blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3144436

EP3144436 - METHOD AND ASSEMBLY FOR OPERATING A SANITARY DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.04.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  08.05.2020
FormerGrant of patent is intended
Status updated on  07.04.2020
FormerExamination is in progress
Status updated on  07.06.2019
FormerRequest for examination was made
Status updated on  17.11.2017
FormerThe application has been published
Status updated on  17.02.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Grohe AG
58675 Hemer / DE
[2017/12]
Inventor(s)01 / Schönbeck, Heiko
Friedrich-Grohe-Straße 20a
58675 Hemer / DE
02 / Mielke, Achim
Untere Bult 17
32457 Porta Westfalica / DE
 [2017/12]
Application number, filing date16001893.330.08.2016
[2017/12]
Priority number, dateDE2015101138604.09.2015         Original published format: DE102015011386
[2017/12]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3144436
Date:22.03.2017
Language:DE
[2017/12]
Type: B1 Patent specification 
No.:EP3144436
Date:10.06.2020
Language:DE
[2020/24]
Search report(s)(Supplementary) European search report - dispatched on:EP17.02.2017
ClassificationIPC:E03D5/10, E03C1/05
[2017/12]
CPC:
A47K3/281 (EP,US); G05B15/02 (US); E03C1/057 (EP,US);
E03C1/18 (US); E03D13/005 (US); E03D5/105 (EP,US);
E03D9/00 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/51]
Former [2017/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND ANORDNUNG ZUM BETRIEB EINER SANITÄREINRICHTUNG[2017/12]
English:METHOD AND ASSEMBLY FOR OPERATING A SANITARY DEVICE[2017/12]
French:PROCEDE ET SYSTEME DE FONCTIONNEMENT D'UN DISPOSITIF SANITAIRE[2017/12]
Examination procedure30.08.2016Date on which the examining division has become responsible
22.09.2017Amendment by applicant (claims and/or description)
22.09.2017Examination requested  [2017/51]
13.06.2019Despatch of a communication from the examining division (Time limit: M06)
19.12.2019Reply to a communication from the examining division
08.04.2020Communication of intention to grant the patent
29.04.2020Fee for grant paid
29.04.2020Fee for publishing/printing paid
29.04.2020Receipt of the translation of the claim(s)
Opposition(s)11.03.2021No opposition filed within time limit [2021/20]
Fees paidRenewal fee
28.08.2018Renewal fee patent year 03
26.08.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.08.2016
AL10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
MK10.06.2020
MT10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
TR10.06.2020
IE30.08.2020
LU30.08.2020
BE31.08.2020
BG10.09.2020
GB10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
[2022/32]
Former [2022/27]HU30.08.2016
AL10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
MT10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
TR10.06.2020
IE30.08.2020
LU30.08.2020
BE31.08.2020
BG10.09.2020
GB10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/38]AL10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
IE30.08.2020
LU30.08.2020
BE31.08.2020
BG10.09.2020
GB10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/37]AL10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
IE30.08.2020
LU30.08.2020
BE31.08.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/36]AL10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
LU30.08.2020
BE31.08.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/24]AL10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
LU30.08.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/20]AL10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
LU30.08.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/18]AL10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/10]AL10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/09]AL10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
PT12.10.2020
Former [2021/04]AL10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
RS10.06.2020
SE10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
Former [2021/01]HR10.06.2020
LT10.06.2020
LV10.06.2020
RS10.06.2020
SE10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
Former [2020/51]HR10.06.2020
LT10.06.2020
LV10.06.2020
RS10.06.2020
SE10.06.2020
NO10.09.2020
GR11.09.2020
Former [2020/50]HR10.06.2020
LT10.06.2020
LV10.06.2020
SE10.06.2020
NO10.09.2020
GR11.09.2020
Former [2020/49]LT10.06.2020
SE10.06.2020
NO10.09.2020
Former [2020/47]LT10.06.2020
NO10.09.2020
Documents cited:Search[XI]WO9904283  (KOHLER CO [US], et al) [X] 1-5,8,9,11 * figure 12B * [I] 6,7,10;
 [X]DE20014027U  (GEBERIT TECHNIK AG [CH]) [X] 1,2,4,6,8,11* the whole document *;
 [X]US2015020299  (HSU CHING-YEN [TW]) [X] 1,2,4,6-8,11 * paragraphs [0025] , [0033] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.