46] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/42] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/39] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/36] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/35] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/34] | ES | 19.01.2022 | |
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/33] | LT | 19.01.2022 | |
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
Former [2022/30] | NL | 19.01.2022 | Documents cited: | Search | [A]EP0880027 (SHIMADZU CORP [JP]) [A] 1-4* figures 1,3; claims 1,4,5,6 *; | [YA]US2004158433 (WIMSCHNEIDER ANDREA [DE], et al) [Y] 3 * claims 1,3,6 * [A] 1,2,4; | [YA]US2009223369 (UEGAKI HIDEYUKI [JP], et al) [Y] 3 * paragraph [0023]; claims 1,5 * * paragraphs [0021] , [0022] * * paragraph [0030] * [A] 1,2,4; | [I]WO2013028828 (BIO RAD LABORATORIES [US], et al) [I] 1,4 * figure 1A; claim 1 * * paragraphs [0026] , [0045]; claim 5 * * paragraphs [0025] , [0044] * * paragraph [0051] * | International search | [A]JP2004028932 (HITACHI HIGH TECH CORP) [A] 1-4 * , paragraphs [0025] to [0030] & US 2005/0175506 A1 & EP 1376138 A2 *; | [A]JP3160422U (Shimadzu Corp.) [A] 1-4 * , claim 2; paragraph [0013] (Family: none) *; | [A]JP2011029940 (KEYENCE CO LTD) [A] 1-4* , paragraphs [0047], [0059] to [0060] & US 2011/0018722 A1 & DE 102010032042 A * |