blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3098210

EP3098210 - PRECERAMIC IONIC SYSTEMS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 08.10.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  02.04.2020
FormerExamination is in progress
Status updated on  09.02.2018
FormerRequest for examination was made
Status updated on  02.06.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2021/12]
Former [2016/48]For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Inventor(s)01 / SCHMIDT, Wayde
7 Amberg Drive
Pomfret Center
06259, CT Connecticut / US
 [2016/48]
Representative(s)Dehns
10 Old Bailey
London EC4M 7NG / GB
[N/P]
Former [2020/37]Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Former [2016/48]de Bresser, Sara Jean
Dehns St Bride's House 10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date16171687.327.05.2016
[2016/48]
Priority number, dateUS20151472520829.05.2015         Original published format: US201514725208
[2016/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3098210
Date:30.11.2016
Language:EN
[2016/48]
Type: B1 Patent specification 
No.:EP3098210
Date:09.09.2020
Language:EN
[2020/37]
Search report(s)(Supplementary) European search report - dispatched on:EP29.09.2016
ClassificationIPC:C04B35/571, C04B35/589, C04B35/597, F01D5/28, F01D5/14
[2020/16]
CPC:
C04B35/571 (EP,US); C01B21/087 (US); C04B35/589 (EP,US);
C04B35/597 (EP,US); C04B35/71 (US); C08G77/04 (US);
F01D5/14 (EP); F01D5/284 (EP,US); C04B2235/3232 (EP,US);
C04B2235/44 (EP,US); C04B2235/48 (EP,US); C04B2235/483 (EP,US);
C04B2235/80 (EP,US); F05D2300/43 (EP); F05D2300/6033 (EP,US) (-)
Former IPC [2016/48]C04B35/571, C04B35/589, C04B35/597, F01D5/28
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/27]
Former [2016/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PRÄKERAMISCHE IONISCHE SYSTEME[2016/48]
English:PRECERAMIC IONIC SYSTEMS[2016/48]
French:SYSTÈMES IONIQUES PRÉCÉRAMIQUES[2016/48]
Examination procedure27.05.2016Date on which the examining division has become responsible
30.05.2017Amendment by applicant (claims and/or description)
30.05.2017Examination requested  [2017/27]
07.02.2018Despatch of a communication from the examining division (Time limit: M04)
18.06.2018Reply to a communication from the examining division
20.02.2019Despatch of a communication from the examining division (Time limit: M06)
02.10.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
28.11.2019Reply to a communication from the examining division
03.04.2020Communication of intention to grant the patent
31.07.2020Fee for grant paid
31.07.2020Fee for publishing/printing paid
31.07.2020Receipt of the translation of the claim(s)
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
28.11.2019Request for further processing filed
28.11.2019Full payment received (date of receipt of payment)
Request granted
09.12.2019Decision despatched
Fees paidRenewal fee
25.05.2018Renewal fee patent year 03
21.05.2019Renewal fee patent year 04
20.05.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.05.2016
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
[2024/41]
Former [2024/29]HU27.05.2016
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2024/22]HU27.05.2016
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/30]HU27.05.2016
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/29]HU27.05.2016
AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/34]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/21]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE27.05.2021
LU27.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/11]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
LU27.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/09]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
LU27.05.2021
Former [2022/07]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/48]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/23]AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/18]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
NL09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[XI]EP0915067  (DOW CORNING ASIA LTD [JP]) [X] 1,2,7-11 * paragraph [0014]; examples 15-22; tables 8-10 * [I] 4-6;
 [XI]US2005036931  (GARCIA CARLOS [US], et al) [X] 1-3,6,8-11 * paragraphs [0017] , [0 18] , [0025] - [0027] - [0036] *[I] 4,5;
 [XI]US2005159293  (WAN JULIN [US], et al) [X] 1-3,6,8-11 * paragraphs [0022] - [0024] - [0030] - [0034]; figure 1 * [I] 4,5,7,12-15;
 [XI]EP1801071  (GEN ELECTRIC [US]) [X] 1-3,6,8-11 * paragraph [0013]; examples 1-6 * [I] 4,5,7,12-15;
 [E]EP3061604  (UNITED TECHNOLOGIES CORP [US]) [E] 1,2,4-6,8-15 * paragraphs [0008] , [0017] , [0018] , [0025] - [0028] - [0050] *
ExaminationCN104211967
    - AKKAS H D ET AL, "Silicon oxycarbide-based composites produced from pyrolysis of polysiloxanes with active Ti filler", JOURNAL OF THE EUROPEAN CERAMIC SOCIETY, ELSEVIER SCIENCE PUBLISHERS, BARKING, ESSEX, GB, vol. 26, no. 15, doi:10.1016/J.JEURCERAMSOC.2005.08.017, ISSN 0955-2219, (20060101), pages 3441 - 3449, (20060101), XP024960359

DOI:   http://dx.doi.org/10.1016/j.jeurceramsoc.2005.08.017
    - Emanuel Ionescu ET AL, "Polymer-Derived Ceramics (PDCs): Materials Design towards Applications at Ultrahigh-Temperatures and in Extreme Environments", MAX Phases and Ultra-High Temperature Ceramics for Extreme Environments, Hershey, USA, IGI Global, (20130101), pages 203 - 245, doi:10.4018/978-1-4666-4066-5.ch0071, XP055554413

DOI:   http://dx.doi.org/10.4018/978-1-4666-4066-5.ch0071
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.