EP3220223 - METHOD FOR MACHINING A WORKPIECE IN A MACHINE TOOL WITH OPTIMIZED PROCESSING TIME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.05.2022 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 11.06.2021 | ||
Former | Grant of patent is intended Status updated on 18.03.2021 | ||
Former | Request for examination was made Status updated on 23.03.2018 | ||
Former | The application has been published Status updated on 18.08.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | [2017/38] | Inventor(s) | 01 /
Pitz, Thomas Schillerstraße 16 71263 Weil der Stadt / DE | 02 /
Spielmann, Ralf Robert-Leicht-Str. 157A 70569 Stuttgart / DE | [2017/38] | Application number, filing date | 16160679.3 | 16.03.2016 | [2017/38] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3220223 | Date: | 20.09.2017 | Language: | DE | [2017/38] | Type: | B1 Patent specification | No.: | EP3220223 | Date: | 14.07.2021 | Language: | DE | [2021/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.08.2016 | Classification | IPC: | G05B19/4093 | [2017/38] | CPC: |
G05B19/40937 (EP,US);
G05B19/4155 (CN);
G05B19/21 (US);
G05B13/021 (US);
G05B2219/31443 (CN);
G05B2219/36068 (EP,US);
G05B2219/36252 (EP,US);
G05B2219/36289 (EP,US);
G05B2219/37582 (US);
G05B2219/49365 (EP);
G05B2219/49369 (EP,US);
G05B2219/49375 (EP,US);
Y02P90/02 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/17] |
Former [2017/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR BEARBEITUNG EINES WERKSTÜCKS IN EINER WERKZEUGMASCHINE MIT OPTIMIERTER BEARBEITUNGSZEIT | [2017/38] | English: | METHOD FOR MACHINING A WORKPIECE IN A MACHINE TOOL WITH OPTIMIZED PROCESSING TIME | [2017/38] | French: | PROCEDE D'USINAGE D'UNE PIECE A USINER SUR UNE MACHINE D'USINAGE AVEC TEMPS D'USINAGE OPTIMISE | [2017/38] | Examination procedure | 16.03.2016 | Date on which the examining division has become responsible | 15.03.2018 | Amendment by applicant (claims and/or description) | 19.03.2018 | Examination requested [2018/17] | 19.03.2021 | Communication of intention to grant the patent | 04.06.2021 | Receipt of the translation of the claim(s) | 07.06.2021 | Fee for grant paid | 07.06.2021 | Fee for publishing/printing paid | Opposition(s) | 19.04.2022 | No opposition filed within time limit [2022/25] | Fees paid | Renewal fee | 19.03.2018 | Renewal fee patent year 03 | 19.03.2019 | Renewal fee patent year 04 | 19.03.2020 | Renewal fee patent year 05 | 19.03.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.03.2016 | AL | 14.07.2021 | CY | 14.07.2021 | CZ | 14.07.2021 | DK | 14.07.2021 | EE | 14.07.2021 | ES | 14.07.2021 | FI | 14.07.2021 | HR | 14.07.2021 | LT | 14.07.2021 | LV | 14.07.2021 | MC | 14.07.2021 | MK | 14.07.2021 | NL | 14.07.2021 | PL | 14.07.2021 | RO | 14.07.2021 | RS | 14.07.2021 | SE | 14.07.2021 | SI | 14.07.2021 | SK | 14.07.2021 | SM | 14.07.2021 | TR | 14.07.2021 | BG | 14.10.2021 | NO | 14.10.2021 | GR | 15.10.2021 | IS | 14.11.2021 | PT | 15.11.2021 | AT | 16.03.2022 | GB | 16.03.2022 | IE | 16.03.2022 | LU | 16.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | [2024/29] |
Former [2024/22] | HU | 16.03.2016 | |
AL | 14.07.2021 | ||
CY | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
MK | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 16.03.2022 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | HU | 16.03.2016 | |
AL | 14.07.2021 | ||
CY | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 16.03.2022 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/18] | HU | 16.03.2016 | |
AL | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 16.03.2022 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/35] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 16.03.2022 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 16.03.2022 | ||
IE | 16.03.2022 | ||
LU | 16.03.2022 | ||
Former [2022/47] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/29] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/25] | CZ | 14.07.2021 | |
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/24] | CZ | 14.07.2021 | |
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SK | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/21] | DK | 14.07.2021 | |
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/11] | ES | 14.07.2021 | |
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/09] | ES | 14.07.2021 | |
FI | 14.07.2021 | ||
LT | 14.07.2021 | ||
NL | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
PT | 15.11.2021 | ||
Former [2022/08] | ES | 14.07.2021 | |
FI | 14.07.2021 | ||
LT | 14.07.2021 | ||
NL | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
Former [2022/07] | LT | 14.07.2021 | |
NL | 14.07.2021 | ||
NO | 14.10.2021 | Documents cited: | Search | [A]US2003163208 (SUGIYAMA TETSUYA [JP], et al) [A] 1-13* paragraphs [0158] - [0173]; figures 4, 11A-C *; | [A]US2010114359 (KOMMAREDDY SURYA [US], et al) [A] 1-13 * paragraphs [0004] , [0011] , [0 35] - [0043] - [0046] - [0051]; figures 1,4 *; | [A]US2015039122 (BARAKCHI FARD MOHAMMAD JAVAD [CA], et al) [A] 1-13 * paragraphs [0001] , [0007] - [0009] - [0068] - [0081]; figures 5,6,8 * |