blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3100836

EP3100836 - MANUFACTURING OF A BOARD [Right-click to bookmark this link]
Former [2016/49]BOARD AND ITS MANUFACTURING
[2017/20]
StatusNo opposition filed within time limit
Status updated on  04.09.2020
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  27.09.2019
FormerGrant of patent is intended
Status updated on  15.05.2019
FormerRequest for examination was made
Status updated on  24.11.2017
FormerThe application has been published
Status updated on  04.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Suomen Käsityöteollisuuden Oy
Sipilänkatu 13
30100 Forssa / FI
[2018/11]
Former [2016/49]For all designated states
Poranen, Taneli
31170 Savijoki / FI
Inventor(s)01 / Poranen, Taneli
Arvinkatu 2 A 1 a
20100 Turku / FI
 [2018/08]
Former [2016/49]01 / Poranen, Taneli
Suonpääntie 174
31170 Savijoki / FI
Representative(s)Genip Oy
Heikinkatu 7
48100 Kotka / FI
[2019/44]
Former [2016/49]Väisänen, Olli Jaakko
Vankanlähde 7
13100 Hämeenlinna / FI
Application number, filing date16165699.617.04.2016
[2016/49]
Priority number, dateFI2015000529217.04.2015         Original published format: FI 20155292
[2016/49]
Filing languageFI
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3100836
Date:07.12.2016
Language:EN
[2016/49]
Type: A3 Search report 
No.:EP3100836
Date:17.05.2017
Language:EN
[2017/20]
Type: B1 Patent specification 
No.:EP3100836
Date:30.10.2019
Language:EN
[2019/44]
Search report(s)(Supplementary) European search report - dispatched on:EP21.04.2017
ClassificationIPC:B27N3/02, E04C2/24, E04C2/16, // B27N3/04, B27N3/08
[2017/20]
CPC:
B27N3/02 (EP,FI); E04C2/16 (EP,FI); B27N3/04 (EP,FI);
B27N3/08 (EP,FI); B32B5/26 (FI); E04C2/24 (EP)
Former IPC [2016/49]B27N3/02, E04C2/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/52]
Former [2016/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HERSTELLUNG EINES PANEELS[2019/24]
English:MANUFACTURING OF A BOARD[2019/24]
French:FABRICATION D'UN PLATEAU[2019/24]
Former [2016/49]PANEEL UND DESSEN HERSTELLUNG
Former [2016/49]BOARD AND ITS MANUFACTURING
Former [2016/49]PANNEAU ET SA FABRICATION
Examination procedure17.04.2016Date on which the examining division has become responsible
17.11.2017Amendment by applicant (claims and/or description)
17.11.2017Examination requested  [2017/52]
16.05.2019Communication of intention to grant the patent
17.09.2019Fee for grant paid
17.09.2019Fee for publishing/printing paid
17.09.2019Receipt of the translation of the claim(s)
Opposition(s)31.07.2020No opposition filed within time limit [2020/41]
Fees paidRenewal fee
23.04.2018Renewal fee patent year 03
23.04.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.04.2016
AL30.10.2019
CY30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
MC30.10.2019
MK30.10.2019
MT30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
LU17.04.2020
[2022/32]
Former [2022/28]HU17.04.2016
AL30.10.2019
CY30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
MC30.10.2019
MT30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
LU17.04.2020
Former [2021/08]AL30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
MC30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
LU17.04.2020
Former [2020/52]AL30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
MC30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/51]AL30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/38]AL30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/35]AL30.10.2019
CZ30.10.2019
ES30.10.2019
HR30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/34]AL30.10.2019
ES30.10.2019
HR30.10.2019
PL30.10.2019
RS30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/32]AL30.10.2019
HR30.10.2019
PL30.10.2019
RS30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/25]HR30.10.2019
PL30.10.2019
RS30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/24]PL30.10.2019
BG30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/22]BG30.01.2020
PT02.03.2020
Documents cited:Search[Y]GB365536  (MASUZO SHIKATA) [Y] 1,2,9,11-13,15 * figure 1 * * claim 1 * * page 1, column 1, line 10 - line 15 * * page 1, column 1, line 28 - line 35 * * page 1, column 2, line 88 - line 97 *;
 [Y]US4382758  (NOPPER HERBERT [DE], et al) [Y] 1,2,4,9,12,13 * figure 1 * * claim 1 * * column 1, line 9 - line 17 * * column 1, line 21 - line 25 * * column 2, line 47 - column 3, line 4 * * column 3, line 12 - line 24 * * column 4, line 1 - line 4 * * column 4, line 12 - line 15 ** column 4, line 38 - line 50 *;
 [XAYI]US5346574  (TAMURA YASUO [JP], et al) [X] 1,4,5,11-13,15 * figures 1-5,8-10,14,15 * * column 1, line 9 - line 14 * * column 2, line 40 - line 68 * * column 4, line 10 - line 30 * * column 5, line 35 - line 49 * * column 5, line 54 - column 6, line 9 * * column 6, line 24 - line 32 * * column 6, line 4 - line 63 * * column 7, line 31 - line 39 * * example 1 * [A] 7,8 [Y] 1-6,9-15 [I] 14;
 [Y]US2011165375  (CLARK RANDY JON [US], et al) [Y] 1,4,5,11-15 * paragraphs [0003] , [0039] - [0041] - [0057] - [0061] - [0076] , [0077] * * figure 2 *;
 [YD]FI122883B  (KONTO OY [FI]) [YD] 1-3,6,9-15 * figures 1,2 * * page 1, line 2 - line 7 * * page 3, line 27 - line 32 * * page 4, line 1 - line 34 * * page 5, line 1 - line 33 * * claims 1-3,5-7,9-11 * * abstract *;
 [Y]US2013273244  (VETTER GEORG [SE], et al) [Y] 1,2,11-15 * figures 1-4 * * abstract * * paragraphs [0002] , [0074] - [0098] *
by applicantFI122883B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.