blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3099059

EP3099059 - CAMERA HAVING HDR DURING PRE-FLASH [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.12.2021
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  25.12.2020
FormerGrant of patent is intended
Status updated on  08.10.2020
FormerExamination is in progress
Status updated on  29.06.2019
FormerRequest for examination was made
Status updated on  12.05.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, ON N2K 0A7 / CA
[2021/04]
Former [2016/48]For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, ON N2K 0A7 / CA
Inventor(s)01 / HSU, Cheng-Sheng
434 Sandy Cove Cres.
Waterloo, Ontario N2K 4B6 / CA
02 / VAN HOECKEL, Martin Frank Clayton
2200 University Avenue East
Ext. 10692
Waterloo, Ontario N2K 0A7 / CA
03 / SHAH, Joey
1378 Sheffield Road
RR No. 1
Cambridge, Ontario N1R 5S2 / CA
04 / HONG, Sung Ho
367 Lake Louise Blvd.
Waterloo, Ontario N2V 2H2 / CA
 [2016/48]
Representative(s)Vigand, Philippe, et al
Novagraaf International SA
Chemin de l'Echo 3
1213 Onex - Genève / CH
[2021/04]
Former [2016/48]Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
Application number, filing date16169731.313.05.2016
[2016/48]
Priority number, dateUS20151472390028.05.2015         Original published format: US201514723900
[2016/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3099059
Date:30.11.2016
Language:EN
[2016/48]
Type: B1 Patent specification 
No.:EP3099059
Date:27.01.2021
Language:EN
[2021/04]
Search report(s)(Supplementary) European search report - dispatched on:EP28.09.2016
ClassificationIPC:H04N5/235
[2016/48]
CPC:
H04N23/71 (EP,US); H04N23/741 (EP,US); H04N23/56 (US);
H04N23/74 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/24]
Former [2016/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KAMERA MIT HDR BEIM VORBLITZ[2016/48]
English:CAMERA HAVING HDR DURING PRE-FLASH[2016/48]
French:CAMÉRA AYANT UN HDR PENDANT LE PRÉ-FLASH[2016/48]
Examination procedure13.05.2016Date on which the examining division has become responsible
05.05.2017Amendment by applicant (claims and/or description)
05.05.2017Examination requested  [2017/24]
03.07.2019Despatch of a communication from the examining division (Time limit: M04)
23.10.2019Reply to a communication from the examining division
13.05.2020Despatch of a communication from the examining division (Time limit: M01)
20.05.2020Reply to a communication from the examining division
09.10.2020Communication of intention to grant the patent
16.12.2020Fee for grant paid
16.12.2020Fee for publishing/printing paid
16.12.2020Receipt of the translation of the claim(s)
Opposition(s)28.10.2021No opposition filed within time limit [2022/01]
Fees paidRenewal fee
29.05.2018Renewal fee patent year 03
28.05.2019Renewal fee patent year 04
27.05.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.05.2016
AL27.01.2021
AT27.01.2021
CY27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
MK27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
TR27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
[2024/29]
Former [2024/22]HU13.05.2016
AL27.01.2021
AT27.01.2021
CY27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
MK27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/30]HU13.05.2016
AL27.01.2021
AT27.01.2021
CY27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/29]HU13.05.2016
AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/34]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/23]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/21]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IE13.05.2021
LU13.05.2021
PT27.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/11]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
LU13.05.2021
PT27.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/10]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
LU13.05.2021
PT27.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/09]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
LU13.05.2021
IS27.05.2021
PT27.05.2021
Former [2022/07]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/51]AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/50]AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/49]AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/48]AT27.01.2021
CZ27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/46]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
SM27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/42]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/39]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/38]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
RS27.01.2021
SE27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/37]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
NL27.01.2021
RS27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/36]FI27.01.2021
HR27.01.2021
LT27.01.2021
NL27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/35]FI27.01.2021
HR27.01.2021
LT27.01.2021
NL27.01.2021
NO27.04.2021
PT27.05.2021
Former [2021/34]FI27.01.2021
LT27.01.2021
NL27.01.2021
NO27.04.2021
PT27.05.2021
Former [2021/33]FI27.01.2021
LT27.01.2021
NO27.04.2021
PT27.05.2021
Documents cited:Search[XI]US2015130967  (PIEPER SEAN [US]) [X] 1,2,4,6,9-11 * paragraph [0045]; figure 1 *[I] 3,5,7,8
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.