EP3214234 - PREFABRICATED PARTS CONNECTOR AND CONNECTION SYSTEM FOR CONNECTING PREFABRICATED CONCRETE PARTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.12.2020 Database last updated on 08.06.2024 | |
Former | The patent has been granted Status updated on 27.12.2019 | ||
Former | Grant of patent is intended Status updated on 03.09.2019 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The application has been published Status updated on 04.08.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states HALFEN GmbH Liebigstrasse 14 40764 Langenfeld / DE | [2017/36] | Inventor(s) | 01 /
Morsink, Richard Ekersdijk 301 7534 PX Enschede / NL | 02 /
Albartus, Dirk Erlenstrasse 16 44795 Bochum / DE | 03 /
Garke, Robert Robert-Koch-Str. 41 99096 Erfurt / DE | 04 /
van de Schoor, Paulus Reinholdstrasse 18 51147 Köln / DE | 05 /
Heidolf, Thorsten Merketalstrasse 13 99425 Weimar / DE | [2017/36] | Representative(s) | Reinhardt, Annette, et al Patentanwälte Dipl.Ing. W. Jackisch & Partner mbB Menzelstraße 40 70192 Stuttgart / DE | [2017/36] | Application number, filing date | 16000532.8 | 05.03.2016 | [2017/36] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3214234 | Date: | 06.09.2017 | Language: | DE | [2017/36] | Type: | B1 Patent specification | No.: | EP3214234 | Date: | 29.01.2020 | Language: | DE | [2020/05] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.08.2016 | Classification | IPC: | E04B1/04, E04B1/41, F16B5/02, // F16B43/00 | [2017/36] | CPC: |
E04B1/41 (EP);
E04F13/0832 (CN);
E04B1/043 (EP);
E04B1/4157 (CN);
E04F13/0855 (CN);
F16B5/0225 (EP);
F16B43/00 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] |
Former [2017/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FERTIGTEILVERBINDER UND VERBINDUNGSSYSTEM ZUM VERBINDEN VON BETONFERTIGTEILEN | [2017/36] | English: | PREFABRICATED PARTS CONNECTOR AND CONNECTION SYSTEM FOR CONNECTING PREFABRICATED CONCRETE PARTS | [2017/36] | French: | CONNECTEUR POUR ÉLÉMENTS PRÉFABRIQUÉS ET SYSTEME DE CONNECTION POUR ÉLÉMENTS PRÉFABRIQUÉS EN BÉTON | [2019/38] |
Former [2017/36] | CONNECTEUR POUR ÉLÉMENTS PRÉFABRIQUÉS ET SYSTÈME DE CONNECTION POUR ÉLÉMENTS PRÉFABRIQUÉS EN BÉTON | Examination procedure | 05.03.2016 | Date on which the examining division has become responsible | 06.03.2018 | Amendment by applicant (claims and/or description) | 06.03.2018 | Examination requested [2018/15] | 04.09.2019 | Communication of intention to grant the patent | 10.12.2019 | Fee for grant paid | 10.12.2019 | Fee for publishing/printing paid | 10.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 30.10.2020 | No opposition filed within time limit [2021/01] | Fees paid | Renewal fee | 23.03.2018 | Renewal fee patent year 03 | 26.03.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.03.2016 | AL | 29.01.2020 | CY | 29.01.2020 | CZ | 29.01.2020 | DK | 29.01.2020 | EE | 29.01.2020 | HR | 29.01.2020 | LT | 29.01.2020 | LV | 29.01.2020 | MC | 29.01.2020 | MK | 29.01.2020 | MT | 29.01.2020 | RO | 29.01.2020 | RS | 29.01.2020 | SI | 29.01.2020 | SK | 29.01.2020 | SM | 29.01.2020 | TR | 29.01.2020 | IE | 05.03.2020 | LU | 05.03.2020 | BG | 29.04.2020 | GB | 29.04.2020 | GR | 30.04.2020 | IS | 29.05.2020 | PT | 21.06.2020 | [2022/31] |
Former [2022/30] | HU | 05.03.2016 | |
AL | 29.01.2020 | ||
CY | 29.01.2020 | ||
CZ | 29.01.2020 | ||
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
MT | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SI | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
TR | 29.01.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
BG | 29.04.2020 | ||
GB | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2022/27] | HU | 05.03.2016 | |
CY | 29.01.2020 | ||
CZ | 29.01.2020 | ||
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
MT | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SI | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
TR | 29.01.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
BG | 29.04.2020 | ||
GB | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2021/22] | CZ | 29.01.2020 | |
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SI | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
BG | 29.04.2020 | ||
GB | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2021/13] | CZ | 29.01.2020 | |
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SI | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2021/08] | CZ | 29.01.2020 | |
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
IE | 05.03.2020 | ||
LU | 05.03.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2021/04] | CZ | 29.01.2020 | |
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
LU | 05.03.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2020/50] | CZ | 29.01.2020 | |
DK | 29.01.2020 | ||
EE | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2020/49] | CZ | 29.01.2020 | |
DK | 29.01.2020 | ||
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
MC | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SK | 29.01.2020 | ||
SM | 29.01.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2020/48] | DK | 29.01.2020 | |
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
RO | 29.01.2020 | ||
RS | 29.01.2020 | ||
SM | 29.01.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2020/47] | DK | 29.01.2020 | |
HR | 29.01.2020 | ||
LT | 29.01.2020 | ||
LV | 29.01.2020 | ||
RS | 29.01.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2020/40] | HR | 29.01.2020 | |
LV | 29.01.2020 | ||
RS | 29.01.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
IS | 29.05.2020 | ||
PT | 21.06.2020 | ||
Former [2020/39] | HR | 29.01.2020 | |
LV | 29.01.2020 | ||
RS | 29.01.2020 | ||
BG | 29.04.2020 | ||
GR | 30.04.2020 | ||
PT | 21.06.2020 | ||
Former [2020/38] | HR | 29.01.2020 | |
LV | 29.01.2020 | ||
RS | 29.01.2020 | ||
GR | 30.04.2020 | ||
PT | 21.06.2020 | ||
Former [2020/37] | HR | 29.01.2020 | |
LV | 29.01.2020 | ||
RS | 29.01.2020 | ||
PT | 21.06.2020 | ||
Former [2020/36] | RS | 29.01.2020 | |
PT | 21.06.2020 | Documents cited: | Search | [XA]GB409318 (JAMES HENRY BENNETTS) [X] 1,8,11,12 * page 1, line 12 - line 53 * * page 4, line 120 - page 5, line 125; figures 2,4 * [A] 13; | [X]DE1096583 (URSULA REUSS GEB KEILOWEIT) [X] 1,6,7 * column 2, line 27 - line 45; figure 1 *; | [X]US3615110 (FUGATE JAMES E) [X] 1-4 * column 2, line 17 - line 40; figures 2,3 *; | [A]DE2219185 (FRICKER FRIMEDA METALL DRAHT) [A] 1,8-10,14,15 * the whole document *; | [X]US6213679 (FROBOSILO RAYMOND C [US], et al) [X] 1,5 * column 2, line 35 - line 49; figures 1,4 *; | [A]US2011076110 (BURKE JOHN THOMAS [AU], et al) [A] 1,8,9,11,14,15 * the whole document *; | [I]US2012167517 (RUIZ ANTONIO REYES [US], et al) [I] 1,2,4,5,7 * paragraphs [0023] - [0031]; figure 1 *; | [A]US2014020321 (EKLUND WESLEY K [US], et al) [A] 1,8,11,12* paragraphs [0032] - [0046]; figures 1-6 * | by applicant | DE2623803 |