EP3085843 - DEVICE AND METHOD FOR HEAT DECOUPLING OF CONCRETED PARTS OF BUILDINGS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 26.06.2020 | ||
Former | Grant of patent is intended Status updated on 02.04.2020 | ||
Former | Examination is in progress Status updated on 21.07.2017 | ||
Former | Request for examination was made Status updated on 23.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states SCHÖCK BAUTEILE GmbH Vimbucher Strasse 2 76534 Baden-Baden / DE | [2016/43] | Inventor(s) | 01 /
* * * | 02 /
* * * | [2016/43] | Representative(s) | LBP Lemcke, Brommer & Partner Patentanwälte mbB Siegfried-Kühn-Straße 4 76135 Karlsruhe / DE | [N/P] |
Former [2020/31] | Lemcke, Brommer & Partner Patentanwälte Partnerschaft mbB Siegfried-Kühn-Straße 4 76135 Karlsruhe / DE | ||
Former [2016/43] | Lemcke, Brommer & Partner Patentanwälte Partnerschaft mbB Bismarckstraße 16 76133 Karlsruhe / DE | Application number, filing date | 16164252.5 | 07.04.2016 | [2016/43] | Priority number, date | DE201510106296 | 23.04.2015 Original published format: DE102015106296 | [2016/43] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3085843 | Date: | 26.10.2016 | Language: | DE | [2016/43] | Type: | B1 Patent specification | No.: | EP3085843 | Date: | 29.07.2020 | Language: | DE | [2020/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.09.2016 | Classification | IPC: | E04B1/16, E04B1/78, // E04C3/34, E04C5/06, E04B1/76 | [2020/16] | CPC: |
E04B1/165 (EP,US);
E04B1/41 (US);
E04B1/76 (US);
E04B1/78 (EP,US);
E04C5/06 (US);
E04B2001/7679 (EP,US);
|
Former IPC [2016/43] | E04B1/16, E04B1/78, // E04C3/34, E04C5/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/04] |
Former [2016/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR WÄRMEENTKOPPLUNG VON BETONIERTEN GEBÄUDETEILEN | [2016/43] | English: | DEVICE AND METHOD FOR HEAT DECOUPLING OF CONCRETED PARTS OF BUILDINGS | [2016/43] | French: | DISPOSITIF ET PROCÉDÉ DE COUPLAGE THERMIQUE DE PARTIES BETONNÉES DE BÂTIMENT | [2016/43] | Examination procedure | 07.04.2016 | Date on which the examining division has become responsible | 14.12.2016 | Amendment by applicant (claims and/or description) | 14.12.2016 | Examination requested [2017/04] | 21.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 30.10.2017 | Reply to a communication from the examining division | 03.04.2020 | Communication of intention to grant the patent | 23.06.2020 | Fee for grant paid | 23.06.2020 | Fee for publishing/printing paid | 23.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 18.04.2018 | Renewal fee patent year 03 | 10.04.2019 | Renewal fee patent year 04 | 19.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 29.07.2020 | CY | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | GR | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | MT | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | TR | 29.07.2020 | BG | 29.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | IE | 07.04.2021 | LU | 07.04.2021 | [2024/41] |
Former [2024/29] | AL | 29.07.2020 | |
CY | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
GR | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
TR | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 07.04.2021 | ||
LU | 07.04.2021 | ||
Former [2024/22] | AL | 29.07.2020 | |
CY | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
GR | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 07.04.2021 | ||
LU | 07.04.2021 | ||
Former [2023/36] | AL | 29.07.2020 | |
CY | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
GR | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 07.04.2021 | ||
LU | 07.04.2021 | ||
Former [2023/30] | AL | 29.07.2020 | |
CY | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 07.04.2021 | ||
LU | 07.04.2021 | ||
Former [2022/23] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 07.04.2021 | ||
LU | 07.04.2021 | ||
Former [2022/21] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
PT | 30.11.2020 | ||
IE | 07.04.2021 | ||
LU | 07.04.2021 | ||
Former [2022/10] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
PT | 30.11.2020 | ||
LU | 07.04.2021 | ||
Former [2022/04] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
LU | 07.04.2021 | ||
Former [2021/50] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/36] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/28] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/25] | AL | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/22] | DK | 29.07.2020 | |
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/20] | DK | 29.07.2020 | |
ES | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/10] | ES | 29.07.2020 | |
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/09] | ES | 29.07.2020 | |
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/07] | LT | 29.07.2020 | Documents cited: | Search | [XI]DE3105489 (BAUMGAERTNER JUERGEN) [X] 1-3 * page 3, line 5 - page 5, line 16; figures 1-4 * [I] 4,5; | [X]EP0745733 (SFS HANDELS HOLDING AG [CH]) [X] 1,2,6-8 * column 3, line 6 - column 8, line 25; figures 1-7 *; | [A]DE102005001270 (TU NENG-I [TW]) [A] 1-15* paragraph [0005] - paragraph [0024]; figures 1,5,6 *; | [XDI]EP2405065 (KOCH GEORG [DE]) [XD] 1,2,6,7,11,12,14 * paragraph [0009] - paragraph [0041]; figures 5-8 * [I] 3,13 | by applicant | DE10106222 | EP2405065 |