EP3065520 - SINGLE ACTION DIN RAIL LATCH [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.10.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 29.10.2021 | ||
Former | Grant of patent is intended Status updated on 21.06.2021 | ||
Former | Examination is in progress Status updated on 05.07.2019 | ||
Former | Request for examination was made Status updated on 24.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Rockwell Automation Technologies, Inc. 1 Allen-Bradley Drive Mayfield Heights, OH 44124 / US | [2016/36] | Inventor(s) | 01 /
MOLNAR, Nathan J. 3333 Elsmere Drive Shaker Heights, OH Ohio 44120 / US | 02 /
BHAT, Yogesh 1414 SOM Center Road, Apartment 619 Mayfield Heights, OH Ohio 44124 / US | [2016/36] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2016/36] | Application number, filing date | 16158875.1 | 07.03.2016 | [2016/36] | Priority number, date | US201514640537 | 06.03.2015 Original published format: US201514640537 | [2016/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3065520 | Date: | 07.09.2016 | Language: | EN | [2016/36] | Type: | B1 Patent specification | No.: | EP3065520 | Date: | 01.12.2021 | Language: | EN | [2021/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.06.2016 | Classification | IPC: | H05K7/14, H02B1/052 | [2016/36] | CPC: |
H05K7/1474 (EP,US);
H05K7/12 (CN);
H05K5/0017 (US);
H05K5/0026 (US);
H05K5/0221 (US);
H05K7/1401 (CN);
H02B1/0523 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/13] |
Former [2016/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DIN-SCHIENENVERRIEGELUNG MIT EINFACHAKTION | [2016/36] | English: | SINGLE ACTION DIN RAIL LATCH | [2016/36] | French: | VERROUILLAGE DE RAIL DIN À ACTION UNIQUE | [2016/36] | Examination procedure | 07.03.2016 | Date on which the examining division has become responsible | 17.02.2017 | Amendment by applicant (claims and/or description) | 17.02.2017 | Examination requested [2017/13] | 09.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 19.11.2019 | Reply to a communication from the examining division | 06.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.11.2020 | Reply to a communication from the examining division | 22.06.2021 | Communication of intention to grant the patent | 19.10.2021 | Fee for grant paid | 19.10.2021 | Fee for publishing/printing paid | 19.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.09.2022 | No opposition filed within time limit [2022/45] | Fees paid | Renewal fee | 27.03.2018 | Renewal fee patent year 03 | 27.03.2019 | Renewal fee patent year 04 | 20.03.2020 | Renewal fee patent year 05 | 23.03.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.03.2016 | AL | 01.12.2021 | AT | 01.12.2021 | CY | 01.12.2021 | CZ | 01.12.2021 | DK | 01.12.2021 | EE | 01.12.2021 | ES | 01.12.2021 | FI | 01.12.2021 | HR | 01.12.2021 | IT | 01.12.2021 | LT | 01.12.2021 | LV | 01.12.2021 | MC | 01.12.2021 | MK | 01.12.2021 | NL | 01.12.2021 | PL | 01.12.2021 | RO | 01.12.2021 | RS | 01.12.2021 | SE | 01.12.2021 | SI | 01.12.2021 | SK | 01.12.2021 | SM | 01.12.2021 | TR | 01.12.2021 | BG | 01.03.2022 | NO | 01.03.2022 | GR | 02.03.2022 | IE | 07.03.2022 | LU | 07.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | IS | 01.04.2022 | PT | 01.04.2022 | [2024/29] |
Former [2024/22] | HU | 07.03.2016 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
MK | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2024/20] | HU | 07.03.2016 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2024/18] | HU | 07.03.2016 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/27] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/10] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/09] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/08] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IE | 07.03.2022 | ||
LU | 07.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/01] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/49] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/47] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/46] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/42] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/35] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
PT | 01.04.2022 | ||
Former [2022/34] | AT | 01.12.2021 | |
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
PT | 01.04.2022 | ||
Former [2022/33] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/30] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/25] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/24] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/23] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/22] | AT | 01.12.2021 | |
FI | 01.12.2021 | ||
LT | 01.12.2021 | ||
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/21] | AT | 01.12.2021 | |
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/19] | BG | 01.03.2022 | Documents cited: | Search | [A]EP0437124 (HAGER ELECTRO [FR]) [A] 1-15 * the whole document *; | [A]US2008108248 (LIM CHOO-SOO [TH], et al) [A] 1-15* the whole document *; | [I]WO2013054873 (OMRON TATEISI ELECTRONICS CO [JP]) [I] 1-15 * figures 1-5, 9-10, 28-30 * |