EP3056732 - IMPROVED AIR COMPRESSOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.04.2020 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 10.05.2019 | ||
Former | Grant of patent is intended Status updated on 17.12.2018 | ||
Former | Examination is in progress Status updated on 08.12.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Chou, Wen-San No. 1-25, Kangwei An-Din District Tainan City / TW | [2016/33] | Inventor(s) | 01 /
see applicant ... | [2016/33] | Representative(s) | Lang, Christian LangPatent Anwaltskanzlei IP Law Firm Ingolstädter Straße 5 80807 München / DE | [N/P] |
Former [2019/24] | Lang, Christian LangPatent Anwaltskanzlei Ingolstädter Straße 5 80807 München / DE | ||
Former [2016/33] | Lang, Christian LangPatent Anwaltskanzlei IP Law Firm Rosenheimer Straße 139 81671 München / DE | Application number, filing date | 16154566.0 | 05.02.2016 | [2016/33] | Priority number, date | TW20150105168 | 13.02.2015 Original published format: TW 104105168 | [2016/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3056732 | Date: | 17.08.2016 | Language: | EN | [2016/33] | Type: | B1 Patent specification | No.: | EP3056732 | Date: | 12.06.2019 | Language: | EN | [2019/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.07.2016 | Classification | IPC: | F04B39/12, F04B39/14, F04B35/04 | [2016/33] | CPC: |
F04B35/04 (EP,CN,US);
F04B41/02 (CN);
F04B39/121 (US);
F04B39/0005 (US);
F04B39/10 (CN,US);
F04B39/125 (EP,US);
F04B39/14 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/33] | Title | German: | VERBESSERTER LUFTKOMPRESSOR | [2016/33] | English: | IMPROVED AIR COMPRESSOR | [2016/33] | French: | COMPRESSEUR D'AIR AMÉLIORÉ | [2016/33] | Examination procedure | 06.06.2016 | Examination requested [2016/33] | 17.02.2017 | Amendment by applicant (claims and/or description) | 11.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 11.04.2018 | Reply to a communication from the examining division | 27.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.11.2018 | Reply to a communication from the examining division | 18.12.2018 | Communication of intention to grant the patent | 09.04.2019 | Fee for grant paid | 09.04.2019 | Fee for publishing/printing paid | 29.04.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 13.03.2020 | No opposition filed within time limit [2020/21] | Fees paid | Renewal fee | 28.02.2018 | Renewal fee patent year 03 | 22.02.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 12.06.2019 | CY | 12.06.2019 | EE | 12.06.2019 | ES | 12.06.2019 | FI | 12.06.2019 | HR | 12.06.2019 | LT | 12.06.2019 | LV | 12.06.2019 | MC | 12.06.2019 | MK | 12.06.2019 | MT | 12.06.2019 | RO | 12.06.2019 | RS | 12.06.2019 | SI | 12.06.2019 | SK | 12.06.2019 | SM | 12.06.2019 | BG | 12.09.2019 | NO | 12.09.2019 | GR | 13.09.2019 | IS | 12.10.2019 | PT | 14.10.2019 | IE | 05.02.2020 | LU | 05.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/28] | AL | 12.06.2019 | |
CY | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
MT | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
IE | 05.02.2020 | ||
LU | 05.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
IE | 05.02.2020 | ||
LU | 05.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/52] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
LU | 05.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/50] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
LU | 05.02.2020 | ||
Former [2020/48] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
LU | 05.02.2020 | ||
Former [2020/36] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
Former [2020/24] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/13] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SK | 12.06.2019 | ||
SM | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
Former [2020/12] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SK | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
Former [2020/11] | AL | 12.06.2019 | |
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
SK | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
Former [2020/10] | AL | 12.06.2019 | |
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RO | 12.06.2019 | ||
RS | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
Former [2019/51] | AL | 12.06.2019 | |
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RS | 12.06.2019 | ||
BG | 12.09.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
Former [2019/50] | AL | 12.06.2019 | |
FI | 12.06.2019 | ||
HR | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
RS | 12.06.2019 | ||
NO | 12.09.2019 | ||
GR | 13.09.2019 | ||
Former [2019/47] | FI | 12.06.2019 | |
LT | 12.06.2019 | ||
NO | 12.09.2019 | Documents cited: | Search | [YA]US4854839 (DIFLORA MICHAEL A [US]) [Y] 2-4,6,7 * figures 1-3 * * column 2, line 14 - column 3, line 17 * [A] 1,5,8,9; | [A]GB2407347 (ARCTIC CIRCLE LTD [GB]) [A] 1-9 * figures 1-4 ** page 3, line 18 - page 6, line 6 *; | [A]US2010147416 (CHOU WEN SAN [TW]) [A] 8,9 * figures 2-4 * * paragraph [0036] - paragraph [0046] *; | [IAY]DE202014106233U (CHOU WEN SAN [TW]) [I] 1,8,9 * figures 2-5, 8 * * paragraph [0022] - paragraph [0027] * [A] 5 [Y] 2-4,6,7 | Examination | JPS63202783U |