blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3047878

EP3047878 - ASSEMBLY FOR PREVENTING THE SPREAD OF FIRE IN A BUILDING WITH AT LEAST ONE BUILDING WALL MADE OF WOOD BUILDING MATERIALS [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  22.10.2021
Database last updated on 06.07.2024
FormerGrant of patent is intended
Status updated on  26.07.2021
FormerExamination is in progress
Status updated on  09.06.2020
FormerRequest for examination was made
Status updated on  03.02.2017
Most recent event   Tooltip20.06.2024Change - inventorpublished on 24.07.2024 [2024/30]
20.06.2024Change - applicantpublished on 24.07.2024 [2024/30]
Applicant(s)For all designated states
Wildeboer, Jürgen
Marker Weg 17
26826 Weener / DE
[2024/30]
Former [2021/47]For all designated states
Wildeboer, Werner
Marker Weg 13 a
26826 Weener / DE
Former [2016/30]For all designated states
Wildeboer, Werner
Marker Weg 13 a
26826 Weener / DE
Inventor(s)01 / Wildeboer, Werner
26826 Weener / DE
[2024/30]
Former [2016/30]01 / see applicant
...
Representative(s)Ter Meer Steinmeister & Partner
Patentanwälte mbB
Artur-Ladebeck-Strasse 51
33617 Bielefeld / DE
[2021/47]
Former [2016/30]Jabbusch, Matthias
Jabbusch Siekmann & Wasiljeff Patentanwälte Hauptstrasse 85
26131 Oldenburg / DE
Application number, filing date16152778.326.01.2016
[2016/30]
Priority number, dateDE20152000505U26.01.2015         Original published format: DE 202015000505 U
[2016/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3047878
Date:27.07.2016
Language:DE
[2016/30]
Type: B1 Patent specification 
No.:EP3047878
Date:24.11.2021
Language:DE
[2021/47]
Search report(s)(Supplementary) European search report - dispatched on:EP13.05.2016
ClassificationIPC:A62C2/12, F24F13/14, F16L5/04
[2016/30]
CPC:
A62C2/12 (EP); F16L5/04 (EP); F24F13/14 (EP);
F24F11/35 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/10]
Former [2016/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANORDNUNG ZUM VERHINDERN DER AUSBREITUNG EINES BRANDES IN EINEM GEBÄUDE, MIT ZUMINDEST EINER GEBÄUDEWAND AUS HOLZBAUSTOFFEN[2016/30]
English:ASSEMBLY FOR PREVENTING THE SPREAD OF FIRE IN A BUILDING WITH AT LEAST ONE BUILDING WALL MADE OF WOOD BUILDING MATERIALS[2016/30]
French:SYSTEME DESTINE A EMPECHER LA PROPAGATION D'UN INCENDIE DANS UN BATIMENT, COMPRENANT AU MOINS UNE PAROI DE BATIMENT EN BOIS[2016/30]
Examination procedure26.01.2016Date on which the examining division has become responsible
26.01.2017Amendment by applicant (claims and/or description)
26.01.2017Examination requested  [2017/10]
15.06.2020Despatch of a communication from the examining division (Time limit: M04)
06.10.2020Reply to a communication from the examining division
27.07.2021Communication of intention to grant the patent
14.10.2021Fee for grant paid
14.10.2021Fee for publishing/printing paid
14.10.2021Receipt of the translation of the claim(s)
Opposition(s)Opponent(s)01  23.08.2022  25.08.2022  ADMISSIBLE
TROX GmbH
Heinrich-Trox-Platz 1
47506 Neukirchen-Vluyn / DE
Opponent's representative
Dr. Stark & Partner Patentanwälte mbB
Moerser Straße 140
47803 Krefeld / DE
 02  24.08.2022  26.08.2022  ADMISSIBLE
SCHAKO KG
Steigstraße 25-27
78600 Kolbingen / DE
Opponent's representative
Patentanwälte und Rechtsanwalt Weiß, Arat & Partner mbB, et al, et al
Zeppelinstraße 4
78234 Engen / DE
 [2022/40]
Former [2022/39]
Opponent(s)01  23.08.2022  25.08.2022  ADMISSIBLE
TROX GmbH
Heinrich-Trox-Platz 1
47506 Neukirchen-Vluyn / DE
Opponent's representative
Dr. Stark & Partner Patentanwälte mbB
Moerser Straße 140
47803 Krefeld / DE
 02  24.08.2022   
SCHAKO KG
Steigstraße 25-27
78600 Kolbingen / DE
Opponent's representative
Patentanwälte und Rechtsanwalt Weiß, Arat & Partner mbB, et al, et al
Zeppelinstraße 4
78234 Engen / DE
08.09.2022Invitation to proprietor to file observations on the notice of opposition
17.01.2023Reply of patent proprietor to notice(s) of opposition
11.01.2024Date of oral proceedings
06.02.2024Despatch of interlocutory decision in opposition
06.02.2024Despatch of minutes of oral proceedings
Appeal following opposition03.04.2024Appeal received No.  T0382/24
03.04.2024Payment of appeal fee
06.06.2024Statement of grounds filed
06.03.2024Appeal received No.  T0382/24
06.03.2024Payment of appeal fee
22.05.2024Statement of grounds filed
Fees paidRenewal fee
08.01.2018Renewal fee patent year 03
03.01.2019Renewal fee patent year 04
02.01.2020Renewal fee patent year 05
08.01.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.01.2016
AL24.11.2021
CY24.11.2021
EE24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
MK24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
IE26.01.2022
LU26.01.2022
FR31.01.2022
BG24.02.2022
GB24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
[2024/22]
Former [2024/20]HU26.01.2016
AL24.11.2021
CY24.11.2021
EE24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
IE26.01.2022
LU26.01.2022
FR31.01.2022
