blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3081756

EP3081756 - SYSTEM AND METHOD FOR MANUFACTURE OF ABRASIVE COATING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.04.2020
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  03.05.2019
FormerGrant of patent is intended
Status updated on  01.11.2018
FormerRequest for examination was made
Status updated on  07.04.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2016/43]
Former [2016/42]For all designated states
United Technologies Corporation
One Financial Plaza
Hartford, CT 06103 / US
Inventor(s)01 / STROCK, Christopher
1 Portland Road
Kennebunk, Maine 04043 / US
 [2016/42]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[N/P]
Former [2019/23]Dehns
St. Brides House
10 Salisbury Square
London EC4Y 8JD / GB
Former [2016/42]de Bresser, Sara Jean
Dehns St Bride's House 10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date16165570.915.04.2016
[2016/42]
Priority number, dateUS20151468765115.04.2015         Original published format: US201514687651
[2016/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3081756
Date:19.10.2016
Language:EN
[2016/42]
Type: B1 Patent specification 
No.:EP3081756
Date:05.06.2019
Language:EN
[2019/23]
Search report(s)(Supplementary) European search report - dispatched on:EP11.08.2016
ClassificationIPC:F01D5/28, F01D5/20, C23C30/00, F01D11/12, F04D29/02, F04D29/32
[2018/45]
CPC:
C23C30/00 (EP,US); F01D5/288 (US); B05B7/1481 (US);
B05D1/02 (US); B05D3/007 (US); F01D11/122 (EP,US);
F01D11/125 (US); F01D5/20 (US); F04D29/023 (EP,US);
F04D29/324 (EP,US); B05D1/12 (EP,US); B05D1/34 (EP,US);
B05D5/00 (EP,US); F05D2220/36 (EP,US); F05D2230/31 (EP,US);
F05D2230/90 (US); F05D2240/307 (EP,US); F05D2300/134 (US);
F05D2300/43 (EP,US); F05D2300/611 (US); Y02T50/60 (EP,US) (-)
Former IPC [2016/42]F01D5/28, F01D5/20, C23C30/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/19]
Former [2016/42]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM UND VERFAHREN ZUR HERSTELLUNG EINER SCHLEIFBESCHICHTUNG[2016/42]
English:SYSTEM AND METHOD FOR MANUFACTURE OF ABRASIVE COATING[2016/42]
French:SYSTÈME ET PROCÉDÉ DE FABRICATION D'UN REVÊTEMENT ABRASIF[2016/42]
Examination procedure15.04.2016Date on which the examining division has become responsible
04.04.2017Amendment by applicant (claims and/or description)
04.04.2017Examination requested  [2017/19]
02.11.2018Communication of intention to grant the patent
12.03.2019Fee for grant paid
12.03.2019Fee for publishing/printing paid
12.03.2019Receipt of the translation of the claim(s)
Opposition(s)06.03.2020No opposition filed within time limit [2020/20]
Fees paidRenewal fee
25.04.2018Renewal fee patent year 03
18.04.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.04.2016
AL05.06.2019
AT05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MK05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
[2022/32]
Former [2022/28]HU15.04.2016
AL05.06.2019
AT05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/52]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/25]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/22]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/17]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/13]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/12]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/11]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/10]AL05.06.2019
AT05.06.2019
CZ05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/09]AL05.06.2019
CZ05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2020/07]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/51]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/50]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
NO05.09.2019
GR06.09.2019
Former [2019/49]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/48]ES05.06.2019
FI05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/47]ES05.06.2019
FI05.06.2019
LT05.06.2019
NO05.09.2019
Documents cited:Search[X]US5211725  (FOWLIE ROBERT G [US], et al) [X] 5-10 * figures 29,30 * * column 33, lines 23-50 *;
 [XI]EP1801248  (MOMENTIVE PERFORMANCE MAT INC [US]) [X] 1,4-11,15 * page 6, paragraphs 44,47 * * page 5, paragraphs 37,38 * * page 7, paragraph 55 * * page 8, paragraphs 60,61,64 * [I] 2,3,12-14;
 [X]EP1865150  (SULZER METCO US INC [US]) [X] 5-8 * page 4, paragraph 32 - page 5, paragraph 35 * * page 5; table 2 * * page 7, paragraph 46 * * figure 15 *;
 [XP]EP2924242  (UNITED TECHNOLOGIES CORP [US]) [XP] 1,3,4* page 4, paragraphs 43,44,46,47 *;
 [X]  - CANAN U. HARDWICKE ET AL, "Advances in Thermal Spray Coatings for Gas Turbines and Energy Generation: A Review", JOURNAL OF THERMAL SPRAY TECHNOLOGY., US, (20130228), vol. 22, no. 5, doi:10.1007/s11666-013-9904-0, ISSN 1059-9630, pages 564 - 576, XP055221532 [X] 5-8 * page 571, paragraph 3.4.2 - page 572 * * page 572; figure 10 *

DOI:   http://dx.doi.org/10.1007/s11666-013-9904-0
 [X]  - E. PETROVICOVA ET AL, "Nylon 11/silica nanocomposite coatings applied by the HVOF process. I. Microstructure and morphology", JOURNAL OF APPLIED POLYMER SCIENCE, US, (20000101), vol. 77, no. 8, doi:10.1002/1097-4628(20000822)77:8<1684::AID-APP5>3.0.CO;2-Q, ISSN 0021-8995, pages 1684 - 1699, XP055292982 [X] 5-8 * page 1686, column r, paragraph Experimental - page 1687, column r, paragraph Coating procedure * * page 1687; figure 2 *

DOI:   http://dx.doi.org/10.1002/1097-4628(20000822)77:8<1684::AID-APP5>3.0.CO;2-Q
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.