blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3291343

EP3291343 - POSITIVE ELECTRODE ACTIVE MATERIAL FOR NON-AQUEOUS ELECTROLYTE SECONDARY BATTERY, POSITIVE ELECTRODE, AND SECONDARY BATTERY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.06.2023
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  24.06.2022
FormerGrant of patent is intended
Status updated on  16.02.2022
FormerExamination is in progress
Status updated on  17.04.2019
FormerRequest for examination was made
Status updated on  02.02.2018
FormerThe international publication has been made
Status updated on  11.11.2016
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Eliiy Power Co., Ltd.
6-4 Osaki 1-chome
Shinagawa-ku
Tokyo 141-0032 / JP
[2018/10]
Inventor(s)01 / KUZUSHIMA, Yusuke
c/o ELIIY Power Co. Ltd.
6-4 Osaki 1-chome
Shinagawa-ku
Tokyo 141-0032 / JP
02 / HARA, Tomitaro
c/o ELIIY Power Co. Ltd.
6-4 Osaki 1-chome
Shinagawa-ku
Tokyo 141-0032 / JP
 [2018/10]
Representative(s)Zanoli, Enrico, et al
Zanoli & Giavarini S.p.A.
Via Melchiorre Gioia, 64
20125 Milano / IT
[2018/10]
Application number, filing date15891287.301.05.2015
[2018/10]
WO2015JP63138
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016178280
Date:10.11.2016
Language:JA
[2016/45]
Type: A1 Application with search report 
No.:EP3291343
Date:07.03.2018
Language:EN
[2018/10]
Type: B1 Patent specification 
No.:EP3291343
Date:27.07.2022
Language:EN
[2022/30]
Search report(s)International search report - published on:JP10.11.2016
(Supplementary) European search report - dispatched on:EP24.08.2018
ClassificationIPC:H01M4/583, H01M4/36, H01M4/13, H01M4/58, // H01M10/052
[2018/38]
CPC:
H01M4/13 (EP,US); H01M4/366 (EP,KR,US); H01M4/525 (US);
H01M10/052 (EP,KR,US); H01M10/488 (EP,US); H01M4/5825 (EP,KR,US);
H01M4/583 (US); H01M4/625 (KR); H01M10/0525 (US);
H01M2004/028 (US); Y02E60/10 (EP) (-)
Former IPC [2018/10]H01M4/583, H01M4/36
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:POSITIVELEKTRODENAKTIVMATERIAL FÜR SEKUNDÄRBATTERIE MIT WASSERFREIEM ELEKTROLYT, POSITIVELEKTRODE UND SEKUNDÄRBATTERIE[2018/10]
English:POSITIVE ELECTRODE ACTIVE MATERIAL FOR NON-AQUEOUS ELECTROLYTE SECONDARY BATTERY, POSITIVE ELECTRODE, AND SECONDARY BATTERY[2018/10]
French:MATÉRIAU ACTIF D'ÉLECTRODE POSITIVE POUR BATTERIE SECONDAIRE À ÉLECTROLYTE NON AQUEUX, ÉLECTRODE POSITIVE ET BATTERIE SECONDAIRE[2018/10]
Entry into regional phase31.10.2017Translation filed 
31.10.2017National basic fee paid 
31.10.2017Search fee paid 
31.10.2017Designation fee(s) paid 
31.10.2017Examination fee paid 
Examination procedure31.10.2017Examination requested  [2018/10]
31.10.2017Date on which the examining division has become responsible
19.03.2019Amendment by applicant (claims and/or description)
24.04.2019Despatch of a communication from the examining division (Time limit: M04)
06.08.2019Reply to a communication from the examining division
06.09.2019Despatch of a communication from the examining division (Time limit: M04)
27.12.2019Reply to a communication from the examining division
13.05.2020Despatch of a communication from the examining division (Time limit: M04)
18.09.2020Reply to a communication from the examining division
26.01.2022Cancellation of oral proceeding that was planned for 01.02.2022
01.02.2022Date of oral proceedings (cancelled)
17.02.2022Communication of intention to grant the patent
15.06.2022Fee for grant paid
15.06.2022Fee for publishing/printing paid
15.06.2022Receipt of the translation of the claim(s)
Opposition(s)02.05.2023No opposition filed within time limit [2023/27]
Fees paidRenewal fee
31.10.2017Renewal fee patent year 03
18.05.2018Renewal fee patent year 04
02.05.2019Renewal fee patent year 05
29.04.2020Renewal fee patent year 06
