blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3244489

EP3244489 - TERMINAL BLOCK WITH MARKING-HOLDER CAPABLE OF BEING SECURED IN A HOLE OF A SHUNT [Right-click to bookmark this link]
Former [2017/46]MARKING-HOLDER CAPABLE OF BEING SECURED IN A HOLE OF A SHUNT OF A TERMINAL BLOCK
[2020/39]
StatusNo opposition filed within time limit
Status updated on  22.10.2021
Database last updated on 20.09.2024
FormerThe patent has been granted
Status updated on  13.11.2020
FormerGrant of patent is intended
Status updated on  13.09.2020
FormerExamination is in progress
Status updated on  11.01.2019
FormerRequest for examination was made
Status updated on  18.05.2018
FormerThe application has been published
Status updated on  13.10.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
TE Connectivity Services GmbH
Mühlenstrasse 26
8200 Schaffhausen / CH
[2020/47]
Former [2020/09]For all designated states
TE Connectivity Services GmbH
Rheinstrasse 20
8200 Schaffhausen / CH
Former [2019/10]For all designated states
Tyco Electronics Services GmbH
Rheinstrasse 20
8200 Schaffhausen / CH
Former [2017/46]For all designated states
ABB Schweiz AG
Brown Boveri Strasse 6
5400 Baden / CH
Inventor(s)01 / CHAILLET, Alexandre
3 rue Claude Debussy
69009 Lyon / FR
02 / FRANCE, Philippe
6 rue de la Gimond
42140 Chazelles sur Lyon / FR
03 / IMPERATO, André
6b chemin de Montlouis
69600 Oullins / FR
 [2017/46]
Representative(s)Germain Maureau
12, rue Boileau
69006 Lyon / FR
[N/P]
Former [2017/46]Verriest, Philippe, et al
Cabinet Germain & Maureau
12, rue Boileau
BP 6153
69466 Lyon Cedex 06 / FR
Application number, filing date16169285.012.05.2016
[2017/46]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3244489
Date:15.11.2017
Language:FR
[2017/46]
Type: B1 Patent specification 
No.:EP3244489
Date:16.12.2020
Language:FR
[2020/51]
Search report(s)(Supplementary) European search report - dispatched on:EP24.10.2016
ClassificationIPC:H01R9/24, // H01R9/26
[2017/46]
CPC:
H01R9/2475 (EP); H01R9/2633 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/25]
Former [2017/46]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANSCHLUSSLEISTE MIT KENNZEICHNUNGSSCHILD ZUM BEFESTIGEN IN EINER SHUNT-VERTIEFUNG[2020/39]
English:TERMINAL BLOCK WITH MARKING-HOLDER CAPABLE OF BEING SECURED IN A HOLE OF A SHUNT[2020/39]
French:BLOC DE JONCTION AVEC PORTE-REPÈRE APTE À ÊTRE FIXÉ DANS UN PUITS DE SHUNT[2020/39]
Former [2017/46]KENNZEICHNUNGSSCHILD ZUM BEFESTIGEN IN EINER SHUNT-VERTIEFUNG EINER ANSCHLUSSLEISTE
Former [2017/46]MARKING-HOLDER CAPABLE OF BEING SECURED IN A HOLE OF A SHUNT OF A TERMINAL BLOCK
Former [2017/46]PORTE-REPÈRE APTE À ÊTRE FIXÉ DANS UN PUITS DE SHUNT D'UN BLOC DE JONCTION
Examination procedure12.05.2016Date on which the examining division has become responsible
15.05.2018Amendment by applicant (claims and/or description)
15.05.2018Examination requested  [2018/25]
10.01.2019Despatch of a communication from the examining division (Time limit: M06)
01.07.2019Reply to a communication from the examining division
14.09.2020Communication of intention to grant the patent
06.11.2020Fee for grant paid
06.11.2020Fee for publishing/printing paid
06.11.2020Receipt of the translation of the claim(s)
Opposition(s)17.09.2021No opposition filed within time limit [2021/47]
Fees paidRenewal fee
25.05.2018Renewal fee patent year 03
15.05.2019Renewal fee patent year 04
31.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.05.2016
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
MT16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
TR16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
[2024/41]
Former [2024/29]HU12.05.2016
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
TR16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2024/22]HU12.05.2016
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/30]HU12.05.2016
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/29]HU12.05.2016
AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/34]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/23]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/21]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
IE12.05.2021
LU12.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/11]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
LU12.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/10]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
LU12.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/08]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
LU12.05.2021
Former [2022/07]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/49]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/48]AL16.12.2020
AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/45]AL16.12.2020
AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/42]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/39]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/37]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/36]CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/35]CZ16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/34]CZ16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/33]FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/32]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/30]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/28]FI16.12.2020
HR16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/23]FI16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/22]FI16.12.2020
RS16.12.2020
NO16.03.2021
Former [2021/20]FI16.12.2020
Documents cited:Search[XYI]GB1380533  (HEGO ELECTRIC GMBH) [X] 1,10,15 * page 2 - page 3; figures 1,3 * [Y] 2-8,11-14 [I] 9;
 [A]DE2914192  (WIELAND ELEKTRISCHE INDUSTRIE) [A] 1-15* figure 1 *;
 [A]EP0848452  (ENTRELEC SA [FR]) [A] 1-15 * figures 1,3 *;
 [YDA]DE202008013609U  (WEIDMUELLER INTERFACE [DE]) [YD] 2-8,11-14 * paragraph [0050] - paragraph [0056]; figures 5-17 * [A] 1,9,10,15;
 [A]WO2012041778  (WEIDMUELLER INTERFACE [DE], et al) [A] 1-15 * figures 1,2 *
by applicantDE202008013609U
 DE202009003250U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.