BG24.02.2022
GB24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2024/18]HU26.01.2016
AL24.11.2021
EE24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
IE26.01.2022
LU26.01.2022
FR31.01.2022
BG24.02.2022
GB24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2023/27]AL24.11.2021
EE24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
IE26.01.2022
LU26.01.2022
FR31.01.2022
BG24.02.2022
GB24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2023/08]AL24.11.2021
EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
IE26.01.2022
LU26.01.2022
FR31.01.2022
BG24.02.2022
GB24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2023/01]AL24.11.2021
EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
LU26.01.2022
FR31.01.2022
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/50]AL24.11.2021
EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SK24.11.2021
SM24.11.2021
LU26.01.2022
FR31.01.2022
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/49]AL24.11.2021
EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SK24.11.2021
SM24.11.2021
LU26.01.2022
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/46]EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SK24.11.2021
SM24.11.2021
LU26.01.2022
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/39]EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/35]EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/34]EE24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SM24.11.2021
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/33]HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
SM24.11.2021
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/24]HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
BG24.02.2022
GR25.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/23]HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
BG24.02.2022
PT24.03.2022
Former [2022/22]LT24.11.2021
RS24.11.2021
BG24.02.2022
Former [2022/21]RS24.11.2021
BG24.02.2022
Former [2022/19]BG24.02.2022
Documents cited:Search[YA]DE19714625  (CAPE BOARDS DEUTSCHLAND GMBH [DE]) [Y] 6,8,9 * column 1, line 53 - column 4, line 31 * * figure 1 * [A] 1-5,10-13;
 [YA]DE10033306  (KAMLEITHNER MALY UTA [AT]) [Y] 7 * column 5, lines 5-17 * * column 6, lines 33-55 * * column 8, lines 13-22 * * column 13, line 58 - column 14, line 68 * * figure 8 * [A] 1-6,8-13;
 [XY]AU2004203153  (HOLYOAKE INDUSTRIES LTD [NZ]) [X] 1,4,5,10,12,13 * page 1, lines 3-7 * * page 6, line 13 - page 7, line 26 * * page 8, lines 16-19 * * page 9, lines 2-24 * * page 10, line 24 - page 17, line 24 * * page 18, line 14 - page 21, line 19 * * figures 1a, 1b, 2b * [Y] 2,3,6-9,11;
 [YA]DE202007013237U  (STOCKER KAMINSYSTEME H STOCKER [AT]) [Y] 2,3,11 * paragraph [0001] * * paragraphs [0007] - [0016] * * paragraphs [0021] - [0025] * * figures 1, 2 * [A] 1,4-10,12,13;
 [A]DE102007010682  (WILDEBOER WERNER [DE]) [A] 1-13 * paragraph [0001] * * paragraphs [0012] - [0014] * * paragraphs [0029] - [0031] ** figures 1, 2, 3a, 3b, 5a, 5b *
OppositionAU2004203153
 DE102007010682
    - Anonymous, "Brandschutzklappe Serie FK-EU Montage-und Betriebsanleitung", Trox GmbH, (20141020), pages 1 - 84, XP055963917
    - Anonymous, "Muster-Richtlinie über brandschutztechnische Anforderungen an hochfeuerhemmende Bauteile in Holzbauweise - M-HFHHolzR (Fassung Juli 2004)1", DIBt Mitteilungen, (20040501), pages 161 - 168, XP055963933
    - Wichtermann, Karl-Heinz, "4.9.7.2 Brandschutz für Lüftungsleitungen // 4.9.7.3 Brandschutzklappe", Praxis der Gebäude- Energieberatung EnEV 2009; Reihe: Technik & Wirtschaft, Deiningen, Druckerei + Verlag Steinmeier, (20090101), pages 194 - 197, ISBN 978-3-87082-101-2, XP009552611
    - Reske, Matina ; Wildeboer, Jürgen ; Wildeboer, Werner, "Einbau", Brandschutzklappen : Konstruktion, Einbau, Verwendung, DE, [München] : Verl. Moderne Industrie, 2012, (20120101), pages 28 - 32, ISBN 978-3-86236-044-4, XP009552607
    - Wichtermann, Karl-Heinz, "4.9.7.2 Brandschutz für Lüftungsleitungen // 4.9.7.3 Brandschutzklappe", Wichtermann, Karl-Heinz, Dr. Karl-Heinz Wichtermann, Praxis der Gebäude- Energieberatung EnEV 2009; Reihe: Technik & Wirtschaft, Deiningen, Druckerei + Verlag Steinmeier, (20090101), pages 194 - 197, ISBN 978-3-87082-101-2, XP009552611
    - Dirk Bohne, "1.2 Trassen-und Leitungsführung", Dirk Bohne, Dirk Bohne, Technischer Ausbau von Gebäuden, 10. Auflage, Springer Vieweg, (20140101), pages 5 - 28, doi:10.1007/978-3-8348-2253-6, ISBN 978-3-8348-1832-4, XP009552612

DOI:   http://dx.doi.org/10.1007/978-3-8348-2253-6
    - "7.3 Holzskelettbau", Dietrich Neumann, Ulrich Weinbrenner, Ulf Hestermann, Ludwig Rongen, Frick/Knöll Baukonstruktionslehre 1, 34. Auflage, B.G. Teubner Verlag / GWV Fachverlage GmbH, Wiesbaden , (2006), pages 229 - 229, ISBN 3-8351-0001-7, XP009552610

DOI:   http://dx.doi.org/10.1007/978-3-8351-9121-1_7
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.