25.05.2021Renewal fee patent year 07
12.05.2022Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL27.07.2022
AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
IT27.07.2022
LT27.07.2022
LV27.07.2022
MC27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SI27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
IE01.05.2023
LU01.05.2023
[2024/26]
Former [2024/21]AL27.07.2022
AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
MC27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SI27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
IE01.05.2023
LU01.05.2023
Former [2024/09]AL27.07.2022
AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
MC27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SI27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
LU01.05.2023
Former [2024/08]AL27.07.2022
AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
MC27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SI27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
LU01.05.2023
Former [2023/37]AL27.07.2022
AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SI27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/29]AL27.07.2022
AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/23]AT27.07.2022
CZ27.07.2022
DK27.07.2022
EE27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SK27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/22]AT27.07.2022
CZ27.07.2022
DK27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RO27.07.2022
RS27.07.2022
SE27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/21]DK27.07.2022
ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RS27.07.2022
SE27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/20]ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RS27.07.2022
SE27.07.2022
SM27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/12]ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RS27.07.2022
SE27.07.2022
NO27.10.2022
GR28.10.2022
IS27.11.2022
PT28.11.2022
Former [2023/11]ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
PL27.07.2022
RS27.07.2022
SE27.07.2022
NO27.10.2022
GR28.10.2022
PT28.11.2022
Former [2023/10]ES27.07.2022
FI27.07.2022
HR27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
RS27.07.2022
SE27.07.2022
NO27.10.2022
GR28.10.2022
PT28.11.2022
Former [2023/09]ES27.07.2022
FI27.07.2022
LT27.07.2022
LV27.07.2022
NL27.07.2022
RS27.07.2022
SE27.07.2022
NO27.10.2022
PT28.11.2022
Former [2023/08]ES27.07.2022
FI27.07.2022
LT27.07.2022
NL27.07.2022
RS27.07.2022
SE27.07.2022
NO27.10.2022
Former [2023/06]NL27.07.2022
Documents cited:Search[A]JP2000223120  (MITSUBISHI CHEM CORP) [A] 1-6* paragraph [0037] *;
 [X]KR20130035495  (KOREA BASIC SCIENCE INST [KR], et al) [X] 1,2,4-6 * paragraph [0042]; figure 10 *;
 [X]EP2675002  (SAMSUNG SDI CO LTD [KR], et al) [X] 1-3,5,6 * figure 3A; example 1 *;
 [X]EP2851978  (TOSHIBA KK [JP]) [X] 1,2,5,6 * figure 3; example 1 *
International search[A]JP2000223120  (MITSUBISHI CHEM CORP) [A] 1-6* , entire text & US 6632569 B1 & EP 1005097 A1 & KR 10-2000-35742 A & CN 1261729 A *;
 [A]JP2006302671  (MITSUI MINING CO LTD) [A] 1-6 * , entire text (Family: none) *;
 [A]JP2012234766  (SONY CORP) [A] 1-6 * , entire text & US 2013/52535 A1 & CN 102780026 A *;
 [A]JP2014035859  (TOYOTA MOTOR CORP) [A] 1-6 * , entire text (Family: none) *
Examination   - ANTUNES E F ET AL, "Comparative study of first- and second-order Raman spectra of MWCNT at visible and infrared laser excitation", CARBON, ELSEVIER, OXFORD, GB, vol. 44, no. 11, doi:10.1016/J.CARBON.2006.03.003, ISSN 0008-6223, (20060901), pages 2202 - 2211, (20060901), XP025010801

DOI:   http://dx.doi.org/10.1016/j.carbon.2006.03.003
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.