blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3051066

EP3051066 - CASTING CORE WITH STAGGERED EXTENSIONS [Right-click to bookmark this link]
Former [2016/31]STAGGERD CASTING CORE EXTENSIONS
[2021/01]
StatusNo opposition filed within time limit
Status updated on  25.03.2022
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  16.04.2021
FormerGrant of patent is intended
Status updated on  10.12.2020
FormerExamination is in progress
Status updated on  21.07.2017
FormerRequest for examination was made
Status updated on  10.02.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2021/12]
Former [2016/43]For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Former [2016/31]For all designated states
United Technologies Corporation
10 Farm Springs Rd.
Farmington, CT 06032 / US
Inventor(s)01 / KING, Christopher
14 Robin Street
Bristol, CT 06010 / US
 [2016/31]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2021/20]
Former [2016/31]Bridge, Kerry Ann
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date16153175.128.01.2016
[2016/31]
Priority number, dateUS20151460967730.01.2015         Original published format: US201514609677
[2016/31]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3051066
Date:03.08.2016
Language:EN
[2016/31]
Type: B1 Patent specification 
No.:EP3051066
Date:19.05.2021
Language:EN
[2021/20]
Search report(s)(Supplementary) European search report - dispatched on:EP06.06.2016
ClassificationIPC:B22D25/02, B22C9/10, F01D5/18
[2020/46]
CPC:
F01D5/186 (EP,US); B22C9/10 (EP,US); B22D25/02 (EP,US);
B23H9/14 (US); B23K26/382 (US); F01D11/08 (US);
F01D25/12 (US); F01D5/147 (US); F01D9/041 (US);
F02C7/18 (US); F23R3/002 (US); F05D2220/32 (US);
F05D2230/12 (US); F05D2230/13 (US); F05D2230/21 (US);
F05D2230/30 (US); F05D2260/202 (US); Y02T50/60 (EP,US) (-)
Former IPC [2016/31]F01D5/18, B22C9/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/11]
Former [2016/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:GUSSKERN MIT VERSETZTEN FORTSÄTZEN[2016/31]
English:CASTING CORE WITH STAGGERED EXTENSIONS[2021/01]
French:NOYAU DE COULÉE COMPRENANT DES EXTENSIONS DÉCALÉES[2021/01]
Former [2016/31]STAGGERD CASTING CORE EXTENSIONS
Former [2016/31]NOYAU DE COULÉE COMPRENANT DES EXTENSIONS DÉCALÉS
Examination procedure28.01.2016Date on which the examining division has become responsible
02.02.2017Amendment by applicant (claims and/or description)
02.02.2017Examination requested  [2017/11]
21.07.2017Despatch of a communication from the examining division (Time limit: M04)
30.11.2017Reply to a communication from the examining division
15.03.2019Cancellation of oral proceeding that was planned for 19.03.2019
19.03.2019Date of oral proceedings (cancelled)
18.07.2019Despatch of a communication from the examining division (Time limit: M04)
28.11.2019Reply to a communication from the examining division
22.04.2020Despatch of a communication from the examining division (Time limit: M04)
21.08.2020Reply to a communication from the examining division
11.12.2020Communication of intention to grant the patent
09.04.2021Fee for grant paid
09.04.2021Fee for publishing/printing paid
09.04.2021Receipt of the translation of the claim(s)
Opposition(s)22.02.2022No opposition filed within time limit [2022/17]
Fees paidRenewal fee
24.01.2018Renewal fee patent year 03
24.01.2019Renewal fee patent year 04
21.01.2020Renewal fee patent year 05
20.01.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.01.2016
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
MT19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
[2024/41]
Former [2024/22]HU28.01.2016
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2024/20]HU28.01.2016
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2024/18]HU28.01.2016
AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/09]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE28.01.2022
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/03]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU28.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/01]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU28.01.2022
BE31.01.2022
Former [2022/46]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU28.01.2022
Former [2022/39]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/36]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/29]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/26]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/23]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/10]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/09]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/08]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/07]AT19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/04]AT19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/52]AT19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/51]AT19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/50]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
Former [2021/49]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
Former [2021/47]AT19.05.2021
FI19.05.2021
LT19.05.2021
BG19.08.2021
Former [2021/46]AT19.05.2021
FI19.05.2021
LT19.05.2021
Documents cited:Search[XI]US2007044933  (SANTELER KEITH A [US]) [X] 1-3,5-7,9-15 * page 2, paragraph 18 - page 3, paragraph 26; figures 1-4 * [I] 4,8;
 [XI]EP2000232  (UNITED TECHNOLOGIES CORP [US]) [X] 1-3,5-7,9-15 * column 3, paragraph 13 - column 6, paragraph 29; figures 1,2,4 * [I] 4,8;
 [XI]US2014010666  (HUDSON ERIC A [US], et al) [X] 1-3,5-7,9-15 * page 2, paragraph 30 - page 3, paragraph 33; figures 1D,3,4C,5 * [I] 4,8;
 [X]US2009175733  (POON KIN C [US], et al) [X] 1,7,15 * page 2, paragraph 22 - page 3, paragraph 35; figures 3,4 *;
 [X]EP1857199  (UNITED TECHNOLOGIES CORP [US]) [X] 1,7,15 * column 3, paragraph 9 - column 9, paragraph 32; figures 1-3,26 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.