blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3067470

EP3067470 - UPRIGHT VIBRATOR AND CONSTRUCTION MACHINE WITH AN UPRIGHT VIBRATOR [Right-click to bookmark this link]
Former [2016/37]VIBRATOR AS AN ATTACHMENT FOR A CONSTRUCTION MACHINE
[2024/36]
StatusThe patent has been granted
Status updated on  06.11.2020
Database last updated on 22.08.2024
FormerGrant of patent is intended
Status updated on  02.07.2020
FormerExamination is in progress
Status updated on  27.07.2018
Most recent event   Tooltip02.08.2024Change - German titlepublished on 04.09.2024 [2024/36]
02.08.2024Change - English titlepublished on 04.09.2024 [2024/36]
02.08.2024Change - French titlepublished on 04.09.2024 [2024/36]
Applicant(s)For all designated states
Liebherr-Werk Nenzing GmbH
Dr.-Hans-Liebherr-Strasse 1
6710 Nenzing / AT
[2016/37]
Inventor(s)01 / Schweizer, Steffen
Schillerstr. 26
6700 Bludenz / AT
02 / Holland-Cunz, Oliver
Veltlinerweg 16a
6780 Schruns / AT
 [2016/37]
Representative(s)Laufhütte, Dieter
Lorenz Seidler Gossel
Rechtsanwälte Patentanwälte
Partnerschaft mbB
Widenmayerstraße 23
80538 München / DE
[2016/37]
Application number, filing date16159103.708.03.2016
[2016/37]
Priority number, dateDE20152001862U10.03.2015         Original published format: DE 202015001862 U
[2016/37]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3067470
Date:14.09.2016
Language:DE
[2016/37]
Type: B1 Patent specification 
No.:EP3067470
Date:09.12.2020
Language:DE
[2020/50]
Search report(s)(Supplementary) European search report - dispatched on:EP20.06.2016
ClassificationIPC:E02D3/074
[2020/30]
CPC:
E02D7/18 (EP); E02D11/00 (EP); E02D3/074 (EP);
E02D7/16 (EP)
Former IPC [2016/37]E02D7/18, E02D7/16, E02D11/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/37]
TitleGerman:HOCHKANTRÜTTLER UND BAUMASCHINE MIT EINEM HOCHKANTRÜTTLER[2024/36]
English:UPRIGHT VIBRATOR AND CONSTRUCTION MACHINE WITH AN UPRIGHT VIBRATOR[2024/36]
French:VIBREUR VERTICAL ET MACHINE DE CONSTRUCTION AVEC UN VIBREUR VERTICAL[2024/36]
Former [2016/37]RÜTTLER ALS ANBAUGERÄT FÜR EINE BAUMASCHINE
Former [2016/37]VIBRATOR AS AN ATTACHMENT FOR A CONSTRUCTION MACHINE
Former [2016/37]VIBRATEUR COMME ACCESSOIRE D'ENGIN DE CHANTIER
Examination procedure18.07.2016Amendment by applicant (claims and/or description)
18.07.2016Examination requested  [2016/37]
27.07.2018Despatch of a communication from the examining division (Time limit: M04)
15.11.2018Reply to a communication from the examining division
26.08.2019Despatch of a communication from the examining division (Time limit: M04)
06.11.2019Reply to a communication from the examining division
03.07.2020Communication of intention to grant the patent
30.10.2020Fee for grant paid
30.10.2020Fee for publishing/printing paid
30.10.2020Receipt of the translation of the claim(s)
Opposition(s)Opponent(s)01  30.07.2021  03.08.2021  ADMISSIBLE
ABI Anlagentechnik-Baumaschinen-Industriebedarf Maschinenfabrik und Vertriebsgesellschaft mbH
Am Knückel 4
63843 Niedernberg / DE
Opponent's representative
Patentanwälte Dörner & Kötter PartG mbB
Körnerstrasse 27
58095 Hagen / DE
 [2021/36]
21.09.2021Invitation to proprietor to file observations on the notice of opposition
21.01.2022Reply of patent proprietor to notice(s) of opposition
24.11.2022Cancellation of oral proceeding that was planned for 08.02.2023
08.02.2023Date of oral proceedings
28.11.2023Legal effect of interlocutory decision in opposition
28.11.2023Date of oral proceedings
20.03.2024Despatch of interlocutory decision in opposition
20.03.2024Despatch of minutes of oral proceedings
01.08.2024Despatch of communication that the patent will be maintained as amended
Fees paidRenewal fee
19.03.2018Renewal fee patent year 03
22.03.2019Renewal fee patent year 04
22.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.03.2016
AL09.12.2020
CY09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
MK09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
TR09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
IS09.04.2021
PT09.04.2021
[2024/29]
Former [2024/22]HU08.03.2016
AL09.12.2020
CY09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
MK09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
IS09.04.2021
PT09.04.2021
Former [2023/30]HU08.03.2016
AL09.12.2020
CY09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
IS09.04.2021
PT09.04.2021
Former [2023/27]HU08.03.2016
AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
IS09.04.2021
PT09.04.2021
Former [2022/34]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
IS09.04.2021
PT09.04.2021
Former [2022/23]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
CH31.03.2021
LI31.03.2021
IS09.04.2021
PT09.04.2021
Former [2022/10]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
CH31.03.2021
LI31.03.2021
PT09.04.2021
IS22.12.2021
Former [2022/09]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
LU08.03.2021
BG09.03.2021
GB09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2022/07]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
IE08.03.2021
BG09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2021/51]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
ES09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2021/49]AL09.12.2020
CZ09.12.2020
DK09.12.2020
EE09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SI09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2021/48]AL09.12.2020
CZ09.12.2020
EE09.12.2020
FI09.12.2020
HR09.12.2020
IT09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2021/45]AL09.12.2020
CZ09.12.2020
EE09.12.2020
FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
MC09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2021/42]CZ09.12.2020
EE09.12.2020
FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
IS09.04.2021
PT09.04.2021
Former [2021/39]CZ09.12.2020
EE09.12.2020
FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
PL09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
PT09.04.2021
Former [2021/36]CZ09.12.2020
EE09.12.2020
FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
PT09.04.2021
Former [2021/35]CZ09.12.2020
FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
RO09.12.2020
RS09.12.2020
SE09.12.2020
SK09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
PT09.04.2021
Former [2021/34]CZ09.12.2020
FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
RS09.12.2020
SE09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
PT09.04.2021
Former [2021/33]FI09.12.2020
HR09.12.2020
LT09.12.2020
LV09.12.2020
RS09.12.2020
SE09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
PT09.04.2021
Former [2021/32]FI09.12.2020
HR09.12.2020
LV09.12.2020
RS09.12.2020
SE09.12.2020
SM09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
Former [2021/28]FI09.12.2020
HR09.12.2020
LV09.12.2020
RS09.12.2020
SE09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
Former [2021/23]FI09.12.2020
LV09.12.2020
RS09.12.2020
SE09.12.2020
BG09.03.2021
NO09.03.2021
GR10.03.2021
Former [2021/22]FI09.12.2020
RS09.12.2020
NO09.03.2021
Former [2021/20]FI09.12.2020
Documents cited:Search[A]EP2444553  (ANLAGENTECH BAUMASCH IND [DE])
ExaminationDE8507086U
 US7080958
 US2011008111
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.