blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3379881

EP3379881 - CONFIGURATION METHODS AND APPARATUS FOR SCHEDULING RESOURCES [Right-click to bookmark this link]
Former [2018/39]CONFIGURATION METHOD AND APPARATUS FOR SCHEDULING RESOURCES, USER EQUIPMENT AND ENODEB
[2020/12]
StatusNo opposition filed within time limit
Status updated on  09.07.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  31.07.2020
FormerGrant of patent is intended
Status updated on  07.04.2020
FormerRequest for examination was made
Status updated on  24.08.2018
FormerThe international publication has been made
Status updated on  23.06.2017
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2018/39]
Inventor(s)01 / MIAO, Jinhua
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
02 / ZHANG, Jian
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
03 / QUAN, Wei
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2018/39]
Representative(s)Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
[2018/39]
Application number, filing date15910484.315.12.2015
[2018/39]
WO2015CN97412
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017101011
Date:22.06.2017
Language:ZH
[2017/25]
Type: A1 Application with search report 
No.:EP3379881
Date:26.09.2018
Language:EN
[2018/39]
Type: B1 Patent specification 
No.:EP3379881
Date:02.09.2020
Language:EN
[2020/36]
Search report(s)International search report - published on:CN22.06.2017
(Supplementary) European search report - dispatched on:EP22.10.2018
ClassificationIPC:H04W72/12
[2018/39]
CPC:
H04W72/543 (EP,US); H04W72/23 (EP,US); H04W72/02 (US);
H04W72/12 (US); H04W72/542 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/39]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:KONFIGURATIONSVERFAHREN UND -VORRICHTUNGEN ZUR ZEITPLANUNG VON RESSOURCEN[2020/12]
English:CONFIGURATION METHODS AND APPARATUS FOR SCHEDULING RESOURCES[2020/12]
French:DES PROCÉDÉS ET DES APPAREILS DE CONFIGURATION D'ORDONNANCEMENT DE RESSOURCES[2020/12]
Former [2018/39]KONFIGURATIONSVERFAHREN UND -VORRICHTUNG ZUR ZEITPLANUNG VON RESSOURCEN, BENUTZERGERÄT UND ENODEB
Former [2018/39]CONFIGURATION METHOD AND APPARATUS FOR SCHEDULING RESOURCES, USER EQUIPMENT AND ENODEB
Former [2018/39]PROCÉDÉ ET APPAREIL DE CONFIGURATION D'ORDONNANCEMENT DE RESSOURCES, ÉQUIPEMENT UTILISATEUR ET ENODEB
Entry into regional phase20.06.2018Translation filed 
20.06.2018National basic fee paid 
20.06.2018Search fee paid 
20.06.2018Designation fee(s) paid 
20.06.2018Examination fee paid 
Examination procedure20.06.2018Examination requested  [2018/39]
20.06.2018Date on which the examining division has become responsible
23.04.2019Amendment by applicant (claims and/or description)
08.04.2020Communication of intention to grant the patent
22.07.2020Fee for grant paid
22.07.2020Fee for publishing/printing paid
22.07.2020Receipt of the translation of the claim(s)
Opposition(s)03.06.2021No opposition filed within time limit [2021/32]
Fees paidRenewal fee
20.06.2018Renewal fee patent year 03
31.12.2018Renewal fee patent year 04
31.12.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.12.2015
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
IS02.01.2021
PT04.01.2021
[2023/29]
Former [2022/34]HU15.12.2015
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
IS02.01.2021
PT04.01.2021
Former [2022/32]HU15.12.2015
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
IS02.01.2021
PT04.01.2021
Former [2022/27]HU15.12.2015
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
IS02.01.2021
PT04.01.2021
Former [2022/23]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
IS02.01.2021
PT04.01.2021
Former [2022/10]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
PT04.01.2021
Former [2021/52]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/49]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
GB15.12.2020
IE15.12.2020
LU15.12.2020
FR31.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/48]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE15.12.2020
LU15.12.2020
FR31.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/46]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE15.12.2020
LU15.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/40]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/37]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/36]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/28]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/25]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/23]AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/22]CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/21]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/10]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/09]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/08]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
Former [2021/07]FI02.09.2020
LT02.09.2020
NO02.12.2020
Documents cited:Search[XAI]WO2013079114  (NOKIA SIEMENS NETWORKS OY [FI], et al) [X] 1,5,9,13 * page 1, line 7 - line 10 * * page 3, line 3 - line 18 * * page 7, line 22 - page 8, line 13 * [A] 4,12[I] 2,3,6-8,10,11,14,15
International search[A]CN102111892  (POTEVIO INST TECHNOLOGY CO LTD) [A] 1-45 * the whole document *;
 [A]CN102547610  (HUAWEI TECH CO LTD) [A] 1-45 * , the whole document *;
 [X]CN103067864  (TD TECH LTD) [X] 15, 30, 45 * , claims 2 and 5, and description, paragraphs [0029]-[0049] *;
 [A]CN103857050  (POTEVIO INST TECHNOLOGY CO LTD) [A] 1-45 * the whole document *;
 [X]US2014349695  (ZETTERBERG KRISTINA [SE], et al) [X] 1, 6-10, 12, 13, 16, 21-25, 27, 28, 31, 36-40, 42, 43 * , description, paragraphs [0022]-[0048], and figures 1-7 *;
 [X]US2015078231  (BERGSTRÖM ANDREAS [SE], et al) [X] 11, 14, 26, 29, 41, 44 * , description, paragraphs [0028]-[0046] and [0092]-[0112], and figures la, 2a, 3 and 4 *;
 [A]  - MOTOROLA, "ITU SPS VoIP Performance", 3GPP TSG RAN WG1 MEETING #58 R1-093422, (20090828), pages 1 - 8, XP050597679 [A] 1-45
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.