EP3265520 - WHITE INKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.04.2023 Database last updated on 12.08.2024 | |
Former | The patent has been granted Status updated on 13.05.2022 | ||
Former | Grant of patent is intended Status updated on 27.03.2022 | ||
Former | Examination is in progress Status updated on 28.09.2018 | ||
Former | Request for examination was made Status updated on 08.12.2017 | ||
Former | The international publication has been made Status updated on 27.01.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Hewlett-Packard Development Company, L.P. 10300 Energy Drive Spring TX 77389 / US | [2019/20] |
Former [2018/02] | For all designated states Hewlett-Packard Development Company, L.P. 11445 Compaq Center Drive W. Houston, Texas 77070 / US | Inventor(s) | 01 /
KASPERCHIK, Vladek 1070 NE Circle Blvd. Corvallis, Oregon 97330-4239 / US | 02 /
BRUINSMA, Paul Joseph 16399 W. Bernardo Dr. San Diego, California 92127-1899 / US | 03 /
BARRETO, Marcos A. Highway 110 N. Km. 5.1 Aquadilla 00603 / PR | [2018/02] | Representative(s) | Haseltine Lake Kempner LLP One Portwall Square Portwall Lane Bristol BS1 6BH / GB | [N/P] |
Former [2022/24] | Haseltine Lake Kempner LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | ||
Former [2018/02] | Haseltine Lake LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 15899067.1 | 20.07.2015 | [2018/02] | WO2015US41168 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017014745 | Date: | 26.01.2017 | Language: | EN | [2017/04] | Type: | A1 Application with search report | No.: | EP3265520 | Date: | 10.01.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.01.2017 takes the place of the publication of the European patent application. | [2018/02] | Type: | B1 Patent specification | No.: | EP3265520 | Date: | 15.06.2022 | Language: | EN | [2022/24] | Search report(s) | International search report - published on: | KR | 26.01.2017 | (Supplementary) European search report - dispatched on: | EP | 05.01.2018 | Classification | IPC: | C09D11/037, C09C1/28, C09C3/00 | [2018/02] | CPC: |
C09D11/322 (EP,US);
C09C1/3661 (EP,US);
C09C3/063 (EP,US);
C09D11/54 (EP,US);
C01P2004/61 (EP,US);
C01P2004/62 (US);
C01P2006/22 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | WEISSE TINTEN | [2018/02] | English: | WHITE INKS | [2018/02] | French: | ENCRES BLANCHES | [2018/02] | Entry into regional phase | 05.10.2017 | National basic fee paid | 05.10.2017 | Search fee paid | 05.10.2017 | Designation fee(s) paid | 05.10.2017 | Examination fee paid | Examination procedure | 05.10.2017 | Examination requested [2018/02] | 05.10.2017 | Date on which the examining division has become responsible | 05.07.2018 | Amendment by applicant (claims and/or description) | 26.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 03.01.2019 | Reply to a communication from the examining division | 10.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 21.12.2021 | Reply to a communication from the examining division | 28.03.2022 | Communication of intention to grant the patent | 10.05.2022 | Fee for grant paid | 10.05.2022 | Fee for publishing/printing paid | 10.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.03.2023 | No opposition filed within time limit [2023/21] | Fees paid | Renewal fee | 05.10.2017 | Renewal fee patent year 03 | 24.07.2018 | Renewal fee patent year 04 | 22.07.2019 | Renewal fee patent year 05 | 22.07.2020 | Renewal fee patent year 06 | 20.07.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.07.2015 | AL | 15.06.2022 | AT | 15.06.2022 | CY | 15.06.2022 | CZ | 15.06.2022 | DK | 15.06.2022 | EE | 15.06.2022 | ES | 15.06.2022 | FI | 15.06.2022 | HR | 15.06.2022 | IT | 15.06.2022 | LT | 15.06.2022 | LV | 15.06.2022 | MC | 15.06.2022 | MK | 15.06.2022 | NL | 15.06.2022 | PL | 15.06.2022 | RO | 15.06.2022 | RS | 15.06.2022 | SE | 15.06.2022 | SI | 15.06.2022 | SK | 15.06.2022 | SM | 15.06.2022 | IE | 20.07.2022 | LU | 20.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | FR | 15.08.2022 | BG | 15.09.2022 | GB | 15.09.2022 | NO | 15.09.2022 | GR | 16.09.2022 | IS | 15.10.2022 | PT | 17.10.2022 | DE | 01.02.2023 | [2024/22] |
Former [2024/20] | HU | 20.07.2015 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
FR | 15.08.2022 | ||
BG | 15.09.2022 | ||
GB | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2024/18] | HU | 20.07.2015 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
FR | 15.08.2022 | ||
BG | 15.09.2022 | ||
GB | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2024/11] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
FR | 15.08.2022 | ||
BG | 15.09.2022 | ||
GB | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2023/47] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
FR | 15.08.2022 | ||
BG | 15.09.2022 | ||
GB | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2023/35] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
FR | 15.08.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2023/33] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2023/25] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2023/23] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
LU | 20.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
DE | 01.02.2023 | ||
Former [2023/21] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
LU | 20.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/17] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/16] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/12] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/11] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/09] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/08] | AT | 15.06.2022 | |
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/07] | AT | 15.06.2022 | |
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/02] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/50] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/49] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/47] | FI | 15.06.2022 | |
LT | 15.06.2022 | ||
SE | 15.06.2022 | ||
NO | 15.09.2022 | Documents cited: | Search | [X]US3437502 (WERNER ALFRED J) [X] 1-10 * claims 1-11; examples 1-4 *; | [X]WO9718268 (DU PONT [US]) [X] 1-15 * claims 1 and 2; examples 1-5 *; | [X]WO2007124120 (DU PONT [US], et al) [X] 1-15 * examples 1 and 2; page 6, line 20; page 7, lines 13-15 *; | [X]JP2011225867 (DAINIPPON INK & CHEMICALS) [X] 1-15 * examples *; | [X]WO2012170032 (HEWLETT PACKARD DEVELOPMENT CO [US], et al) [X] 1-15 * claims 1 and 6; examples 1-3; [0024-0026] *; | [X]US2013160672 (KASPERCHIK VLADEK [US]) [X] 1-10* examples 1-5 *; | [X]US2015184010 (OKADA TAKASHI [JP], et al) [X] 1-15 * claims 1-13; preparation example 3 * | International search | [A]US3437502 (WERNER ALFRED J) [A] 1-15* See column 7, line 74-column 9, line 26. *; | [Y]US2010222492 (SARKISIAN GEORGE M [US], et al) [Y] 6, 12-15 * See abstract; paragraphs [0031]-[0037], [0048], [0049], [0052]; claims 1, 2, 3, 5. *; | [A]JP2011225867 (DAINIPPON INK & CHEMICALS) [A] 1-15 * See abstract; paragraphs [0036]-[0042]; claims 1-11. *; | [XY]US2013160672 (KASPERCHIK VLADEK [US]) [X] 1-5, 7-11 * See abstract; paragraphs [0007]-[0012], [0014]-[0035], [0037]-[0040], [0049], [0053]; claims 1, 3, 12-15, 20; figures 1-3. * [Y] 6, 12-15; | [A]US2014352573 (KASPERCHIK VLADEK [US], et al) [A] 1-15 * See paragraphs [0028]-[0041]; figures 1A-2B. * | by applicant | US3437502 | WO9718268 | WO2007124120 | JP2011225867 | WO2012170032 | US2013160672 | US2015184010 |