EP3067717 - SIMULTANEOUS WAVELET EXTRACTION AND DECONVOLUTION PROCESSING IN THE TIME DOMAIN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 22.11.2020 | ||
Former | Examination is in progress Status updated on 17.08.2018 | ||
Former | Request for examination was made Status updated on 24.02.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Saudi Arabian Oil Company 1 Eastern Avenue Dhahran 31311 / SA | [2016/37] | Inventor(s) | 01 /
Al-Dossary, Saleh Prince Mohammad Street Alshati Area, Block 3 Dammam / SA | 02 /
Wang, Jinsong Nasiriyah 737 Dhahran / SA | [2020/52] |
Former [2016/37] | 01 /
Al-Dossary, Saleh Prince Mohammad Street Alshati Area, Block 3 Dammam / SA | ||
02 /
WANG, Jinsong Nasiriyah 737 Dhahran / SA | Representative(s) | Robinson, David Edward Ashdown Marks & Clerk LLP 1 New York Street Manchester M1 4HD / GB | [2016/37] | Application number, filing date | 16158119.4 | 07.03.2012 | [2016/37] | Priority number, date | US201113071695 | 25.03.2011 Original published format: US201113071695 | [2016/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3067717 | Date: | 14.09.2016 | Language: | EN | [2016/37] | Type: | B1 Patent specification | No.: | EP3067717 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.08.2016 | Classification | IPC: | G01V1/28 | [2016/37] | CPC: |
G01V1/28 (EP,US);
G01V1/364 (US);
G01V2210/20 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/13] |
Former [2016/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GLEICHZEITIGE WAVELET-EXTRAKTIONS- UND -DEKONVOLUTIONSVERARBEITUNG IN DER ZEITDOMÄNE | [2016/37] | English: | SIMULTANEOUS WAVELET EXTRACTION AND DECONVOLUTION PROCESSING IN THE TIME DOMAIN | [2016/37] | French: | TRAITEMENT D'EXTRACTION ET DE DÉCONVOLUTION SIMULTANÉES D'ONDELETTES DANS LE DOMAINE TEMPOREL | [2016/37] | Examination procedure | 01.03.2016 | Date on which the examining division has become responsible | 29.12.2016 | Amendment by applicant (claims and/or description) | 21.02.2017 | Examination requested [2017/13] | 15.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 21.12.2018 | Reply to a communication from the examining division | 23.11.2020 | Communication of intention to grant the patent | 30.03.2021 | Fee for grant paid | 30.03.2021 | Fee for publishing/printing paid | 30.03.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12709474.6 / EP2689271 | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 01.03.2016 | Renewal fee patent year 03 | 01.03.2016 | Renewal fee patent year 04 | 01.03.2016 | Renewal fee patent year 05 | 10.03.2017 | Renewal fee patent year 06 | 13.03.2018 | Renewal fee patent year 07 | 13.03.2019 | Renewal fee patent year 08 | 12.03.2020 | Renewal fee patent year 09 | 12.03.2021 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.03.2012 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | BG | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | [2024/22] |
Former [2024/20] | HU | 07.03.2012 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2024/18] | HU | 07.03.2012 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/47] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/36] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/10] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | AT | 05.05.2021 | |
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/04] | AT | 05.05.2021 | |
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/52] | AT | 05.05.2021 | |
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | AT | 05.05.2021 | |
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | Documents cited: | Search | [A]US2010185422 (HOVERSTEN GARY MICHAEL [US]) [A] 1-15 * paragraphs [0006] , [0016] * * paragraph [0029] *; | [A] - BAAN VAN DER M ET AL, "Robust wavelet estimation and blind deconvolution of noisy surface seismics", GEOPHYSICS, SOCIETY OF EXPLORATION GEOPHYSICISTS, US, (20080901), vol. 73, no. 5, doi:10.1190/1.2965028, ISSN 0016-8033, pages V37 - V46, XP001516150 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1190/1.2965028 | [AD] - LABAT C ET AL, "Sparse Blind Deconvolution Accounting for Time-Shift Ambiguity", ACOUSTICS, SPEECH AND SIGNAL PROCESSING, 2006. ICASSP 2006 PROCEEDINGS . 2006 IEEE INTERNATIONAL CONFERENCE ON TOULOUSE, FRANCE 14-19 MAY 2006, PISCATAWAY, NJ, USA,IEEE, PISCATAWAY, NJ, USA, (20060514), ISBN 978-1-4244-0469-8, page III, XP031386740 [AD] 1-15 * the whole document * | [A] - WARREN T WOOD, "Simultaneous deconvolution and wavelet inversion as a global optimization", GEOPHYSICS, SOCIETY OF EXPLORATION GEOPHYSICISTS, US, (19990701), vol. 64, no. 4, ISSN 0016-8033, pages 1108 - 1115, XP007921208 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1190/1.1444617 | [AD] - QIANSHENG CHENG ET AL, "Simultaneous Wavelet Estimation and Deconvolution of Reflection Seismic Signals", IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (19960301), vol. 34, no. 2, ISSN 0196-2892, XP011020686 [AD] 1-15 * the whole document * | by applicant | - "Monte Carlo Methods for Signal Processing", IEEE SIGNAL PROCESSING MAGAZINE, (2005), pages 152 - 169 | - "Simultaneous Wavelet Estimation and Deconvolution of Reflection Seismic Signals", IEEE TRANSACTIONS ON GEOSCIENCES AND REMOTE SENSING, (1996), vol. 34, no. 2, pages 377 - 384 | - LABAT ET AL., "Sparse Blind Deconvolution Accounting for Time Shift Ambiguity", IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH AND SIGNAL PROCESSING, (2006), pages 616 - 619 |