EP3047953 - METHOD FOR MAKING A STRUCTURAL COMPONENT FOR MOTOR VEHICLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 21.02.2020 | ||
Former | Grant of patent is intended Status updated on 13.11.2019 | ||
Former | Examination is in progress Status updated on 19.01.2018 | ||
Former | Request for examination was made Status updated on 03.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Brose Fahrzeugteile SE & Co. Kommanditgesellschaft, Bamberg Berliner Ring 1 96052 Bamberg / DE | [N/P] |
Former [2020/15] | For all designated states Brose Fahrzeugteile SE & Co. Kommanditgesellschaft, Bamberg Berliner Ring 1 96052 Bambert / DE | ||
Former [2016/31] | For all designated states Brose Fahrzeugteile GmbH & Co. Kommanditgesellschaft, Bamberg Berliner Ring 1 96052 Bamberg / DE | ||
Former [2016/30] | For all designated states Brose Fahrzeugteile GmbH & Co. KG, Hallstadt Max-Brose-Strasse 2 96103 Hallstadt / DE | Inventor(s) | 01 /
THIENEL, Michael Am Eichenbühl 33 95340 Thurnau / DE | 02 /
KRIESE, Olaf Ketschendorfer Straße 76 96450 Coburg / DE | 03 /
SCHULTZ, Markus Bielefelder Straße 36a 90425 Nürnberg / DE | 04 /
STAMMBERGER, Werner Buscheller 22 96271 Grub am Forst / DE | 05 /
NERB, Stephan Johann-Langhans-Straße 3 97475 Zeil am Main / DE | [2016/30] | Representative(s) | Maikowski & Ninnemann Patentanwälte Partnerschaft mbB Postfach 15 09 20 10671 Berlin / DE | [2016/30] | Application number, filing date | 16150277.8 | 11.07.2014 | [2016/30] | Priority number, date | DE201310213711 | 12.07.2013 Original published format: DE102013213711 | [2016/30] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3047953 | Date: | 27.07.2016 | Language: | DE | [2016/30] | Type: | B1 Patent specification | No.: | EP3047953 | Date: | 25.03.2020 | Language: | DE | [2020/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.06.2016 | Classification | IPC: | B29C45/14, B62D25/00, B60J5/00 | [2016/30] | CPC: |
B29C45/14221 (EP,KR,US);
B29C45/1418 (CN);
B29C51/12 (US);
B29B15/14 (CN);
B29C45/14786 (EP,KR,US);
B29C45/7207 (CN);
B29C51/145 (US);
B60J5/0416 (EP,KR,US);
B60J5/045 (CN);
B29C2045/14237 (EP,KR,US);
B29K2077/00 (EP,US);
B29K2105/06 (EP,KR,US);
B29K2105/08 (EP,US);
B29K2105/0872 (EP,KR,US);
B29K2105/256 (EP,US);
B29L2031/3014 (EP,KR,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/10] |
Former [2016/30] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES STRUKTURBAUTEILS FÜR KRAFTFAHRZEUGE | [2016/30] | English: | METHOD FOR MAKING A STRUCTURAL COMPONENT FOR MOTOR VEHICLES | [2016/30] | French: | PROCEDE DE FABRICATION D'UN COMPOSANT STRUCTURAL POUR VEHICULES AUTOMOBILES | [2016/30] | Examination procedure | 06.01.2016 | Date on which the examining division has become responsible | 27.01.2017 | Amendment by applicant (claims and/or description) | 27.01.2017 | Examination requested [2017/10] | 17.01.2018 | Despatch of a communication from the examining division (Time limit: M02) | 20.03.2018 | Reply to a communication from the examining division | 09.04.2019 | Despatch of a communication from the examining division (Time limit: M02) | 18.06.2019 | Reply to a communication from the examining division | 14.11.2019 | Communication of intention to grant the patent | 14.02.2020 | Fee for grant paid | 14.02.2020 | Fee for publishing/printing paid | 14.02.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14750322.1 / EP3019320 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 01.08.2016 | Renewal fee patent year 03 | 31.07.2017 | Renewal fee patent year 04 | 31.07.2018 | Renewal fee patent year 05 | 31.07.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.07.2014 | AL | 25.03.2020 | CY | 25.03.2020 | DK | 25.03.2020 | EE | 25.03.2020 | ES | 25.03.2020 | FI | 25.03.2020 | HR | 25.03.2020 | LT | 25.03.2020 | LV | 25.03.2020 | MC | 25.03.2020 | MK | 25.03.2020 | MT | 25.03.2020 | NL | 25.03.2020 | PL | 25.03.2020 | RO | 25.03.2020 | RS | 25.03.2020 | SI | 25.03.2020 | SM | 25.03.2020 | TR | 25.03.2020 | BG | 25.06.2020 | NO | 25.06.2020 | GR | 26.06.2020 | AT | 11.07.2020 | IE | 11.07.2020 | LU | 11.07.2020 | IS | 25.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | PT | 18.08.2020 | [2022/31] |
Former [2022/30] | HU | 11.07.2014 | |
AL | 25.03.2020 | ||
CY | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
MT | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SI | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
AT | 11.07.2020 | ||
IE | 11.07.2020 | ||
LU | 11.07.2020 | ||
IS | 25.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
PT | 18.08.2020 | ||
Former [2022/27] | HU | 11.07.2014 | |
CY | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
MT | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SI | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
AT | 11.07.2020 | ||
IE | 11.07.2020 | ||
LU | 11.07.2020 | ||
IS | 25.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/47] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SI | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
AT | 11.07.2020 | ||
IE | 11.07.2020 | ||
LU | 11.07.2020 | ||
IS | 25.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/37] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SI | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IE | 11.07.2020 | ||
LU | 11.07.2020 | ||
IS | 25.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/24] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SI | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
LU | 11.07.2020 | ||
IS | 25.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/20] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
LU | 11.07.2020 | ||
IS | 25.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/14] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/08] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/50] | EE | 25.03.2020 | |
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/48] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/47] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/46] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/45] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/39] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/38] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/37] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
NO | 25.06.2020 | ||
Former [2020/35] | FI | 25.03.2020 | |
NO | 25.06.2020 | Documents cited: | Search | [A]DE102010001634 (BROSE FAHRZEUGTEILE [DE]) [A] 1-15* Abstract, Fig.1 *; | [XI]DE102011111232 (GM GLOBAL TECH OPERATIONS INC [US]) [X] 1-4 * Bezugszahlen 19-22, Fig.5; Anpsruch 7 * [I] 5-11,13-15; | [A]WO2013053487 (OECHSLER AG [DE]) [A] 1-15 * abstract * | by applicant | DE202006019341U | DE102010001634 | DE102011111232 | - "Das Zeitalter der Verfahrenskombination beginnt", KUNSTSTOFFE, (201210), pages 44 - 49 | - "Integrative Simulation von Organoblech-Hybridbauteilen", KUNSTSTOFFE, (201209), pages 102 - 106 | - "Mehr Potenzial für Leichtbau", KUNSTSTOFFE, (201203), pages 68 - 70 | - "Hohlkörperverbundstrukturen im Minutentakt", KUNSTSTOFFE, (201103), pages 110 - 114 |