EP3313255 - EVACUATION STATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 17.06.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Request for examination was made Status updated on 30.03.2018 | ||
Former | The international publication has been made Status updated on 30.12.2016 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states iRobot Corporation 8 Crosby Drive Bedford, MA 01730 / US | [2018/18] | Inventor(s) | 01 /
MORIN, Russell Walter 138 Mill Street Burlington, MA 01803 / US | 02 /
BOESCHENSTEIN, Harold 62 Commonwealth Avenue Apt. 8 Boston, MA 02116 / US | 03 /
SWETT, David Orrin 38 Mokema Avenue Waltham, Massachusetts 02451 / US | 04 /
JONAS, Jude Royston 60 Adelaide Street Hudson, NH 03051 / US | [2018/18] | Representative(s) | Peterreins Schley Patent- und Rechtsanwälte PartG mbB Hermann-Sack-Straße 3 80331 München / DE | [N/P] |
Former [2020/25] | Peterreins Schley Patent- und Rechtsanwälte PartG mbB Hermann-Sack-Strasse 3 80331 München / DE | ||
Former [2018/18] | Peterreins Schley Patent- und Rechtsanwälte Hermann-Sack-Strasse 3 80331 München / DE | Application number, filing date | 15896588.9 | 20.11.2015 | [2018/18] | WO2015US61842 | Priority number, date | US201514750563 | 25.06.2015 Original published format: US201514750563 | [2018/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016209309 | Date: | 29.12.2016 | Language: | EN | [2016/52] | Type: | A1 Application with search report | No.: | EP3313255 | Date: | 02.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.12.2016 takes the place of the publication of the European patent application. | [2018/18] | Type: | B1 Patent specification | No.: | EP3313255 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Search report(s) | International search report - published on: | US | 29.12.2016 | (Supplementary) European search report - dispatched on: | EP | 22.01.2019 | Classification | IPC: | A47L9/19, A47L9/28, A47L9/14 | [2019/08] | CPC: |
A47L9/149 (EP,US);
A47L11/4025 (US);
A47L11/4011 (US);
A47L9/19 (EP,US);
A47L9/2821 (EP,US);
A47L9/2842 (EP,US);
A47L2201/00 (EP);
A47L2201/022 (EP,US);
A47L2201/024 (EP,US);
A47L2201/04 (US)
(-)
|
Former IPC [2018/18] | A47L11/33 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ENTLEERUNGSSTATION | [2019/52] | English: | EVACUATION STATION | [2018/18] | French: | STATION D'ÉVACUATION | [2018/18] |
Former [2018/18] | EVAKUIERUNGSSTATION | Entry into regional phase | 10.11.2017 | National basic fee paid | 10.11.2017 | Search fee paid | 10.11.2017 | Designation fee(s) paid | 10.11.2017 | Examination fee paid | Examination procedure | 10.11.2017 | Examination requested [2018/18] | 10.11.2017 | Date on which the examining division has become responsible | 13.08.2019 | Amendment by applicant (claims and/or description) | 08.01.2020 | Communication of intention to grant the patent | 06.05.2020 | Fee for grant paid | 06.05.2020 | Fee for publishing/printing paid | 06.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20180061.2 / EP3777629 | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 10.11.2017 | Renewal fee patent year 03 | 14.11.2018 | Renewal fee patent year 04 | 04.11.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.11.2015 | AL | 17.06.2020 | AT | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | IT | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | TR | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | IE | 20.11.2020 | LU | 20.11.2020 | BE | 30.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | [2022/33] |
Former [2022/32] | HU | 20.11.2015 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MK | 17.06.2020 | ||
MT | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 20.11.2020 | ||
LU | 20.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2022/27] | HU | 20.11.2015 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MT | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 20.11.2020 | ||
LU | 20.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/46] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 20.11.2020 | ||
LU | 20.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/37] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
LU | 20.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/33] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
LU | 20.11.2020 | ||
Former [2021/31] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/24] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/21] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Documents cited: | Search | [A]US2010107355 (WON CHIKYUNG [US], et al) [A] 1-15* paragraph [0068]; figures 1,13A-16B; claims 1,2,7,9,17,22,23 *; | [A]WO2015082019 (KAERCHER GMBH & CO KG ALFRED [DE]) [A] 1-15 * page 19, paragraph 2 - page 23, paragraph 2; figures 1-7; claims 1-17,20-22,27-32,34 * * page 24, paragraph 1 - page 27, paragraph 5 * | International search | [A]US7412748 (LEE JUN HWA [KR], et al) [A] 1-8 * entire document *; | [Y]US2008201895 (KIM YONG TAE [KR], et al) [Y] 1, 3, 8 * entire document *; | [Y]US2008235897 (KIM DONG WON [KR], et al) [Y] 1, 3, 8 * entire document *; | [A]US2010107355 (WON CHIKYUNG [US], et al) [A] 1-8* entire document *; | [A]US2012291809 (KUHE TUCKER [US], et al) [A] 1-8 * entire document * |