EP3379881 - CONFIGURATION METHODS AND APPARATUS FOR SCHEDULING RESOURCES [Right-click to bookmark this link] | |||
Former [2018/39] | CONFIGURATION METHOD AND APPARATUS FOR SCHEDULING RESOURCES, USER EQUIPMENT AND ENODEB | ||
[2020/12] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 07.04.2020 | ||
Former | Request for examination was made Status updated on 24.08.2018 | ||
Former | The international publication has been made Status updated on 23.06.2017 | Most recent event Tooltip | 16.06.2023 | Lapse of the patent in a contracting state New state(s): NL | published on 19.07.2023 [2023/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/39] | Inventor(s) | 01 /
MIAO, Jinhua Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
ZHANG, Jian Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
QUAN, Wei Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2018/39] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2018/39] | Application number, filing date | 15910484.3 | 15.12.2015 | [2018/39] | WO2015CN97412 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017101011 | Date: | 22.06.2017 | Language: | ZH | [2017/25] | Type: | A1 Application with search report | No.: | EP3379881 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Type: | B1 Patent specification | No.: | EP3379881 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Search report(s) | International search report - published on: | CN | 22.06.2017 | (Supplementary) European search report - dispatched on: | EP | 22.10.2018 | Classification | IPC: | H04W72/12 | [2018/39] | CPC: |
H04W72/543 (EP,US);
H04W72/23 (EP,US);
H04W72/02 (US);
H04W72/12 (US);
H04W72/542 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KONFIGURATIONSVERFAHREN UND -VORRICHTUNGEN ZUR ZEITPLANUNG VON RESSOURCEN | [2020/12] | English: | CONFIGURATION METHODS AND APPARATUS FOR SCHEDULING RESOURCES | [2020/12] | French: | DES PROCÉDÉS ET DES APPAREILS DE CONFIGURATION D'ORDONNANCEMENT DE RESSOURCES | [2020/12] |
Former [2018/39] | KONFIGURATIONSVERFAHREN UND -VORRICHTUNG ZUR ZEITPLANUNG VON RESSOURCEN, BENUTZERGERÄT UND ENODEB | ||
Former [2018/39] | CONFIGURATION METHOD AND APPARATUS FOR SCHEDULING RESOURCES, USER EQUIPMENT AND ENODEB | ||
Former [2018/39] | PROCÉDÉ ET APPAREIL DE CONFIGURATION D'ORDONNANCEMENT DE RESSOURCES, ÉQUIPEMENT UTILISATEUR ET ENODEB | Entry into regional phase | 20.06.2018 | Translation filed | 20.06.2018 | National basic fee paid | 20.06.2018 | Search fee paid | 20.06.2018 | Designation fee(s) paid | 20.06.2018 | Examination fee paid | Examination procedure | 20.06.2018 | Examination requested [2018/39] | 20.06.2018 | Date on which the examining division has become responsible | 23.04.2019 | Amendment by applicant (claims and/or description) | 08.04.2020 | Communication of intention to grant the patent | 22.07.2020 | Fee for grant paid | 22.07.2020 | Fee for publishing/printing paid | 22.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 20.06.2018 | Renewal fee patent year 03 | 31.12.2018 | Renewal fee patent year 04 | 31.12.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.12.2015 | AL | 02.09.2020 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | MT | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | RS | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | SM | 02.09.2020 | TR | 02.09.2020 | NL | 23.09.2020 | BG | 02.12.2020 | NO | 02.12.2020 | GR | 03.12.2020 | GB | 15.12.2020 | IE | 15.12.2020 | LU | 15.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | FR | 31.12.2020 | LI | 31.12.2020 | IS | 02.01.2021 | PT | 04.01.2021 | [2023/29] |
Former [2022/34] | HU | 15.12.2015 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MK | 02.09.2020 | ||
MT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
BE | 31.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/32] | HU | 15.12.2015 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MK | 02.09.2020 | ||
MT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/27] | HU | 15.12.2015 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/23] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/10] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/52] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
FR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/49] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
FR | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/48] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
FR | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/46] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/40] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/23] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
NO | 02.12.2020 | Documents cited: | Search | [XAI]WO2013079114 (NOKIA SIEMENS NETWORKS OY [FI], et al) [X] 1,5,9,13 * page 1, line 7 - line 10 * * page 3, line 3 - line 18 * * page 7, line 22 - page 8, line 13 * [A] 4,12[I] 2,3,6-8,10,11,14,15 | International search | [A]CN102111892 (POTEVIO INST TECHNOLOGY CO LTD) [A] 1-45 * the whole document *; | [A]CN102547610 (HUAWEI TECH CO LTD) [A] 1-45 * , the whole document *; | [X]CN103067864 (TD TECH LTD) [X] 15, 30, 45 * , claims 2 and 5, and description, paragraphs [0029]-[0049] *; | [A]CN103857050 (POTEVIO INST TECHNOLOGY CO LTD) [A] 1-45 * the whole document *; | [X]US2014349695 (ZETTERBERG KRISTINA [SE], et al) [X] 1, 6-10, 12, 13, 16, 21-25, 27, 28, 31, 36-40, 42, 43 * , description, paragraphs [0022]-[0048], and figures 1-7 *; | [X]US2015078231 (BERGSTRÖM ANDREAS [SE], et al) [X] 11, 14, 26, 29, 41, 44 * , description, paragraphs [0028]-[0046] and [0092]-[0112], and figures la, 2a, 3 and 4 *; | [A] - MOTOROLA, "ITU SPS VoIP Performance", 3GPP TSG RAN WG1 MEETING #58 R1-093422, (20090828), pages 1 - 8, XP050597679 [A] 1-45 |