blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3232528

EP3232528 - METHOD FOR NOTIFICATION OF CONSUMER LOAD IN ELECTRICAL POWER NETWORKS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.05.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  19.06.2020
FormerGrant of patent is intended
Status updated on  19.02.2020
FormerExamination is in progress
Status updated on  16.02.2018
FormerRequest for examination was made
Status updated on  15.09.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
[2017/42]
Inventor(s)01 / HUBER, Michael
Weinbergstraße 14c
67434 Neustadt a.d.W. / DE
 [2017/42]
Representative(s)Braun-Dullaeus Pannen Emmerling Patent- & Rechtsanwaltspartnerschaft mbB
Platz der Ideen 2
40476 Düsseldorf / DE
[2020/30]
Former [2017/42]Braun-Dullaeus Pannen Patent- und Rechtsanwälte
Platz der Ideen 2
40476 Düsseldorf / DE
Application number, filing date16164878.712.04.2016
[2017/42]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3232528
Date:18.10.2017
Language:DE
[2017/42]
Type: B1 Patent specification 
No.:EP3232528
Date:22.07.2020
Language:DE
[2020/30]
Search report(s)(Supplementary) European search report - dispatched on:EP23.09.2016
ClassificationIPC:H02J3/14
[2017/42]
CPC:
H02J3/14 (EP,US); H02J2310/14 (EP); Y02B70/30 (EP);
Y02B70/3225 (EP); Y04S20/222 (EP); Y04S20/242 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/42]
TitleGerman:VERFAHREN ZUR ANMELDUNG DER VERBRAUCHERLAST IN STROMNETZWERKEN[2017/42]
English:METHOD FOR NOTIFICATION OF CONSUMER LOAD IN ELECTRICAL POWER NETWORKS[2017/42]
French:PROCÉDÉ DE COMMUNICATION DE LA CHARGE DE CONSOMMATION DANS DES RÉSEAUX ÉLÉCTRIQUES[2017/42]
Examination procedure12.04.2016Date on which the examining division has become responsible
20.07.2017Amendment by applicant (claims and/or description)
20.07.2017Examination requested  [2017/42]
14.02.2018Despatch of a communication from the examining division (Time limit: M04)
25.06.2018Reply to a communication from the examining division
08.11.2018Despatch of a communication from the examining division (Time limit: M04)
18.03.2019Reply to a communication from the examining division
09.01.2020Cancellation of oral proceeding that was planned for 16.01.2020
16.01.2020Date of oral proceedings (cancelled)
20.02.2020Communication of intention to grant the patent
12.06.2020Fee for grant paid
12.06.2020Fee for publishing/printing paid
12.06.2020Receipt of the translation of the claim(s)
Opposition(s)23.04.2021No opposition filed within time limit [2021/26]
Fees paidRenewal fee
26.04.2018Renewal fee patent year 03
30.04.2019Renewal fee patent year 04
20.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.04.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MK22.07.2020
MT22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
AT12.04.2021
IE12.04.2021
LU12.04.2021
[2024/41]
Former [2024/29]HU12.04.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MK22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
AT12.04.2021
IE12.04.2021
LU12.04.2021
Former [2024/22]HU12.04.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MK22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
AT12.04.2021
IE12.04.2021
LU12.04.2021
Former [2023/30]HU12.04.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
AT12.04.2021
IE12.04.2021
LU12.04.2021
Former [2023/29]HU12.04.2016
AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
AT12.04.2021
IE12.04.2021
LU12.04.2021
Former [2022/37]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
AT12.04.2021
IE12.04.2021
LU12.04.2021
Former [2022/23]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE12.04.2021
LU12.04.2021
Former [2022/21]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
PT23.11.2020
IE12.04.2021
LU12.04.2021
Former [2022/10]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
PT23.11.2020
LU12.04.2021
Former [2022/04]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
LU12.04.2021
Former [2021/50]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/36]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/28]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/25]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/22]CZ22.07.2020
DK22.07.2020
EE22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/20]DK22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/10]FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/09]FI22.07.2020
LT22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
PT23.11.2020
Former [2021/08]FI22.07.2020
LT22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
PT23.11.2020
Former [2021/07]FI22.07.2020
LT22.07.2020
NO22.10.2020
Documents cited:Search[Y]DE202007017510U  (ENBW AG [DE]) [Y] 8-10* paragraph [0012] *;
 [XYI]DE102012103081  (SMA SOLAR TECHNOLOGY AG [DE]) [X] 1-5,7,11,12 * paragraph [0005] - paragraph [0085]; figures 3-5 * [Y] 8-10 [I] 6;
 [XY]DE102012224128  (BSH BOSCH UND SIEMENS HAUSGERÄTE GMBH [DE]) [X] 1,2,5,6,11 * paragraph [0007] - paragraph [0033] * [Y] 8-10;
 [XY]DE102013212489  (BAYERISCHE MOTOREN WERKE AG [DE]) [X] 1,11,13 * paragraph [0007] - paragraph [0038] * [Y] 8-10
by applicantUS2013096726
 DE102012224128
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.